Filter interviews by
I applied via Campus Placement and was interviewed in Dec 2024. There were 4 interview rounds.
Some details are studying in the devops
The study is very important
Wipro Enterprises Ltd interview questions for popular designations
I was interviewed before Feb 2024.
Get interview-ready with Top Wipro Enterprises Ltd Interview Questions
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 2 interview rounds.
RO stands for Reverse Osmosis, a water purification technology. Membrane is a semi-permeable barrier used in RO process.
RO is a water treatment process that uses a partially permeable membrane to remove ions, molecules, and larger particles from drinking water.
Membrane is a thin layer of material that acts as a barrier, allowing certain substances to pass through while blocking others.
Examples of membranes used in RO i...
Ultrafiltration is a process used to separate suspended solids and solutes of high molecular weight from water. Activated carbon filters remove organic compounds and chlorine from water.
Ultrafiltration is a type of membrane filtration where hydrostatic pressure forces a liquid against a semipermeable membrane to separate particles.
Activated carbon filters use a bed of activated carbon to remove impurities and contamina...
Parameters are variables that can be measured or controlled in a system, process, or experiment.
Parameters are used to define the characteristics or behavior of a system.
They can be adjusted or monitored to achieve desired outcomes.
Examples include temperature, pressure, flow rate, pH level, etc.
I applied via Superset and was interviewed in Jun 2024. There were 4 interview rounds.
Aptitude, logical reasoning and coding questions are asked in 1st round
I was interviewed in Dec 2024.
Introduction to previous work experience.
2 case study they have provided E2b form n narrative writing
It was bit difficult basic were asked
Top trending discussions
The duration of Wipro Enterprises Ltd interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 142 interviews
Interview experience
based on 1.3k reviews
Rating in categories
Project Engineer
286
salaries
| ₹2.4 L/yr - ₹8.4 L/yr |
Senior Software Engineer
235
salaries
| ₹6.2 L/yr - ₹23.2 L/yr |
Senior Associate
202
salaries
| ₹1.4 L/yr - ₹5.7 L/yr |
Associate
156
salaries
| ₹1.2 L/yr - ₹4.5 L/yr |
Technical Lead
143
salaries
| ₹9.6 L/yr - ₹30 L/yr |
Tata Group
Reliance Industries
Aditya Birla Group
Mahindra & Mahindra