i
Tata Projects
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2022. There were 4 interview rounds.
Top trending discussions
posted on 23 Jun 2022
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
posted on 9 Nov 2024
I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.
RCC road construction involves using reinforced concrete for durability and strength.
RCC stands for Reinforced Cement Concrete
Specifications include using high-quality cement, aggregates, and steel reinforcement
Proper compaction and curing are essential for durability
Thickness of the RCC road depends on traffic load and subgrade conditions
Joint spacing should be as per design specifications
Building construction activities include excavation, foundation work, framing, roofing, electrical work, plumbing, and finishing.
Excavation: Digging the foundation and preparing the site
Foundation work: Pouring concrete and setting the foundation
Framing: Building the structure's skeleton with wood or steel beams
Roofing: Installing the roof materials
Electrical work: Wiring the building for electricity
Plumbing: Installin...
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
posted on 4 Aug 2024
Road construction involves several steps including planning, designing, clearing the land, laying the foundation, paving, and adding finishing touches.
Planning: Determine the route, traffic flow, and necessary permits.
Designing: Create detailed plans including width, materials, and drainage systems.
Clearing the land: Remove trees, rocks, and other obstacles.
Laying the foundation: Level the ground, add layers of gravel ...
Sub grade to wearing course technical specifications include material type, thickness, compaction requirements, and drainage considerations.
Material type for sub grade can be natural soil, stabilized soil, or aggregate base.
Thickness of sub grade is typically specified based on soil conditions and traffic loads.
Compaction requirements ensure proper density and strength of the sub grade.
Wearing course materials can incl...
posted on 8 Jan 2025
I applied via Company Website and was interviewed in Jul 2024. There were 2 interview rounds.
I applied via Job Portal
Modelling water supply
I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.
posted on 10 Oct 2023
I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 22 Apr 2023
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 3 interview rounds.
based on 1 review
Rating in categories
Deputy Manager
1.1k
salaries
| ₹5.7 L/yr - ₹17 L/yr |
Assistant Manager
706
salaries
| ₹5 L/yr - ₹14.8 L/yr |
Manager
387
salaries
| ₹8 L/yr - ₹24.1 L/yr |
Senior Engineer
373
salaries
| ₹3.5 L/yr - ₹13 L/yr |
Senior Manager
347
salaries
| ₹12 L/yr - ₹32.5 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company