Upload Button Icon Add office photos

Maccaferri

Compare button icon Compare button icon Compare

Filter interviews by

Maccaferri Interview Questions and Answers

Updated 9 Jan 2025

Maccaferri Interview Experiences

Popular Designations

9 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What are the different types of geotechnical strengthening methods?

Senior Quality Engineer Interview Questions asked at other Companies

Q1. what is least count of vernier caliper ,micrometer, height gauge?
View answer (13)

Project Engineer Interview Questions & Answers

user image Shubham Singh

posted on 14 Mar 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Ask about previous work & their company profile.
Round 2 - One-on-one 

(1 Question)

  • Q1. Ask about soil properties & PI value.

Interview Preparation Tips

Interview preparation tips for other job seekers - No worries about interview be confident.

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (10)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Time,speed,distance,calculation,height and distance,profit and loss

Round 2 - Coding Test 

Basic knowledge of coding

Software Developer Interview Questions asked at other Companies

Q1. Maximum Subarray Sum Problem Statement Given an array of integers, determine the maximum possible sum of any contiguous subarray within the array. Example: Input: array = [34, -50, 42, 14, -5, 86] Output: 137 Explanation: The maximum sum is... read more
View answer (38)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Detailed technical questions are always asked. How do you plan forecasting for Raw materials procurement. How do you negotiate for prices with vendor. Strategy for maintaining low inverter cost without ...
  • Q2. How good are you with Excel and power BI.

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join this firm, unless you have no personal life and don't want to get good salary despite working 24x7.

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (67)

Maccaferri interview questions for popular designations

 Assistant Engineer

 (1)

 Deputy Manager

 (1)

 Engineer

 (1)

 Production Engineer

 (1)

 Project Engineer

 (1)

 Quality Engineer

 (1)

 Senior Quality Engineer

 (1)

 Senior Site Engineer

 (1)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Please about your self
  • Q2. What is working nature of previous company.
  • Q3. Please tell me about your family
Round 3 - Technical 

(5 Questions)

  • Q1. What is your woking of previous company.
  • Q2. Max questions tell me from my previous company working nature.
  • Q3. Some questions tell me by my professional related.
  • Q4. Some questions tell me subject in mechanical part.
  • Q5. Some questions carry by project.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please tell about true and please be confidently answers.

Production Engineer Interview Questions asked at other Companies

Q1. How to solve the problem in robot means how to detect fault?
View answer (9)

I applied via Job Portal and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Nothing, Just wash your mind that we have MNC ,Great place to work , good culture. No means of your experience & line , They need person and wash his mind and select.
  • Q2. Are to ready to Joint World no 1 company Maccaferri ,

Interview Preparation Tips

Interview preparation tips for other job seekers - Please do not Join maccaferri in Quality group. Boss is not good.

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)

Engineer Interview Questions & Answers

user image Anonymous

posted on 11 May 2018

I applied via Company Website and was interviewed before May 2017. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to your experience.

Interview Preparation Tips

Be strong technically about soil mechanics and Concrete Technology.

Engineer Interview Questions asked at other Companies

Q1. ❖ If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (7)

Interview Questionnaire 

1 Question

  • Q1. Describe your previous company work??

Senior Site Engineer Interview Questions asked at other Companies

Q1. How many days will take 1st Aluform mockup Concreting
View answer (1)

I applied via Company Website and was interviewed before May 2018. There were 3 interview rounds.

Interview Preparation Tips

Round: Resume Shortlist
Experience: Based on my qualifications and personal experience about the applying for the job.

General Tips: Telephonic technical interview based on my qualifications experience communication skills .
Duration: 1-4 weeks

Assistant Engineer Interview Questions asked at other Companies

Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
View answer (9)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(6 Questions)

  • Q1. Stp maintanence and operation
  • Q2. Transformer oil test
  • Q3. Power unit cost
  • Ans. 

    Power unit cost refers to the cost of electricity consumed by a specific unit or equipment.

    • Power unit cost can vary depending on the electricity provider and the location.

    • Calculating power unit cost involves dividing the total cost of electricity by the total number of units consumed.

    • Factors such as energy efficiency and peak/off-peak usage can impact the power unit cost.

    • For example, a company may pay $0.12 per kilowat...

  • Answered by AI
  • Q4. Transformer maximum demand
  • Q5. How you are collecting maintenance charges from residents
  • Ans. 

    Maintenance charges are collected through various methods to ensure timely payments from residents.

    • Maintenance charges are typically collected on a monthly basis.

    • Residents can pay their maintenance charges through online portals, bank transfers, or in-person at the management office.

    • Late fees may be applied for overdue payments to encourage timely payments.

    • Regular reminders and notifications are sent to residents to re...

  • Answered by AI
  • Q6. What was the unit sft cost
  • Ans. 

    The unit sft cost refers to the cost per square foot for a particular unit or space.

    • Unit sft cost is calculated by dividing the total cost of the unit by the total square footage of the unit.

    • For example, if a unit costs $100,000 and has a total square footage of 1,000, the unit sft cost would be $100 per square foot.

    • Unit sft cost is commonly used in real estate and construction to determine the cost efficiency of a spa

  • Answered by AI

Maccaferri Interview FAQs

How many rounds are there in Maccaferri interview?
Maccaferri interview process usually has 2 rounds. The most common rounds in the Maccaferri interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for Maccaferri interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Maccaferri. The most common topics and skills that interviewers at Maccaferri expect are Checking, Construction, Cost Reduction, Dreamweaver and Freescale.
What are the top questions asked in Maccaferri interview?

Some of the top questions asked at the Maccaferri interview -

  1. Detailed technical questions are always asked. How do you plan forecasting for...read more
  2. Nothing, Just wash your mind that we have MNC ,Great place to work , good cultu...read more
  3. Are to ready to Joint World no 1 company Maccaferr...read more

Tell us how to improve this page.

Maccaferri Interview Process

based on 9 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

DRA Homes Interview Questions
4.6
 • 23 Interviews
JP Infra Interview Questions
3.8
 • 19 Interviews
N.K. Realtors Interview Questions
4.2
 • 19 Interviews
DTC Projects Interview Questions
4.1
 • 17 Interviews
PS Group Interview Questions
3.7
 • 16 Interviews
ATS Homekraft Interview Questions
4.1
 • 16 Interviews
Bullmen Realty Interview Questions
2.9
 • 14 Interviews
View all

Maccaferri Reviews and Ratings

based on 134 reviews

3.9/5

Rating in categories

3.6

Skill development

3.7

Work-life balance

3.9

Salary

3.7

Job security

3.8

Company culture

3.4

Promotions

3.6

Work satisfaction

Explore 134 Reviews and Ratings
Senior Engineer
44 salaries
unlock blur

₹4.5 L/yr - ₹8.7 L/yr

Assistant Manager
23 salaries
unlock blur

₹7 L/yr - ₹12.5 L/yr

Deputy Manager
21 salaries
unlock blur

₹10 L/yr - ₹16.5 L/yr

Civil Engineer
14 salaries
unlock blur

₹3.5 L/yr - ₹6.5 L/yr

Production Engineer
14 salaries
unlock blur

₹3 L/yr - ₹4.6 L/yr

Explore more salaries
Compare Maccaferri with

Realty Assistant

4.2
Compare

DRA Homes

4.6
Compare

Kunal Structure

3.7
Compare

Omkar Realtors and Developers Group

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview