The purpose of the project is to achieve a specific goal within a defined timeframe and budget while following a structured process.
The purpose of the project is to achieve a specific goal within a defined timeframe and budget
The process of the project involves planning, executing, monitoring, and controlling
My role during the project is to ensure that the project is executed as per plan and within the budget
Questions ...
posted on 25 Dec 2023
I applied via Naukri.com and was interviewed in Nov 2023. There were 3 interview rounds.
posted on 13 Dec 2022
Moving one shuttering refers to the process of shifting the entire formwork system from one location to another, while conventional shuttering involves building the formwork on-site.
Moving one shuttering is faster and more efficient as the entire formwork system can be transported to the next location without having to dismantle and rebuild it.
Conventional shuttering requires the formwork to be built on-site, which can...
FE500 steel is a type of high-strength reinforcement steel used in construction.
FE500 steel has a minimum yield strength of 500 N/mm²
It is commonly used in reinforced concrete structures such as buildings, bridges, and highways
FE500 steel is corrosion-resistant and has good ductility
It is also known as TMT (Thermo-Mechanically Treated) steel
posted on 21 Feb 2022
I applied via Naukri.com and was interviewed in Jan 2022. There were 4 interview rounds.
posted on 24 Jan 2022
I applied via Walk-in and was interviewed in Jul 2021. There were 4 interview rounds.
The question is not relevant to the job role of Site Execution Engineer.
The production of 1 pair of carpenter is not a relevant metric for a Site Execution Engineer.
The job role of a Site Execution Engineer involves overseeing and managing construction projects.
The engineer is responsible for ensuring that the project is completed on time, within budget, and to the required quality standards.
The engineer works closely ...
The thickness of vdf concrete varies depending on the application and design requirements.
VDF stands for Vacuum Dewatered Flooring
The thickness can range from 50mm to 150mm
The thickness is determined by factors such as load-bearing capacity, durability, and aesthetics
The concrete is compacted using a vacuum pump to remove excess water and increase strength
based on 3 reviews
Rating in categories
Assistant Manager
3.8k
salaries
| ₹6 L/yr - ₹20 L/yr |
Senior Engineer
3.4k
salaries
| ₹4.5 L/yr - ₹15.1 L/yr |
Engineer
1.3k
salaries
| ₹1.6 L/yr - ₹9.1 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹5 L/yr - ₹17 L/yr |
Manager
1.1k
salaries
| ₹9 L/yr - ₹28 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra