L&T Construction Material Controller Interview Questions, Process, and Tips

Updated 12 Oct 2021

L&T Construction Material Controller Interview Experiences

1 interview found

I applied via Referral and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

8 Questions

  • Q1. How did plan controlling project material?
  • Ans. 

    Project material was controlled by creating a detailed plan and monitoring inventory levels.

    • Developed a comprehensive project plan that included material requirements and timelines

    • Monitored inventory levels to ensure materials were ordered and received in a timely manner

    • Collaborated with suppliers to ensure timely delivery of materials

    • Implemented a system to track material usage and waste

    • Regularly reviewed and updated ...

  • Answered by AI
  • Q2. How did store the material and preservation?
  • Ans. 

    Materials are stored according to their specific requirements for preservation.

    • Materials are stored in appropriate containers or packaging to prevent damage or contamination.

    • Temperature and humidity levels are monitored and controlled as necessary.

    • Materials are labeled with information such as date received, expiration date, and storage requirements.

    • Regular inspections and inventory checks are conducted to ensure prope...

  • Answered by AI
  • Q3. As per vendor and Clint requirement material to stored. Every week preservation to be done store material s.
  • Q4. How did store E&I panels?
  • Ans. 

    E&I panels should be stored in a dry and clean area with proper labeling.

    • Store panels in a dry and clean area to prevent damage from moisture and dirt.

    • Label the panels clearly to ensure easy identification and retrieval.

    • Store panels vertically to prevent warping or bending.

    • Use protective covers to prevent scratches or other damage.

    • Regularly inspect the panels for any signs of damage or wear.

    • Follow manufacturer's instru

  • Answered by AI
  • Q5. How did you receit material and documentation?
  • Ans. 

    As a Material Controller, I received material and documentation through various methods.

    • Received material through purchase orders and delivery notes.

    • Received documentation through email, physical copies, or online portals.

    • Verified the accuracy of material and documentation against the purchase order or request.

    • Checked for any damages or discrepancies and reported them to the appropriate department.

    • Maintained a record o...

  • Answered by AI
  • Q6. How do you inspection the materials?
  • Ans. 

    Materials are inspected by following established procedures and using appropriate tools and equipment.

    • Inspect materials upon receipt to ensure they meet specifications

    • Use measuring tools such as calipers and micrometers to check dimensions

    • Perform visual inspections for defects or damage

    • Conduct tests to verify material properties

    • Document inspection results and report any issues to appropriate personnel

  • Answered by AI
  • Q7. What's is your safety plan?
  • Ans. 

    My safety plan includes regular safety audits, employee training, and strict adherence to safety protocols.

    • Regular safety audits to identify potential hazards and address them promptly

    • Employee training on safety procedures and protocols

    • Strict adherence to safety protocols to minimize the risk of accidents

    • Proper use of personal protective equipment (PPE)

    • Emergency response plan in place in case of accidents or incidents

    • C...

  • Answered by AI
  • Q8. What are the type of material your receive in project store.
  • Ans. 1.Piping(pipe,pipe fittings, flange, valves, gasket & Bolts exc.. 2. mechanical ( compressor, vessel, Heat exchange, coloum, pump, boiler, Heater and related accessories. 3. E&I ( cable tray, cable, tray support, transformers, capacitor bank, GIS, Electrical panels, light pole, light fixture, instruments panels, workstation, FA & F&G materials, console, cable gland analyser, transmitter, pressure gauge
  • Answered by siva subramaniyan

Interview Preparation Tips

Interview preparation tips for other job seekers - Please appointment matrial technical knowledge personal only in store. He knows about Material store and traceability. If missing the material he is the one reponsible identify the materials time issue material to site.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question about your current work and technical question of what they want in me
Round 2 - Technical 

(1 Question)

  • Q1. Case study like what action you take in this particular problem
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and document sharing

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

About construction field

Round 2 - One-on-one 

(2 Questions)

  • Q1. About construction
  • Q2. About structure

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good company
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Feb 2024. There were 4 interview rounds.

Round 1 - Group Discussion 

How to manage site structure to finishing work

Round 2 - Aptitude Test 

Technical/ mathematics

Round 3 - One-on-one 

(3 Questions)

  • Q1. About reinforcement
  • Q2. About tile testing
  • Q3. About material testing
Round 4 - HR 

(2 Questions)

  • Q1. Family background
  • Q2. Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't give wrong statements and provide all documents is original

L&T Construction Interview FAQs

What are the top questions asked in L&T Construction Material Controller interview?

Some of the top questions asked at the L&T Construction Material Controller interview -

  1. How did plan controlling project materi...read more
  2. How did store the material and preservati...read more
  3. How did you receit material and documentati...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 425 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
AtkinsRealis Interview Questions
4.0
 • 85 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all

L&T Construction Material Controller Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

5.0

Skill development

4.5

Work-life balance

3.5

Salary

4.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
703 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
504 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
393 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
323 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview