L&T Construction
Sonata Software Interview Questions and Answers
Q1. How did plan controlling project material?
Project material was controlled by creating a detailed plan and monitoring inventory levels.
Developed a comprehensive project plan that included material requirements and timelines
Monitored inventory levels to ensure materials were ordered and received in a timely manner
Collaborated with suppliers to ensure timely delivery of materials
Implemented a system to track material usage and waste
Regularly reviewed and updated the project plan to account for any changes or delays
Q2. How did store the material and preservation?
Materials are stored according to their specific requirements for preservation.
Materials are stored in appropriate containers or packaging to prevent damage or contamination.
Temperature and humidity levels are monitored and controlled as necessary.
Materials are labeled with information such as date received, expiration date, and storage requirements.
Regular inspections and inventory checks are conducted to ensure proper storage and preservation.
Examples of preservation method...read more
Q3. How did you receit material and documentation?
As a Material Controller, I received material and documentation through various methods.
Received material through purchase orders and delivery notes.
Received documentation through email, physical copies, or online portals.
Verified the accuracy of material and documentation against the purchase order or request.
Checked for any damages or discrepancies and reported them to the appropriate department.
Maintained a record of received material and documentation for inventory purpos...read more
Q4. How do you inspection the materials?
Materials are inspected by following established procedures and using appropriate tools and equipment.
Inspect materials upon receipt to ensure they meet specifications
Use measuring tools such as calipers and micrometers to check dimensions
Perform visual inspections for defects or damage
Conduct tests to verify material properties
Document inspection results and report any issues to appropriate personnel
Q5. How did store E&I panels?
E&I panels should be stored in a dry and clean area with proper labeling.
Store panels in a dry and clean area to prevent damage from moisture and dirt.
Label the panels clearly to ensure easy identification and retrieval.
Store panels vertically to prevent warping or bending.
Use protective covers to prevent scratches or other damage.
Regularly inspect the panels for any signs of damage or wear.
Follow manufacturer's instructions for storage and handling.
Q6. What's is your safety plan?
My safety plan includes regular safety audits, employee training, and strict adherence to safety protocols.
Regular safety audits to identify potential hazards and address them promptly
Employee training on safety procedures and protocols
Strict adherence to safety protocols to minimize the risk of accidents
Proper use of personal protective equipment (PPE)
Emergency response plan in place in case of accidents or incidents
Continuous improvement of safety measures based on feedback...read more
Reviews
Interviews
Salaries
Users/Month