Senior Engineer Interview Questions & Answers

user image AYUSH DIXIT

posted on 15 Aug 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Referral and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Basic Technical Knowledge related to Project requirements

Interview Preparation Tips

Interview preparation tips for other job seekers - Good For Professionals

Top L&T Construction Senior Engineer Interview Questions and Answers

Q1. How many time u take any update shuttering system?
View answer (11)

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Shine and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. On line interviews. Water Supply Projects related questions. I replied HR Seifty Related questions 1-water Supply Swsm,intake well.2-wtp related questions. OHT,(over hade tanks.) Related questions. 3...
  • Ans. Material checked in quality related questions
  • Answered Anonymously
  • Q2. Sefty related questions represent to me.

Senior Quality Controller Interview Questions asked at other Companies

Q1. What is the clear cover in reinforcement and what is the development length in beams and where should beam be give junction
View answer (2)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is electric current, how will be work MCB,how many types of short skt
  • Ans. 

    Electric current is the flow of electric charge. MCB is a safety device that automatically switches off the electrical circuit. There are different types of short circuits.

    • Electric current is the movement of electrons through a conductor.

    • MCB stands for Miniature Circuit Breaker and is used to protect electrical circuits from damage caused by overload or short circuit.

    • Short circuits occur when there is an unintended con...

  • Answered by AI
  • Q2. What is ckt ,what is current,what is resistant, what is voltage
  • Ans. 

    CKT is circuit, current is flow of electrons, resistance is opposition to flow, voltage is electrical potential difference.

    • CKT stands for circuit which is a closed loop through which electricity flows

    • Current is the flow of electrons in a circuit and is measured in amperes (A)

    • Resistance is the opposition to the flow of current and is measured in ohms (Ω)

    • Voltage is the electrical potential difference between two points i...

  • Answered by AI
  • Q3. What is power , why use relay in electric current
  • Ans. 

    Power is the rate at which energy is transferred. Relays are used to control high power circuits with low power signals.

    • Power is measured in watts and is the product of voltage and current

    • Relays are used to isolate high power circuits from low power control circuits

    • Relays can also be used to switch multiple circuits with a single control signal

    • Examples of relay applications include motor control, lighting control, and

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If I have chance for doing job in it company so I will handle work nicely

Electrical Maintenance Engineer Interview Questions asked at other Companies

Q1. Is that you know Digital Multimeter? Show me how to use for different components. They provided me HV diode, HV capacitor, Industrial X'mer etc
View answer (2)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is slip ring
  • Ans. 

    A slip ring is an electrical component used to transfer power and electrical signals from a stationary to a rotating structure.

    • Allows for continuous rotation without tangling wires

    • Commonly used in electromechanical systems like motors, generators, and wind turbines

    • Consists of stationary brushes and rotating conductive rings

    • Helps in transmitting power, data, and signals across rotating interfaces

  • Answered by AI
  • Q2. What is oer unit slip
  • Ans. 

    Unit slip is the difference between synchronous speed and rotor speed in an induction motor.

    • Unit slip is expressed as a fraction or percentage.

    • It is used to calculate the rotor speed of an induction motor.

    • Unit slip is necessary for determining the torque and efficiency of the motor.

    • For example, if the synchronous speed of a motor is 1800 RPM and the rotor speed is 1750 RPM, the unit slip would be 0.0278 or 2.78%.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. What is your family background

Interview Preparation Tips

Interview preparation tips for other job seekers - future goals to determine whether or not you’re looking to stay with the company in the long term. Additionally, this question is used to gauge your ambition, expectations for your career and your ability to plan. The best way to handle this question is to determine your current career trajectory and how this role plays to help you reach your ultimate goals.

Top L&T Construction Electrical Technician Interview Questions and Answers

Q1. 1.Types of Transformer 2.Types of Electrical Drives 3. What is the frequence of India 4. What is your goal
View answer (1)

Electrical Technician Interview Questions asked at other Companies

Q1. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,ACB,MOCB,SF6 Breakers, Breake... read more
View answer (4)

L&T Construction interview questions for popular designations

 Graduate Engineer Trainee (Get)

 (49)

 Civil Site Engineer

 (33)

 Senior Engineer

 (28)

 Civil Engineer

 (25)

 Site Engineer

 (18)

 Assistant Manager

 (14)

 Electrical GET

 (11)

 Engineer Trainee

 (11)

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

Medium range tough questions were asked

Round 3 - Technical 

(2 Questions)

  • Q1. What is HIRA and types of fires
  • Ans. 

    HIRA stands for Hazard Identification and Risk Assessment. There are four types of fires: Class A, B, C, and D.

    • HIRA is a process of identifying potential hazards and assessing the risks associated with them.

    • It involves identifying the hazards, evaluating the risks, and implementing control measures to mitigate the risks.

    • Class A fires involve ordinary combustibles like wood, paper, and cloth.

    • Class B fires involve flamma...

  • Answered by AI
  • Q2. Different types of acts used in safety
  • Ans. 

    Acts used in safety include preventive, corrective, detective, and compensatory measures.

    • Preventive measures aim to avoid accidents or incidents from happening, such as safety training, equipment maintenance, and hazard identification.

    • Corrective measures are taken after an accident or incident has occurred, such as first aid, repairs, and investigations.

    • Detective measures involve monitoring and identifying potential ha...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident while attempting interview
All the best!

Top L&T Construction Senior Engineer Interview Questions and Answers

Q1. How many time u take any update shuttering system?
View answer (11)

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)

Get interview-ready with Top L&T Construction Interview Questions

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 24 May 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Design mix concrete and nominal mix difference
  • Ans. 

    Design mix concrete is a mix of concrete prepared by a designer as per the required strength and durability, while nominal mix concrete is a mix of concrete prepared based on standard ratios without specific design requirements.

    • Design mix concrete is prepared by a designer based on specific requirements for strength and durability.

    • Nominal mix concrete is prepared based on standard ratios like 1:2:4 without specific des...

  • Answered by AI
  • Q2. What is knee bracing
  • Ans. 

    Knee bracing is a structural support used in construction to prevent lateral movement of beams or columns.

    • Knee bracing is a diagonal member used to connect a vertical member to a horizontal member in a structure.

    • It helps to resist lateral forces and prevent buckling or swaying of the structure.

    • Knee bracing is commonly used in steel frame construction to provide stability and support.

    • Examples include diagonal braces con

  • Answered by AI
  • Q3. Portal frame questions

Interview Preparation Tips

Interview preparation tips for other job seekers - keep calm cool

Top L&T Construction Site Engineer Interview Questions and Answers

Q1. 1.) Slump test procedure 2) Tbm 3) how to calculate the wt of steel 4) about site supervision Dpr Dwr And BBS of structure 5) how to calculate concrete quantity of container wall 6) about pipe line
View answer (4)

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)

I applied via Campus Placement and was interviewed in Jun 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. EXPLAIN POWER SYSTEM PROTECTION
  • Ans. 

    Power system protection is a set of measures taken to ensure the safety and reliability of electrical power systems.

    • Power system protection involves detecting and isolating faults in the power system to prevent damage to equipment and ensure continuity of power supply.

    • Protection devices such as relays, fuses, and circuit breakers are used to detect and isolate faults.

    • Relays are used to detect abnormal conditions in the...

  • Answered by AI
  • Q2. Explain Bucholz Relay
  • Ans. 

    Bucholz Relay is a protective device used in oil-immersed transformers to detect and prevent faults.

    • It is installed between the transformer tank and conservator tank.

    • It detects faults such as internal short circuits and incipient faults.

    • It operates on the principle of gas evolution due to the decomposition of oil.

    • It sends a signal to the transformer protection system to isolate the transformer from the power system.

    • It ...

  • Answered by AI
  • Q3. Explain Mho Realy and Explain generators operation in parallel.
  • Ans. 

    Mho relay is a type of distance relay used for fault detection in power systems. Generators operate in parallel to increase power output.

    • Mho relay is a directional relay that operates based on the impedance seen by the relay during a fault.

    • Generators in parallel must have the same voltage, frequency, and phase sequence to avoid damaging the system.

    • Parallel operation of generators requires synchronization and load shari...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare Thoroughly with basics and answer calmly

Top L&T Construction Graduate Engineer Trainee (Get) Interview Questions and Answers

Q1. What will be the cost of painting the wall behind me?
View answer (19)

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Railway formation ,Field drain and structural
  • Q2. Privious company job detail

Interview Preparation Tips

Interview preparation tips for other job seekers - Please, advice u to find me good job in multipurpose company and other international construction company,
The company has got good project as railway,highway,flyover ,bridges and station building in india.

Top L&T Construction Senior Engineer Interview Questions and Answers

Q1. How many time u take any update shuttering system?
View answer (11)

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)

I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Survey 

(2 Questions)

  • Q1. What is meaning in survey?
  • Ans. 

    Meaning in survey refers to the interpretation of data collected through surveying techniques.

    • Meaning in survey involves analyzing and interpreting data collected through surveying techniques.

    • It helps in understanding the characteristics of a particular area or site.

    • Survey meaning can vary depending on the type of survey conducted, such as land survey, topographical survey, or construction survey.

    • For example, in a land...

  • Answered by AI
  • Q2. How many type of survey?
  • Ans. 

    There are several types of surveys used in construction engineering.

    • Topographic survey

    • Boundary survey

    • Construction survey

    • As-built survey

    • ALTA/ACSM survey

    • Hydrographic survey

    • Geodetic survey

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. What is meaning in technical?
  • Ans. 

    In technical, meaning refers to the precise definition or interpretation of a term or concept.

    • Technical meaning is often specific to a particular field or industry.

    • It is important to understand technical meanings in order to communicate effectively within that field.

    • For example, in construction engineering, technical terms like 'load-bearing capacity' and 'structural integrity' have specific meanings that differ from t...

  • Answered by AI
  • Q2. How many type of Technical problem?
  • Ans. 

    There are various types of technical problems that can arise in construction engineering.

    • Design problems

    • Material problems

    • Equipment problems

    • Environmental problems

    • Labor problems

    • Safety problems

    • Budget problems

    • Schedule problems

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Construction Engineer interview:
  • Yes.
Interview preparation tips for other job seekers - I am complet diploma in civil engineering.
In MB C Institute of Technology.

Construction Engineer Interview Questions asked at other Companies

Q1. What's your biggest mistakes in your carrier?
View answer (4)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Online proctored test for 1.5 hour duration. It contained both aptitude and technical part.

Round 2 - Technical 

(3 Questions)

  • Q1. Self-introduction
  • Q2. Brief about the major project.
  • Q3. Follow up technical questions on the project.

Top L&T Construction Graduate Engineer Trainee (Get) Interview Questions and Answers

Q1. What will be the cost of painting the wall behind me?
View answer (19)

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)

L&T Construction Interview FAQs

How many rounds are there in L&T Construction interview?
L&T Construction interview process usually has 2-3 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction interview?

Some of the top questions asked at the L&T Construction interview -

  1. What will be the cost of painting the wall behind ...read more
  2. What do you mean by M25 concre...read more
  3. What are the steps to be followed after receiving the plan of a constructi...read more
How long is the L&T Construction interview process?

The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

L&T Construction Interview Process

based on 851 interviews

Interview experience

4.2
  
Good
View more

L&T Construction Reviews and Ratings

based on 6k reviews

4.0/5

Rating in categories

4.0

Skill development

3.4

Work-life balance

3.8

Salary

4.0

Job security

3.7

Company culture

3.4

Promotions

3.6

Work satisfaction

Explore 6k Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
410 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview