i
M3M India
Filter interviews by
I applied via Referral and was interviewed in Nov 2023.Ā There was 1 interview round.
Cement quantity in Design mix of M35 grade concrete is typically around 380-415 kg/m3.
Cement quantity in M35 grade concrete is usually between 380-415 kg/m3.
The exact quantity may vary based on specific project requirements and conditions.
It is important to follow the design mix specifications provided by structural engineers.
Top trending discussions
I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.
Designed a new bridge using CAD software
Researched and implemented renewable energy sources on campus
Collaborated with classmates on a group project to improve campus sustainability
I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.
Internship at ABC Engineering Firm
Focused on project management and design
Hands-on experience gained
I applied via Company Website and was interviewed before Jan 2023.Ā There was 1 interview round.
Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.
Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.
Regular maintenance and cleaning of chiller components can improve efficiency.
Upgrading to a more energy-efficient chiller model can also increase efficiency.
Proper ...
Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.
Water has higher heat transfer capabilities compared to air
Water cooled systems can maintain more consistent temperatures
Water cooled systems are typically used in high performance applications such as data centers and industrial machinery
Duct velocity can be improved by increasing the fan speed or reducing the duct size.
Increase the fan speed to increase the air velocity in the duct.
Reduce the duct size to increase the air velocity.
Use dampers or adjustable louvers to control and optimize the airflow.
Ensure proper sealing of duct joints to minimize air leakage.
Consider using smooth and straight ducts to reduce friction and improve airflow.
Regularly cle...
The chiller system uses various types of gases for cooling purposes.
Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.
R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.
R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.
Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.
Other ...
The VRF system capacity is determined based on the area's cooling and heating load requirements.
Calculate the total cooling load and heating load for the area
Consider factors such as insulation, windows, occupancy, and equipment
Select VRF system capacity based on the calculated load requirements
Consult with HVAC professionals for accurate sizing
I applied via Naukri.com and was interviewed in May 2023.Ā There were 3 interview rounds.
Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.
Project is the overall task or objective to be completed within a specific timeframe.
Project engineering focuses on the technical aspects such as planning, designing, and executing the project.
Project management involves coordinating resources and tas...
Types of services in interior fitout include design, construction, project management, and installation.
Design services involve creating layouts, selecting materials, and creating 3D visualizations.
Construction services include building partitions, ceilings, and flooring.
Project management services involve coordinating schedules, budgets, and contractors.
Installation services include fitting furniture, fixtures, and eq...
Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.
Delays in material delivery can impact project timelines and budgets
Inclement weather can halt work progress and cause safety concerns
Coordination issues between different teams can lead to misunderstandings and errors
Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.
Agreement is a mutual understanding between two or more parties.
A bond is a legal document that guarantees the fulfillment of obligations.
Agreements are usually informal and may not always be legally binding.
Bonds are formal and legally enforceable documents.
Examples of agreements include contra...
I applied via Company Website and was interviewed in Feb 2023.Ā There were 2 interview rounds.
The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.
The coefficient of cement is also known as the coefficient of thermal expansion.
It is an important factor to consider in construction projects to prevent cracking or damage to structures.
The coefficient of cement varies depending on the type and composition of the cement.
For example, Portland cement typ...
Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.
Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.
Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.
Escalation can impact project ...
I applied via Company Website and was interviewed in May 2021.Ā There was 1 interview round.
A BOQ stands for Bill of Quantities, which is a document used in construction projects to list the materials, parts, and labor needed for a project.
A BOQ is typically prepared by a quantity surveyor or estimator.
It includes detailed information on quantities, unit rates, and total costs for each item in the project.
BOQs are used to help contractors and clients understand the scope of work and costs involved in a projec...
A contract is a legally binding agreement between two or more parties that outlines the terms and conditions of their relationship.
A contract must involve an offer, acceptance, consideration, and intention to create legal relations.
Contracts can be written or oral, but written contracts are generally more enforceable.
Examples of contracts include employment agreements, rental agreements, and sales contracts.
FIDIC stands for International Federation of Consulting Engineers, which publishes standard contracts for the construction industry.
FIDIC is an acronym for International Federation of Consulting Engineers.
FIDIC publishes standard contracts for the construction industry.
FIDIC contracts are commonly used in international construction projects.
I applied via Campus Placement
They will conduct English talent test
I applied via Referral and was interviewed in Dec 2024.Ā There were 2 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
166
salaries
| ā¹4.2 L/yr - ā¹12.2 L/yr |
Deputy Manager
94
salaries
| ā¹5 L/yr - ā¹14 L/yr |
Manager
87
salaries
| ā¹5.6 L/yr - ā¹21.2 L/yr |
Senior Manager
77
salaries
| ā¹6.5 L/yr - ā¹24 L/yr |
Senior Executive
60
salaries
| ā¹3.5 L/yr - ā¹9 L/yr |
Knight Frank
R.S. Infraprojects
SMEC
BPTP