The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was
I applied via Referral and was interviewed in Nov 2020. There was 1 interview round.
Tiling work involves preparing the surface, measuring and cutting tiles, applying adhesive, laying tiles, and grouting.
Clean and prepare the surface to be tiled
Measure and cut tiles to fit the area
Apply adhesive to the surface and lay tiles in a pattern
Allow adhesive to dry and then apply grout to fill gaps between tiles
Clean excess grout and allow it to dry completely
Stone work involves the process of cutting, shaping, and placing stones to create structures or decorative features.
Selecting the appropriate type of stone for the project
Cutting and shaping the stones using tools such as chisels and hammers
Laying out the stones in a pattern or design
Applying mortar or other bonding agents to secure the stones in place
Finishing the surface of the stones to achieve the desired texture o
The project duration can vary depending on the scope, complexity, and resources available.
Project duration is typically determined during the planning phase
Factors such as scope changes, resource availability, and unexpected challenges can impact project duration
It is important to regularly monitor and adjust the project timeline as needed
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
How many children and studying in class?
I currently live in New York City with my spouse and two children.
Living in New York City with spouse and two children
Total of four dependents including spouse and two children
Yes , after successful interview round, received offer letter from the company and same day replied.
Yes , after successful interview round, received offer.
posted on 9 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
To start projects immediately, prioritize tasks, assemble the team, and establish clear goals and timelines.
Identify the project scope and objectives
Create a project plan with clear timelines and milestones
Assemble a team with the necessary skills and expertise
Assign tasks and responsibilities to team members
Establish communication channels and protocols
Monitor progress and adjust the plan as needed
The initial project requirements include defining project goals, scope, timeline, budget, and team roles.
Define project goals and objectives
Determine project scope and deliverables
Create a project timeline and schedule
Establish a project budget and resource allocation
Assign team roles and responsibilities
Calculate the weight of steel in a structure based on its dimensions and density
Determine the dimensions of the steel components (length, width, height)
Calculate the volume of each steel component using the formula: Volume = Length x Width x Height
Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight
Sum up the weights of all steel components to get the total
Total Float is the amount of time a schedule activity can be delayed without delaying the project completion date.
Total Float is calculated by subtracting the Early Start date of an activity from its Late Start date.
It indicates the flexibility in scheduling a particular activity.
Activities with zero Total Float are considered critical path activities.
Total Float helps project managers in managing project schedules eff
Rate analysis of shuttering involves calculating the cost of materials, labor, and equipment for formwork used in construction projects.
Rate analysis of shuttering includes determining the quantity of materials needed for formwork, such as plywood, steel props, and scaffolding.
Labor costs for assembling and dismantling the formwork are also considered in the rate analysis.
Equipment costs, such as rental of concrete mix...
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
based on 4 reviews
Rating in categories
Senior Engineer
47
salaries
| ₹4.5 L/yr - ₹9.5 L/yr |
Assistant Manager
23
salaries
| ₹7 L/yr - ₹12.5 L/yr |
Production Engineer
14
salaries
| ₹3 L/yr - ₹4.6 L/yr |
Civil Engineer
14
salaries
| ₹3.5 L/yr - ₹7 L/yr |
Deputy Manager
14
salaries
| ₹10 L/yr - ₹16.5 L/yr |
Realty Assistant
Kunal Structure
Omkar Realtors and Developers Group
DRA Homes