Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Material Controller Interview Questions, Process, and Tips

Updated 12 Oct 2021

L&T Construction Material Controller Interview Experiences

1 interview found

I applied via Referral and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

8 Questions

  • Q1. How did plan controlling project material?
  • Ans. 

    Project material was controlled by creating a detailed plan and monitoring inventory levels.

    • Developed a comprehensive project plan that included material requirements and timelines

    • Monitored inventory levels to ensure materials were ordered and received in a timely manner

    • Collaborated with suppliers to ensure timely delivery of materials

    • Implemented a system to track material usage and waste

    • Regularly reviewed and updated ...

  • Answered by AI
  • Q2. How did store the material and preservation?
  • Ans. 

    Materials are stored according to their specific requirements for preservation.

    • Materials are stored in appropriate containers or packaging to prevent damage or contamination.

    • Temperature and humidity levels are monitored and controlled as necessary.

    • Materials are labeled with information such as date received, expiration date, and storage requirements.

    • Regular inspections and inventory checks are conducted to ensure prope...

  • Answered by AI
  • Q3. As per vendor and Clint requirement material to stored. Every week preservation to be done store material s.
  • Q4. How did store E&I panels?
  • Ans. 

    E&I panels should be stored in a dry and clean area with proper labeling.

    • Store panels in a dry and clean area to prevent damage from moisture and dirt.

    • Label the panels clearly to ensure easy identification and retrieval.

    • Store panels vertically to prevent warping or bending.

    • Use protective covers to prevent scratches or other damage.

    • Regularly inspect the panels for any signs of damage or wear.

    • Follow manufacturer's instru

  • Answered by AI
  • Q5. How did you receit material and documentation?
  • Ans. 

    As a Material Controller, I received material and documentation through various methods.

    • Received material through purchase orders and delivery notes.

    • Received documentation through email, physical copies, or online portals.

    • Verified the accuracy of material and documentation against the purchase order or request.

    • Checked for any damages or discrepancies and reported them to the appropriate department.

    • Maintained a record o...

  • Answered by AI
  • Q6. How do you inspection the materials?
  • Ans. 

    Materials are inspected by following established procedures and using appropriate tools and equipment.

    • Inspect materials upon receipt to ensure they meet specifications

    • Use measuring tools such as calipers and micrometers to check dimensions

    • Perform visual inspections for defects or damage

    • Conduct tests to verify material properties

    • Document inspection results and report any issues to appropriate personnel

  • Answered by AI
  • Q7. What's is your safety plan?
  • Ans. 

    My safety plan includes regular safety audits, employee training, and strict adherence to safety protocols.

    • Regular safety audits to identify potential hazards and address them promptly

    • Employee training on safety procedures and protocols

    • Strict adherence to safety protocols to minimize the risk of accidents

    • Proper use of personal protective equipment (PPE)

    • Emergency response plan in place in case of accidents or incidents

    • C...

  • Answered by AI
  • Q8. What are the type of material your receive in project store.
  • Ans. 1.Piping(pipe,pipe fittings, flange, valves, gasket & Bolts exc.. 2. mechanical ( compressor, vessel, Heat exchange, coloum, pump, boiler, Heater and related accessories. 3. E&I ( cable tray, cable, tray support, transformers, capacitor bank, GIS, Electrical panels, light pole, light fixture, instruments panels, workstation, FA & F&G materials, console, cable gland analyser, transmitter, pressure gauge
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Please appointment matrial technical knowledge personal only in store. He knows about Material store and traceability. If missing the material he is the one reponsible identify the materials time issue material to site.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Normal introduction and expectations
Round 3 - Technical 

(1 Question)

  • Q1. Normal introduction and expectations
Round 4 - Technical 

(1 Question)

  • Q1. Related to material planning
Round 5 - HR 

(1 Question)

  • Q1. Negotiation and other

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare about technical before going to interview

I applied via Recruitment Consultant and was interviewed in Dec 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Quality control lab
  • Q2. All testing
  • Q3. All menejment

Interview Preparation Tips

Interview preparation tips for other job seekers - Omprakash Dhakad gram post jamner

L&T Construction Interview FAQs

What are the top questions asked in L&T Construction Material Controller interview?

Some of the top questions asked at the L&T Construction Material Controller interview -

  1. How did plan controlling project materi...read more
  2. How did store the material and preservati...read more
  3. How did you receit material and documentati...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 425 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
AtkinsRealis Interview Questions
4.0
 • 85 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all

L&T Construction Material Controller Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

5.0

Skill development

4.5

Work-life balance

3.5

Salary

4.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
711 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
504 salaries
unlock blur

₹5.4 L/yr - ₹18 L/yr

Construction Management
332 salaries
unlock blur

₹8.2 L/yr - ₹35 L/yr

Assistant Engineering Manager
321 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview