Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. About your professional background
  • Q2. IS codes & project legal requirements
  • Ans. 

    Knowledge of relevant IS codes and project legal requirements is essential for ensuring compliance and safety.

    • Familiarity with IS codes related to construction, electrical, fire safety, etc.

    • Understanding of local and national legal requirements for HSE in projects

    • Ability to interpret and apply relevant codes and regulations in project planning and execution

    • Regular updates on changes in codes and regulations to ensure c...

  • Answered by AI
  • Q3. Plant & Machinery Checklist details
  • Q4. Risk assesment & SOP of various activities excavation, lifting, confined space etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and give answers.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Motor type, Pump lowering, ESR piping etc.
  • Q2. Solar Specification
Round 2 - HR 

(2 Questions)

  • Q1. Notice period is negotiable
  • Q2. 30%hike on current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep calm, to be honest if you know about whats they ask explain them if not then leave and say sorry.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at PSG College of Technology, Coimbatore and was interviewed in Sep 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

General knowlegde, Basic Aptitude, Domain Technical MCQ

Round 2 - Group Discussion 

Genx vs Genz, Altitude and comparsion

Round 3 - One-on-one 

(2 Questions)

  • Q1. Components of Transformer
  • Ans. 

    Components of a transformer include core, windings, and insulation.

    • Core: Provides a path for magnetic flux

    • Windings: Primary and secondary coils for inducing voltage

    • Insulation: Prevents short circuits and ensures safety

  • Answered by AI
  • Q2. Question based on series and parallel resistance
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is full name of RPM.
  • Ans. 

    RPM stands for Revolutions Per Minute.

    • RPM stands for Revolutions Per Minute

    • It is a unit of rotational speed

    • Commonly used in the context of engines, motors, and other rotating machinery

  • Answered by AI
  • Q2. How many type of Motor.
  • Ans. 

    There are various types of motors including DC motors, AC motors, stepper motors, and servo motors.

    • DC motors: used in applications where speed control is important, such as in electric vehicles.

    • AC motors: commonly used in household appliances and industrial machinery.

    • Stepper motors: used in applications requiring precise position control, like 3D printers.

    • Servo motors: used in robotics and automation for accurate contr

  • Answered by AI
Round 2 - Electrical 

(2 Questions)

  • Q1. What is Earthing.
  • Ans. 

    Earthing is the process of connecting electrical systems to the ground to prevent electric shock and protect equipment.

    • Earthing provides a path for fault currents to flow safely into the ground.

    • It helps in stabilizing voltage levels and protecting against lightning strikes.

    • Earthing is essential for safety in electrical systems to prevent electric shocks.

    • Examples of earthing systems include grounding rods, grounding pla

  • Answered by AI
  • Q2. Type of Insulator
  • Ans. 

    Insulators are materials that do not conduct electricity and are used to prevent the flow of current.

    • Insulators are materials with high resistivity, such as rubber, glass, porcelain, and plastic.

    • They are used to separate conductors in electrical systems to prevent short circuits.

    • Insulators are crucial for safety in electrical installations to avoid electric shocks and fires.

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me how road was construted
  • Ans. 

    Road construction involves several steps including planning, designing, clearing the land, laying the foundation, paving, and adding finishing touches.

    • Planning: Determine the route, traffic flow, and necessary permits.

    • Designing: Create detailed plans including width, materials, and drainage systems.

    • Clearing the land: Remove trees, rocks, and other obstacles.

    • Laying the foundation: Level the ground, add layers of gravel ...

  • Answered by AI
  • Q2. Tell me all technical specification about Sub grade to Wearing course.
  • Ans. 

    Sub grade to wearing course technical specifications include material type, thickness, compaction requirements, and drainage considerations.

    • Material type for sub grade can be natural soil, stabilized soil, or aggregate base.

    • Thickness of sub grade is typically specified based on soil conditions and traffic loads.

    • Compaction requirements ensure proper density and strength of the sub grade.

    • Wearing course materials can incl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Job interview was not very hard.Actually they want candidates... Because everyone knows about their salary delay of 5-6 months.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Brief in QMS why it is adopted
  • Ans. 

    QMS is adopted to ensure consistent quality, meet customer requirements, and improve processes.

    • Ensures consistent quality of products or services

    • Helps meet customer requirements and expectations

    • Improves processes and efficiency

    • Reduces risks and errors

    • Enhances customer satisfaction

    • Provides a framework for continuous improvement

  • Answered by AI
  • Q2. Design mix procedure
  • Ans. 

    Design mix procedure involves determining the proportions of materials to create a concrete mix with desired properties.

    • Identify the required strength and durability of the concrete

    • Select suitable materials such as cement, aggregates, and water

    • Calculate the proportions of each material based on mix design methods

    • Test the mix to ensure it meets specifications

    • Adjust the mix if necessary to achieve desired properties

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Jan 2025.

Round 1 - HR 

(2 Questions)

  • Q1. All quality testing
  • Q2. Gradation
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Bitumen work related
  • Q2. Concrete and earth work
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Is code for CBR
  • Ans. 

    CBR stands for Code Based Routing, a method used in software development for routing messages based on code logic.

    • CBR is a technique used in software development to route messages based on code logic

    • It involves writing code to determine how messages should be routed

    • CBR is commonly used in systems where routing decisions are complex and need to be dynamic

  • Answered by AI
  • Q2. IS 2720 Part 8
  • Ans. 

    IS 2720 Part 8 is a standard for determining the water content of soil by oven drying method.

    • IS 2720 Part 8 is a standard method used in geotechnical engineering to determine the water content of soil samples.

    • The method involves weighing a soil sample, drying it in an oven, and then re-weighing to calculate the water content.

    • The water content is calculated as the difference in weight before and after drying, divided by...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Very Smooth proc7
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Explain hydration
  • Ans. 

    Hydration is the process of providing adequate fluids to the body to maintain proper function.

    • Hydration is essential for overall health and well-being

    • It helps regulate body temperature, transport nutrients, and remove waste

    • Drinking water, consuming fruits and vegetables, and electrolyte-rich beverages are ways to stay hydrated

  • Answered by AI

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Assistant Manager HSE interview?
L&T Construction interview process usually has 1 rounds. The most common rounds in the L&T Construction interview process are Technical.
What are the top questions asked in L&T Construction Assistant Manager HSE interview?

Some of the top questions asked at the L&T Construction Assistant Manager HSE interview -

  1. IS codes & project legal requireme...read more
  2. Risk assesment & SOP of various activities excavation, lifting, confined space...read more
  3. Plant & Machinery Checklist deta...read more

Tell us how to improve this page.

L&T Construction Assistant Manager HSE Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
AtkinsRealis Interview Questions
4.0
 • 85 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
View all
L&T Construction Assistant Manager HSE Salary
based on 8 salaries
₹10.1 L/yr - ₹13.5 L/yr
24% more than the average Assistant Manager HSE Salary in India
View more details

L&T Construction Assistant Manager HSE Reviews and Ratings

based on 4 reviews

4.5/5

Rating in categories

4.1

Skill development

3.6

Work-life balance

4.1

Salary

4.0

Job security

3.4

Company culture

3.0

Promotions

3.1

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
711 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
504 salaries
unlock blur

₹5.4 L/yr - ₹18 L/yr

Construction Management
332 salaries
unlock blur

₹8.2 L/yr - ₹35 L/yr

Assistant Engineering Manager
321 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview