M3M India Senior Project Engineer Civil Interview Questions and Answers for Freshers

Updated 13 Aug 2024

M3M India Senior Project Engineer Civil Interview Experiences for Freshers

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023.Ā There were 2 interview rounds.

Round 1 - TechnicalĀ 

(2 Questions)

  • Q1. About ply is code?
  • Q2. About is 456 ?
Round 2 - HRĀ 

(2 Questions)

  • Q1. Why do u joining us
  • Ans. 

    I am excited to join your team because of your reputation for innovative projects and commitment to excellence.

    • I am impressed by the cutting-edge projects your company has completed in the past.

    • I believe in your company's commitment to excellence and quality in civil engineering.

    • I am excited about the opportunity to work with a team of experienced professionals in the field.

    • Your company's values align with my own profe

  • Answered by AI
  • Q2. What was last salary
  • Ans. 

    I prefer not to disclose my previous salary as it is confidential information.

    • It is not appropriate to discuss previous salary in an interview setting

    • Focus on discussing qualifications, experience, and fit for the current role

    • Salary negotiations should be based on the value you bring to the new position

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Na

Interview questions from similar companies

Interview QuestionnaireĀ 

2 Questions

  • Q1. What projects i had done in Bachelors?
  • Ans. 

    I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.

    • Designed a new bridge using CAD software

    • Researched and implemented renewable energy sources on campus

    • Collaborated with classmates on a group project to improve campus sustainability

  • Answered by AI
  • Q2. Where i did my 6 months internship?
  • Ans. 

    I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.

    • Internship at ABC Engineering Firm

    • Focused on project management and design

    • Hands-on experience gained

  • Answered by AI

Interview Preparation Tips

Round: Technical Interview
Experience: I was fresher, so they usually ask me about my university projects and my final training.
Tips: It will be good if you relate your projects with the company profile.

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in May 2023.Ā There were 3 interview rounds.

Round 1 - Resume ShortlistĀ 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - TechnicalĀ 

(2 Questions)

  • Q1. Diffirence between project and project engineering
  • Ans. 

    Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.

    • Project is the overall task or objective to be completed within a specific timeframe.

    • Project engineering focuses on the technical aspects such as planning, designing, and executing the project.

    • Project management involves coordinating resources and tas...

  • Answered by AI
  • Q2. Types of services in interior fitout
  • Ans. 

    Types of services in interior fitout include design, construction, project management, and installation.

    • Design services involve creating layouts, selecting materials, and creating 3D visualizations.

    • Construction services include building partitions, ceilings, and flooring.

    • Project management services involve coordinating schedules, budgets, and contractors.

    • Installation services include fitting furniture, fixtures, and eq...

  • Answered by AI
Round 3 - One-on-oneĀ 

(2 Questions)

  • Q1. Problems faced in site
  • Ans. 

    Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.

    • Delays in material delivery can impact project timelines and budgets

    • Inclement weather can halt work progress and cause safety concerns

    • Coordination issues between different teams can lead to misunderstandings and errors

  • Answered by AI
  • Q2. Difference between agreement and bond
  • Ans. 

    Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.

    • Agreement is a mutual understanding between two or more parties.

    • A bond is a legal document that guarantees the fulfillment of obligations.

    • Agreements are usually informal and may not always be legally binding.

    • Bonds are formal and legally enforceable documents.

    • Examples of agreements include contra...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2023.Ā There was 1 interview round.

Round 1 - TechnicalĀ 

(5 Questions)

  • Q1. Chiller efficiency
  • Ans. 

    Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.

    • Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.

    • Regular maintenance and cleaning of chiller components can improve efficiency.

    • Upgrading to a more energy-efficient chiller model can also increase efficiency.

    • Proper ...

  • Answered by AI
  • Q2. Which one more efficiently? Air cooled,or water cooled???
  • Ans. 

    Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.

    • Water has higher heat transfer capabilities compared to air

    • Water cooled systems can maintain more consistent temperatures

    • Water cooled systems are typically used in high performance applications such as data centers and industrial machinery

  • Answered by AI
  • Q3. How we improved duct velocity?
  • Ans. 

    Duct velocity can be improved by increasing the fan speed or reducing the duct size.

    • Increase the fan speed to increase the air velocity in the duct.

    • Reduce the duct size to increase the air velocity.

    • Use dampers or adjustable louvers to control and optimize the airflow.

    • Ensure proper sealing of duct joints to minimize air leakage.

    • Consider using smooth and straight ducts to reduce friction and improve airflow.

    • Regularly cle...

  • Answered by AI
  • Q4. What types of gas use chiller system?
  • Ans. 

    The chiller system uses various types of gases for cooling purposes.

    • Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.

    • R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.

    • R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.

    • Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.

    • Other ...

  • Answered by AI
  • Q5. How we decided the vrf system capacity as per area??
  • Ans. 

    The VRF system capacity is determined based on the area's cooling and heating load requirements.

    • Calculate the total cooling load and heating load for the area

    • Consider factors such as insulation, windows, occupancy, and equipment

    • Select VRF system capacity based on the calculated load requirements

    • Consult with HVAC professionals for accurate sizing

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical round is more important than other rounds so we should prepare that things very easily putting during interview and most important things candidates CV,whatever he mension his cv technically should be know very well' šŸ™
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2023.Ā There were 2 interview rounds.

Round 1 - Resume ShortlistĀ 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - TechnicalĀ 

(3 Questions)

  • Q1. Rate Analysis , Reconciliation of materials
  • Q2. Coefficient of cement
  • Ans. 

    The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.

    • The coefficient of cement is also known as the coefficient of thermal expansion.

    • It is an important factor to consider in construction projects to prevent cracking or damage to structures.

    • The coefficient of cement varies depending on the type and composition of the cement.

    • For example, Portland cement typ...

  • Answered by AI
  • Q3. Escalation of materials
  • Ans. 

    Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.

    • Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.

    • Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.

    • Escalation can impact project ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company , well balanced life, flexible time
Job security

I applied via Company Website and was interviewed in May 2021.Ā There was 1 interview round.

Interview QuestionnaireĀ 

2 Questions

  • Q1. Type of work I am doing in previous company
  • Q2. All construction activities I handeld

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company & Good Culture
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024.

Round 1 - HRĀ 

(1 Question)

  • Q1. Tell me about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - Best company and our TL is very supportive and specially thanks to our L&D team
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HRĀ 

(2 Questions)

  • Q1. About past experience
  • Q2. About real estate
Round 2 - Vice PresidentĀ 

(2 Questions)

  • Q1. About Real Estate
  • Q2. About background

Interview Preparation Tips

Interview preparation tips for other job seekers - Excellent environment and its very good growing company.
All the family are supportive and motivated
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume ShortlistĀ 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-oneĀ 

(4 Questions)

  • Q1. What is a BOQ?
  • Ans. 

    A BOQ stands for Bill of Quantities, which is a document used in construction projects to list the materials, parts, and labor needed for a project.

    • A BOQ is typically prepared by a quantity surveyor or estimator.

    • It includes detailed information on quantities, unit rates, and total costs for each item in the project.

    • BOQs are used to help contractors and clients understand the scope of work and costs involved in a projec...

  • Answered by AI
  • Q2. What are your strength?
  • Q3. What is a contract?
  • Ans. 

    A contract is a legally binding agreement between two or more parties that outlines the terms and conditions of their relationship.

    • A contract must involve an offer, acceptance, consideration, and intention to create legal relations.

    • Contracts can be written or oral, but written contracts are generally more enforceable.

    • Examples of contracts include employment agreements, rental agreements, and sales contracts.

  • Answered by AI
  • Q4. Do you know about fidic?
  • Ans. 

    FIDIC stands for International Federation of Consulting Engineers, which publishes standard contracts for the construction industry.

    • FIDIC is an acronym for International Federation of Consulting Engineers.

    • FIDIC publishes standard contracts for the construction industry.

    • FIDIC contracts are commonly used in international construction projects.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be honest and answer confidentally

I applied via Campus Placement

Round 1 - Resume ShortlistĀ 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude TestĀ 

They will conduct English talent test

Interview Preparation Tips

Interview preparation tips for other job seekers - Better to work as a fresher to grow the communication skills

M3M India Interview FAQs

How many rounds are there in M3M India Senior Project Engineer Civil interview for freshers?
M3M India interview process for freshers usually has 2 rounds. The most common rounds in the M3M India interview process for freshers are Technical and HR.
What are the top questions asked in M3M India Senior Project Engineer Civil interview for freshers?

Some of the top questions asked at the M3M India Senior Project Engineer Civil interview for freshers -

  1. Cement quantity in Design mix of M35 grade concr...read more
  2. About ply is co...read more
  3. About is 45...read more

Tell us how to improve this page.

M3M India Senior Project Engineer Civil Interview Process for Freshers

based on 1 interview

Interview experience

5
Ā Ā 
Excellent
View more

Interview Questions from Similar Companies

InvestoXpert Interview Questions
4.2
Ā ā€¢Ā 63 Interviews
Knight Frank Interview Questions
4.0
Ā ā€¢Ā 44 Interviews
Smartworks Interview Questions
3.6
Ā ā€¢Ā 32 Interviews
RDC Concrete (India) Interview Questions
4.0
Ā ā€¢Ā 31 Interviews
Aliens Group Interview Questions
3.2
Ā ā€¢Ā 30 Interviews
Nyati Group Interview Questions
4.2
Ā ā€¢Ā 29 Interviews
Berkadia Interview Questions
3.9
Ā ā€¢Ā 28 Interviews
SMEC Interview Questions
3.7
Ā ā€¢Ā 27 Interviews
Xanadu Interview Questions
3.5
Ā ā€¢Ā 26 Interviews
Hanu Reddy Realty Interview Questions
4.8
Ā ā€¢Ā 23 Interviews
View all
M3M India Senior Project Engineer Civil Salary
based on 4 salaries
ā‚¹5.2 L/yr - ā‚¹10 L/yr
At par with the average Senior Project Engineer Civil Salary in India
View more details

M3M India Senior Project Engineer Civil Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

5.0

Skill development

4.6

Work-life balance

5.0

Salary

4.7

Job security

4.8

Company culture

5.0

Promotions

4.8

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
166 salaries
unlock blur

ā‚¹4.2 L/yr - ā‚¹12.2 L/yr

Deputy Manager
94 salaries
unlock blur

ā‚¹5 L/yr - ā‚¹14 L/yr

Manager
87 salaries
unlock blur

ā‚¹5.6 L/yr - ā‚¹21.2 L/yr

Senior Manager
77 salaries
unlock blur

ā‚¹6.5 L/yr - ā‚¹24 L/yr

Senior Executive
60 salaries
unlock blur

ā‚¹3.5 L/yr - ā‚¹9 L/yr

Explore more salaries
Compare M3M India with

Knight Frank

4.0
Compare

R.S. Infraprojects

3.9
Compare

SMEC

3.7
Compare

BPTP

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview