Upload Button Icon Add office photos

Filter interviews by

Marico Maintenance Engineer Interview Questions and Answers

Updated 16 Apr 2024

Marico Maintenance Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Technical Questions
Round 2 - HR 

(1 Question)

  • Q1. Asked about my self

Interview Preparation Tips

Interview preparation tips for other job seekers - Excellent

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Explain completed details of Errection & Comissining of Pneumatic Compressor?
  • Ans. 

    Erection and commissioning of a pneumatic compressor involves assembling the components, connecting the necessary piping, testing for functionality, and fine-tuning for optimal performance.

    • Assemble the components of the pneumatic compressor according to the manufacturer's instructions.

    • Connect the necessary piping for air intake, compression, and output.

    • Test the compressor for functionality by running it empty and check...

  • Answered by AI
  • Q2. How to calculate blowdown of cooling tower? What are the maintenance practice followed in maintenance efficiency of cooling tower? How to calculate capacity of cooling tower?
  • Ans. 

    Blowdown of cooling tower can be calculated using cycles of concentration. Maintenance practices include regular cleaning, inspection, and water treatment. Cooling tower capacity can be calculated based on heat load and design parameters.

    • Calculate blowdown using cycles of concentration formula: Blowdown = Evaporation Loss / (Cycles of Concentration - 1)

    • Maintenance practices include regular cleaning of cooling tower fil...

  • Answered by AI
  • Q3. Explain RCM in detail ?
  • Ans. 

    RCM stands for Reliability Centered Maintenance, a proactive maintenance strategy focused on identifying and preventing equipment failures.

    • RCM is a systematic approach to maintenance planning that aims to optimize maintenance tasks to ensure equipment reliability.

    • It involves analyzing the functions and potential failure modes of equipment to determine the most effective maintenance strategies.

    • RCM prioritizes maintenanc...

  • Answered by AI
  • Q4. Classify pumps on the basis of casings ?
  • Ans. 

    Pumps can be classified based on their casings as follows: volute casing, axial split casing, and radial split casing.

    • Volute casing pumps have a spiral-shaped casing that gradually expands to the discharge outlet.

    • Axial split casing pumps have a casing split along the horizontal centerline of the pump.

    • Radial split casing pumps have a casing split along the vertical centerline of the pump.

  • Answered by AI
  • Q5. Explain the working principle of Air compressor ?
  • Ans. 

    Air compressor works by compressing air to increase its pressure and decrease its volume.

    • Air is drawn into the compressor through an intake valve.

    • The air is then compressed using a piston or rotating impeller.

    • Compressed air is stored in a tank or released directly for use.

    • Examples of air compressors include reciprocating, rotary screw, and centrifugal compressors.

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is control system What is process control
  • Ans. 

    Control system is a system that manages, commands, directs or regulates the behavior of other devices or systems.

    • Control system is used to manage and regulate the behavior of other devices or systems

    • It involves the use of sensors, actuators, and controllers to maintain a desired output

    • Examples include HVAC systems, traffic lights, and industrial automation systems

    • Process control is a type of control system that is used...

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Salary expectation , working experience, your next plan

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your cv updated , Don not add any topics on which you have no idea
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. Related to experience journey
  • Q2. Related to technical and documentation.
  • Q3. How to maintained machinery spares.
  • Ans. 

    Maintaining machinery spares involves proper storage, inventory management, regular inspections, and timely replacements.

    • Create a detailed inventory of all machinery spares including part numbers, quantities, and locations.

    • Store spares in a designated area that is clean, organized, and easily accessible.

    • Implement a system for regular inspections to check for wear and tear, damage, or expiration dates.

    • Establish a schedu...

  • Answered by AI
  • Q4. How to be motivated our technical team
  • Ans. 

    Motivate the technical team by setting clear goals, providing recognition, offering training opportunities, and fostering a positive work environment.

    • Set clear goals and expectations for the team to work towards.

    • Provide recognition for their hard work and achievements.

    • Offer training opportunities to help them develop their skills and advance in their careers.

    • Foster a positive work environment by promoting teamwork, com...

  • Answered by AI
  • Q5. How to be maintained deciplin.
  • Ans. 

    Maintaining discipline requires clear expectations, consistent enforcement, positive reinforcement, and effective communication.

    • Set clear expectations for behavior and performance.

    • Consistently enforce rules and policies.

    • Provide positive reinforcement for good behavior.

    • Communicate effectively with team members about expectations and consequences.

    • Lead by example and demonstrate the behavior you expect from others.

  • Answered by AI
  • Q6. #. Related to safety coordination
  • Q7. #. Related to new machine installation.

Interview Preparation Tips

Interview preparation tips for other job seekers - # Don't confuse having a career with having a life.
# If opportunity doesn't knock, build a aim
# Keep yourself busy.
# Dedicate Time to the search.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Can PLC be repaired
  • Ans. 

    Yes, PLC can be repaired by troubleshooting, replacing faulty components, and reprogramming if necessary.

    • PLC can be repaired by troubleshooting to identify the root cause of the issue.

    • Faulty components can be replaced to restore the functionality of the PLC.

    • Reprogramming may be necessary if the issue is related to the software or logic of the PLC.

    • Regular maintenance and timely repairs can help prevent major breakdowns

  • Answered by AI
  • Q2. DG maintenance process?
  • Ans. 

    DG maintenance process involves regular inspections, testing, and servicing of diesel generators to ensure optimal performance and reliability.

    • Regularly inspecting the diesel generator for any signs of wear or damage

    • Testing the generator's components such as fuel system, cooling system, and electrical system

    • Servicing the generator by changing oil, filters, and spark plugs as needed

    • Keeping maintenance records and schedu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice interviewers

I applied via LinkedIn and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Maintenace technical

Interview Preparation Tips

Interview preparation tips for other job seekers - i job to colgaet to experience 3.5 year

Interview Questionnaire 

1 Question

  • Q1. In detail about packing machines chillers and other mechanical components

Interview Preparation Tips

Interview preparation tips for other job seekers - Hands on work experience is prefered

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Safety during confined space?
  • Ans. 

    Safety during confined space is crucial to prevent accidents and ensure the well-being of workers.

    • Proper training and education on confined space hazards

    • Use of personal protective equipment (PPE) such as respirators, harnesses, and gas detectors

    • Implementing a permit system to control access and monitor activities

    • Continuous monitoring of atmospheric conditions

    • Establishing emergency procedures and rescue plans

    • Regular equ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Was tough
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is smps. How it's work
  • Ans. 

    SMPS stands for Switched Mode Power Supply. It is a type of power supply that uses switching devices to convert electrical power efficiently.

    • SMPS converts AC voltage to DC voltage through a series of switching components

    • It is more efficient than traditional linear power supplies

    • Commonly used in electronic devices like computers, TVs, and LED lights

    • Helps regulate voltage and current to provide stable power output

  • Answered by AI
  • Q2. Panel control wiring

Interview Preparation Tips

Topics to prepare for Emami Maintenance Electrician interview:
  • Electricals

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Explain completed details of Errection & Comissining of Pneumatic Compressor?
  • Ans. 

    Erection and commissioning of a pneumatic compressor involves assembling the components, connecting the necessary piping, testing for functionality, and fine-tuning for optimal performance.

    • Assemble the components of the pneumatic compressor according to the manufacturer's instructions.

    • Connect the necessary piping for air intake, compression, and output.

    • Test the compressor for functionality by running it empty and check...

  • Answered by AI
  • Q2. How to calculate blowdown of cooling tower? What are the maintenance practice followed in maintenance efficiency of cooling tower? How to calculate capacity of cooling tower?
  • Ans. 

    Blowdown of cooling tower can be calculated using cycles of concentration. Maintenance practices include regular cleaning, inspection, and water treatment. Cooling tower capacity can be calculated based on heat load and design parameters.

    • Calculate blowdown using cycles of concentration formula: Blowdown = Evaporation Loss / (Cycles of Concentration - 1)

    • Maintenance practices include regular cleaning of cooling tower fil...

  • Answered by AI
  • Q3. Explain RCM in detail ?
  • Ans. 

    RCM stands for Reliability Centered Maintenance, a proactive maintenance strategy focused on identifying and preventing equipment failures.

    • RCM is a systematic approach to maintenance planning that aims to optimize maintenance tasks to ensure equipment reliability.

    • It involves analyzing the functions and potential failure modes of equipment to determine the most effective maintenance strategies.

    • RCM prioritizes maintenanc...

  • Answered by AI
  • Q4. Classify pumps on the basis of casings ?
  • Ans. 

    Pumps can be classified based on their casings as follows: volute casing, axial split casing, and radial split casing.

    • Volute casing pumps have a spiral-shaped casing that gradually expands to the discharge outlet.

    • Axial split casing pumps have a casing split along the horizontal centerline of the pump.

    • Radial split casing pumps have a casing split along the vertical centerline of the pump.

  • Answered by AI
  • Q5. Explain the working principle of Air compressor ?
  • Ans. 

    Air compressor works by compressing air to increase its pressure and decrease its volume.

    • Air is drawn into the compressor through an intake valve.

    • The air is then compressed using a piston or rotating impeller.

    • Compressed air is stored in a tank or released directly for use.

    • Examples of air compressors include reciprocating, rotary screw, and centrifugal compressors.

  • Answered by AI

Marico Interview FAQs

How many rounds are there in Marico Maintenance Engineer interview?
Marico interview process usually has 2 rounds. The most common rounds in the Marico interview process are Technical and HR.
How to prepare for Marico Maintenance Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Marico. The most common topics and skills that interviewers at Marico expect are Boiler, Boiler House, Boiler Operations, Electrical Maintenance and Electricals.

Tell us how to improve this page.

Marico Maintenance Engineer Interview Process

based on 4 interviews

Interview experience

4
  
Good
View more
Marico Maintenance Engineer Salary
based on 9 salaries
₹1.2 L/yr - ₹5.8 L/yr
18% less than the average Maintenance Engineer Salary in India
View more details

Marico Maintenance Engineer Reviews and Ratings

based on 5 reviews

4.5/5

Rating in categories

4.6

Skill development

4.7

Work-life balance

4.7

Salary

4.7

Job security

4.8

Company culture

4.7

Promotions

4.8

Work satisfaction

Explore 5 Reviews and Ratings
Territory Sales Executive
341 salaries
unlock blur

₹6.8 L/yr - ₹18.4 L/yr

Teritory Sales Officer
315 salaries
unlock blur

₹5 L/yr - ₹12 L/yr

Production Officer
155 salaries
unlock blur

₹1.4 L/yr - ₹5 L/yr

Area Sales Manager
96 salaries
unlock blur

₹17.1 L/yr - ₹40 L/yr

Sales Executive
91 salaries
unlock blur

₹1.2 L/yr - ₹5.8 L/yr

Explore more salaries
Compare Marico with

Dabur

4.0
Compare

Godrej Consumer Products

4.1
Compare

Hindustan Unilever

4.2
Compare

Britannia

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview