I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - I am civil site engineer omkar contraction LLP wada palghar Maharashtra

Top L&T Construction Civil Site Engineer Interview Questions and Answers

Q1. Minimum used in which grade of concrete
View answer (11)

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

I applied via Job Fair

Interview Preparation Tips

Interview preparation tips for other job seekers - Question me until you get the reason to hire, me in your company.

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)

I applied via Referral and was interviewed in Mar 2022. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir
I am Abhishek Kumar shandilya QA/QC inspector

QA QC Mechanical Engineer Interview Questions asked at other Companies

Q1. What is residual Camber..?
View answer (2)

Supervisor Interview Questions & Answers

user image Anonymous

posted on 1 May 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed before May 2023. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be proactive and be conscious of your answers

Supervisor Interview Questions asked at other Companies

Q1. Self introduction? & what is mean by eCommerce ? How it can do
View answer (10)

L&T Construction interview questions for popular designations

 Graduate Engineer Trainee (Get)

 (49)

 Civil Site Engineer

 (33)

 Senior Engineer

 (28)

 Civil Engineer

 (25)

 Site Engineer

 (18)

 Assistant Manager

 (14)

 Electrical GET

 (11)

 Engineer Trainee

 (11)

I applied via Campus Placement and was interviewed in Mar 2022. There were 5 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - I have only one experience in interview in gd.

B Tech Civil Engineer Interview Questions asked at other Companies

Q1. What is the process of earthquake design of a multi storey building?
View answer (2)

Get interview-ready with Top L&T Construction Interview Questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be through with resume

Top L&T Construction Electrical GET Interview Questions and Answers

Q1. Explain method of Torque Variation of Squirrel Cage Motor.
View answer (1)

Electrical GET Interview Questions asked at other Companies

Q1. Can you explain Ohm's Law and how it relates to electrical circuits? What is the difference between AC (Alternating Current) and DC (Direct Current)? Describe the difference between analog and digital signals. Give an example of each. How w... read more
View answer (1)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Jun 2023.

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)

I applied via Referral and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

8 Questions

  • Q1. How did plan controlling project material?
  • Ans. 

    Project material was controlled by creating a detailed plan and monitoring inventory levels.

    • Developed a comprehensive project plan that included material requirements and timelines

    • Monitored inventory levels to ensure materials were ordered and received in a timely manner

    • Collaborated with suppliers to ensure timely delivery of materials

    • Implemented a system to track material usage and waste

    • Regularly reviewed and updated ...

  • Answered by AI
  • Q2. How did store the material and preservation?
  • Ans. 

    Materials are stored according to their specific requirements for preservation.

    • Materials are stored in appropriate containers or packaging to prevent damage or contamination.

    • Temperature and humidity levels are monitored and controlled as necessary.

    • Materials are labeled with information such as date received, expiration date, and storage requirements.

    • Regular inspections and inventory checks are conducted to ensure prope...

  • Answered by AI
  • Q3. As per vendor and Clint requirement material to stored. Every week preservation to be done store material s.
  • Q4. How did store E&I panels?
  • Ans. 

    E&I panels should be stored in a dry and clean area with proper labeling.

    • Store panels in a dry and clean area to prevent damage from moisture and dirt.

    • Label the panels clearly to ensure easy identification and retrieval.

    • Store panels vertically to prevent warping or bending.

    • Use protective covers to prevent scratches or other damage.

    • Regularly inspect the panels for any signs of damage or wear.

    • Follow manufacturer's instru

  • Answered by AI
  • Q5. How did you receit material and documentation?
  • Ans. 

    As a Material Controller, I received material and documentation through various methods.

    • Received material through purchase orders and delivery notes.

    • Received documentation through email, physical copies, or online portals.

    • Verified the accuracy of material and documentation against the purchase order or request.

    • Checked for any damages or discrepancies and reported them to the appropriate department.

    • Maintained a record o...

  • Answered by AI
  • Q6. How do you inspection the materials?
  • Ans. 

    Materials are inspected by following established procedures and using appropriate tools and equipment.

    • Inspect materials upon receipt to ensure they meet specifications

    • Use measuring tools such as calipers and micrometers to check dimensions

    • Perform visual inspections for defects or damage

    • Conduct tests to verify material properties

    • Document inspection results and report any issues to appropriate personnel

  • Answered by AI
  • Q7. What's is your safety plan?
  • Ans. 

    My safety plan includes regular safety audits, employee training, and strict adherence to safety protocols.

    • Regular safety audits to identify potential hazards and address them promptly

    • Employee training on safety procedures and protocols

    • Strict adherence to safety protocols to minimize the risk of accidents

    • Proper use of personal protective equipment (PPE)

    • Emergency response plan in place in case of accidents or incidents

    • C...

  • Answered by AI
  • Q8. What are the type of material your receive in project store.
  • Ans. 1.Piping(pipe,pipe fittings, flange, valves, gasket & Bolts exc.. 2. mechanical ( compressor, vessel, Heat exchange, coloum, pump, boiler, Heater and related accessories. 3. E&I ( cable tray, cable, tray support, transformers, capacitor bank, GIS, Electrical panels, light pole, light fixture, instruments panels, workstation, FA & F&G materials, console, cable gland analyser, transmitter, pressure gauge
  • Answered by siva subramaniyan

Interview Preparation Tips

Interview preparation tips for other job seekers - Please appointment matrial technical knowledge personal only in store. He knows about Material store and traceability. If missing the material he is the one reponsible identify the materials time issue material to site.

Top L&T Construction Material Controller Interview Questions and Answers

Q1. How did plan controlling project material?
View answer (8)

Material Controller Interview Questions asked at other Companies

Q1. How did plan controlling project material?
View answer (8)

I applied via Company Website and was interviewed in Sep 2022. There were 2 interview rounds.

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Engineer interview:
  • Health science
Interview preparation tips for other job seekers - Identify your transferable skills
Build your social media presence

Top L&T Construction Civil Engineer Interview Questions and Answers

Q1. What is the nominal concrete proportion for different grades?
View answer (3)

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)

I applied via Referral and was interviewed in Jan 2022. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare before interview with Past experience work carried out during your services with indivdual role.

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)

L&T Construction Interview FAQs

How many rounds are there in L&T Construction interview?
L&T Construction interview process usually has 2-3 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction interview?

Some of the top questions asked at the L&T Construction interview -

  1. What will be the cost of painting the wall behind ...read more
  2. What do you mean by M25 concre...read more
  3. What are the steps to be followed after receiving the plan of a constructi...read more
How long is the L&T Construction interview process?

The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

L&T Construction Interview Process

based on 851 interviews

Interview experience

4.2
  
Good
View more

L&T Construction Reviews and Ratings

based on 6k reviews

4.0/5

Rating in categories

4.0

Skill development

3.4

Work-life balance

3.8

Salary

4.0

Job security

3.7

Company culture

3.4

Promotions

3.6

Work satisfaction

Explore 6k Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
705 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹5.4 L/yr - ₹18 L/yr

Civil Site Engineer
410 salaries
unlock blur

₹1.6 L/yr - ₹9.1 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹5 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview