Larsen & Toubro Limited Senior Plumbing Engineer Interview Questions and Answers

Updated 16 Sep 2023

Larsen & Toubro Limited Senior Plumbing Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. My field experience tell me also Sir
  • Q2. Work are good drawing wwtch me work start alsoi if any problem Senior person tell me also after go to Cilent sólved me also
  • Q3. First time work do complete me
  • Q4. Safety ismainno acdifent also

Interview Preparation Tips

Interview preparation tips for other job seekers - Safety First after next worki on good results reach me also any work First safety after work also

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(6 Questions)

  • Q1. Why use Steel in Construction works.
  • Ans. 

    Steel is used in construction works due to its strength, durability, versatility, and cost-effectiveness.

    • Steel is known for its high tensile strength, making it ideal for supporting heavy loads in buildings and bridges.

    • Steel is durable and resistant to corrosion, ensuring the longevity of structures.

    • Steel can be easily fabricated into different shapes and sizes, allowing for versatile design options.

    • Steel is cost-effec...

  • Answered by AI
  • Q2. Why Provided Concrete Cover in all Structures Members.
  • Ans. 

    Concrete cover is provided in all structural members to protect the reinforcement bars from corrosion and fire damage.

    • Concrete cover protects the reinforcement bars from corrosion caused by exposure to moisture and chemicals in the environment.

    • It also provides protection against fire damage by acting as a barrier between the reinforcement and the fire.

    • Proper concrete cover helps in maintaining the durability and streng...

  • Answered by AI
  • Q3. How to do Calculate Staircase Steel.
  • Ans. 

    Calculate the amount of steel required for a staircase based on design and dimensions.

    • Calculate the total length of all the steel bars needed for the staircase

    • Determine the diameter and spacing of the steel bars based on design requirements

    • Consider the number of steps and the dimensions of the staircase in the calculation

    • Account for any additional reinforcement needed for structural integrity

    • Consult structural drawings

  • Answered by AI
  • Q4. How do I Find Concrete Workability.
  • Ans. 

    Concrete workability can be determined by conducting a slump test.

    • Conduct a slump test to measure the consistency of the concrete mix.

    • Adjust the water content or use admixtures to achieve the desired workability.

    • Consider factors such as temperature, humidity, and type of aggregates in determining workability.

    • Consult with concrete mix design experts for guidance on achieving the desired workability.

    • Use tools like flow t...

  • Answered by AI
  • Q5. What is Slum test for Concrete.
  • Ans. 

    Slump test is a method to measure the consistency of concrete before it sets.

    • Slump test involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

    • The amount of slump indicates the workability of the concrete - higher slump means more workable concrete.

    • The test helps ensure the concrete is of the right consistency for proper placement and compaction.

    • Slump tes...

  • Answered by AI
  • Q6. What is Concrete Mix Design.
  • Ans. 

    Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Involves selecting the right combination of materials like cement, aggregates, water, and admixtures

    • Proportions are determined based on desired strength, workability, durability, and other properties

    • Testing and adjusting the mix design to meet project requirements

    • Example: A ...

  • Answered by AI

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Structural site questions
  • Q2. Fhinishing questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer for villa stectur work from Shalimar one world
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What is your salary.
  • Q2. Doing all over project.
  • Q3. Notice period of your current company
Round 3 - Technical 

(4 Questions)

  • Q1. Cement consumption of M20 ratio
  • Ans. 

    Cement consumption of M20 concrete mix ratio is 360 kg/m3.

    • M20 concrete mix ratio is 1:1.5:3 (1 part cement, 1.5 parts sand, 3 parts aggregate)

    • Cement consumption for 1 m3 of M20 concrete is 360 kg

    • To calculate total cement consumption, multiply 360 kg by the volume of concrete needed

  • Answered by AI
  • Q2. Extra item add in billing.
  • Ans. 

    Extra items added in billing should be justified with proper documentation and approval.

    • Ensure that the extra item was actually used on the project

    • Check if the extra item was approved by the client or project manager

    • Document the reason for adding the extra item in the billing

    • Provide evidence such as photos or receipts to support the inclusion of the extra item

  • Answered by AI
  • Q3. Rate analysis of various item
  • Ans. 

    Rate analysis involves calculating the cost of various items in a construction project.

    • Rate analysis helps in determining the cost of materials, labor, and equipment for each item in a project.

    • It involves breaking down the total cost into components like material cost, labor cost, machinery cost, and overheads.

    • Rate analysis is essential for accurate budgeting and cost estimation in construction projects.

    • For example, in...

  • Answered by AI
  • Q4. Price ecclaration
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Exam will be conduct for aptitude test

Round 3 - Technical 

(3 Questions)

  • Q1. Any asked questions my Bulding mteriyal i will attemt given answer your questions
  • Q2. Bulding material any questions
  • Q3. Can u any questions my releted tred

Interview Preparation Tips

Topics to prepare for GMR Group Site Engineer interview:
  • Bulding meterial
Interview preparation tips for other job seekers - A standardized test is a test that is administered and scored in a consistent, or "standard", manner
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. All ques related to your work in current company
  • Q2. About Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Give interview with confidence and be aware for salary negotiation
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Cube test of concrete
  • Ans. 

    Cube test is a method to determine the compressive strength of concrete.

    • Concrete cubes are casted and cured for 28 days before testing.

    • The cubes are then placed in a compression testing machine.

    • The maximum load that the cube can bear before failure is recorded.

    • The compressive strength of the concrete is calculated using the formula: compressive strength = maximum load/area of cube face.

    • The cube test is an important qua

  • Answered by AI
  • Q2. Meaning of ESR CWR and steel IS code
  • Ans. 

    ESR stands for Earth System Research, CWR stands for Crop Water Requirement, and steel IS code refers to Indian Standard code for steel.

    • ESR is a research program that studies the Earth's climate system and its changes over time.

    • CWR is the amount of water needed by crops to grow and produce a good yield.

    • Steel IS code refers to the Indian Standard code for steel, which provides guidelines for the production and use of st

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Concrete test and bbs must know for site job and safety advice for labor also
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Assignment 

Plumbing supervisor

Round 3 - Technical 

(3 Questions)

  • Q1. Good afternoon sir
  • Q2. My name is ravindher
  • Q3. My designation plumbing supervisor

I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 2 - Aptitude Test 

Good

Interview Preparation Tips

Topics to prepare for Tata Projects Site Engineer interview:
  • AutoCAD
  • Site Engineering
Interview preparation tips for other job seekers - Good job for any candidate, nice timing, safety

Larsen & Toubro Limited Interview FAQs

How many rounds are there in Larsen & Toubro Limited Senior Plumbing Engineer interview?
Larsen & Toubro Limited interview process usually has 2 rounds. The most common rounds in the Larsen & Toubro Limited interview process are Resume Shortlist and Technical.
What are the top questions asked in Larsen & Toubro Limited Senior Plumbing Engineer interview?

Some of the top questions asked at the Larsen & Toubro Limited Senior Plumbing Engineer interview -

  1. Work are good drawing wwtch me work start alsoi if any problem Senior person...read more
  2. My field experience tell me also ...read more
  3. Safety ismainno acdifent a...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.3k Interviews
Tata Projects Interview Questions
4.3
 • 405 Interviews
Tata Group Interview Questions
4.2
 • 357 Interviews
Tata Technologies Interview Questions
3.6
 • 251 Interviews
TCE Interview Questions
3.8
 • 242 Interviews
View all
Assistant Manager
3.8k salaries
unlock blur

₹6.2 L/yr - ₹20.2 L/yr

Senior Engineer
3.4k salaries
unlock blur

₹4.5 L/yr - ₹12.5 L/yr

Assistant Construction Manager
1.2k salaries
unlock blur

₹6 L/yr - ₹16.5 L/yr

Engineer
1.2k salaries
unlock blur

₹1.6 L/yr - ₹9.3 L/yr

Manager
1.1k salaries
unlock blur

₹9.5 L/yr - ₹30 L/yr

Explore more salaries
Compare Larsen & Toubro Limited with

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Adani Group

3.9
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview