Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Interview Questions, Process, and Tips

Updated 9 Mar 2025

Top L&T Construction Interview Questions and Answers

View all 575 questions

L&T Construction Interview Experiences

Popular Designations

745 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

DATA INTERPRETATION QUESTIONS, READING COMPREHENSION, CIVIL ENGG. SHORT QUENTIONS

Round 2 - HR 

(3 Questions)

  • Q1. TELL ME ABOUT YOURSELF
  • Q2. STRENGHT, WEAKNESS
  • Q3. MY FUTURE GOALS

Top L&T Construction Graduate Engineer Trainee (Get) Interview Questions and Answers

Q1. What will be the cost of painting the wall behind me?
View answer (19)

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Aptitude Test 

Easy to moderate level questions

Senior Design Engineer Interview Questions asked at other Companies

Q1. Noise, Vibration, and Harshness (NVH) in gearboxes are influenced by several factors, which can broadly be categorized into design, material, manufacturing, and operational factors. Here are some key factors affecting NVH in gearboxes: ### ... read more
View answer (1)

Accountant Interview Questions & Answers

user image Anonymous

posted on 5 Apr 2024

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Assignment 

Classic interviewer with knowladgeble skills

Round 2 - Group Discussion 

Need to accurate and presence of mind require at each level

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice co to work with

Accountant Interview Questions asked at other Companies

Q1. What journal is made when purchase requisition is created
View answer (25)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Brick work joint filling which thickness
  • Ans. 

    The thickness of brick work joint filling typically ranges from 10mm to 20mm.

    • Brick work joint filling thickness is usually around 10mm to 20mm.

    • The thickness may vary based on the type of bricks used and the specific requirements of the project.

    • It is important to follow the specifications provided in the construction plans for the joint filling thickness.

    • Properly filled joints help in ensuring the structural integrity a

  • Answered by AI
  • Q2. Plaster internal wall thickness
  • Ans. Plaster internal wall thickness is 12mm
  • Answered Anonymously
  • Q3. External wall plaster thickness how
  • Ans. 

    The external wall plaster thickness is typically determined by the type of finish desired and the structural requirements of the building.

    • External wall plaster thickness can vary depending on the type of finish, such as smooth, textured, or decorative.

    • The thickness may also be influenced by the structural requirements of the building, such as insulation or soundproofing needs.

    • Common external wall plaster thickness rang...

  • Answered by AI
  • Q4. Rcc surface Plaster thickness how
  • Ans. 

    The thickness of RCC surface plaster is determined based on the structural requirements and design specifications.

    • RCC surface plaster thickness is typically specified in the construction drawings or project specifications.

    • The thickness of RCC surface plaster can vary depending on the type of finish desired, such as smooth or textured.

    • It is important to ensure that the RCC surface plaster is applied evenly and at the co...

  • Answered by AI
  • Q5. Wall plaster mortar ratio how
  • Ans. 

    The wall plaster mortar ratio is typically 1:3 or 1:4, meaning one part cement to three or four parts sand.

    • Common ratios include 1:3 and 1:4, with one part cement to three or four parts sand respectively

    • The ratio may vary depending on the specific requirements of the project

    • Proper mixing and consistency are crucial for a strong and durable finish

  • Answered by AI
  • Q6. Hardonite Flooring how thickness & method
  • Ans. 

    Hardonite flooring is a type of flooring known for its durability and strength. The thickness and method of installation depend on the specific requirements of the project.

    • Hardonite flooring is typically installed at a thickness of 1/4 inch to 1/2 inch, depending on the level of durability required.

    • The method of installation involves preparing the subfloor, applying a bonding agent, pouring the Hardonite mixture, and t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Quality work & work programing day by day & progress work & Hause Keeping time to time & curing must

Civil Foreman (Finishing) Interview Questions asked at other Companies

Q1. Brick work joint filling which thickness
View answer (3)

L&T Construction interview questions for popular designations

 Graduate Engineer Trainee (Get)

 (49)

 Civil Site Engineer

 (33)

 Senior Engineer

 (28)

 Civil Engineer

 (25)

 Site Engineer

 (18)

 Assistant Manager

 (14)

 Electrical GET

 (11)

 Engineer Trainee

 (11)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Cycle time required
  • Q2. Justification of machine
  • Ans. 

    The machine is justified based on its efficiency, cost-effectiveness, and ability to meet the needs of the organization.

    • Efficiency: The machine should be able to perform its tasks quickly and accurately.

    • Cost-effectiveness: The machine should provide value for money in terms of its initial cost, maintenance, and operational expenses.

    • Meeting organizational needs: The machine should fulfill the specific requirements and g...

  • Answered by AI
  • Q3. Engineer of machine
  • Q4. Downtime reduction

Interview Preparation Tips

Interview preparation tips for other job seekers - Good , learn , use and apply

Power House Manager Interview Questions asked at other Companies

Q1. Justification of machine
View answer (1)

Get interview-ready with Top L&T Construction Interview Questions

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

The interview coding based on c programming and simple aptitude question, C program is some advance in question, environment of interview very clam and relax. They are more expecting in file operation program

Round 2 - Coding Test 

Coding questions were basic from c and cpp

Graduate Engineer Interview Questions asked at other Companies

Q1. What is Finite Element Analysis? Explain using examples.
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Costing and planning

Senior Manager Interview Questions asked at other Companies

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)

Manager Interview Questions & Answers

user image Anonymous

posted on 31 May 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Normal HR related questions.
Round 2 - Technical 

(1 Question)

  • Q1. Technical details of the past projects completed.

Interview Preparation Tips

Interview preparation tips for other job seekers - Better to focus on details of past project completed.

Manager Interview Questions asked at other Companies

Q1. There is a chairman of a conglomerate. He has been on the post for 10 years, and is extremely dominating. He treats the various business heads like children, not letting them take any major decision. While the chairman has negatives, he bel... read more
View answer (2)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Questions about monopile
  • Q2. Quantity for pile ,pile cap
  • Ans. 

    The quantity for pile and pile cap is determined based on the design requirements and load calculations.

    • The quantity of piles is determined based on the structural load requirements and soil conditions.

    • The quantity of pile caps is determined based on the number of piles and the design of the structure.

    • Calculations for pile and pile cap quantities involve factors such as load distribution, material strength, and safety

  • Answered by AI

Structural Engineer Interview Questions asked at other Companies

Q1. 1. Find weight and COG of an irrrgular shape. Unit weight of member was given. 2. Calculate force required for COG shift. W load was applied at center of rectangle and we had to calculate forces at all four corners to shift the cog. 3. SFD ... read more
View answer (2)
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. What is fire alarm system
  • Ans. 

    A fire alarm system is a network of devices that detects and alerts people to the presence of fire in a building.

    • Consists of smoke detectors, heat detectors, alarms, and control panels

    • Activates alarms to alert occupants and authorities in case of fire

    • Can be manual or automatic

    • May include emergency communication systems for evacuation instructions

    • Commonly used in commercial buildings, schools, and residential homes

  • Answered by AI
  • Q2. HT panel safety
Round 2 - HR 

(2 Questions)

  • Q1. Lightning arrester
  • Q2. LT panel safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Application for senior electrical Engineer-MEP

Electrical Engineer - MEP Interview Questions asked at other Companies

Q1. What is fire alarm system
View answer (1)

L&T Construction Interview FAQs

How many rounds are there in L&T Construction interview?
L&T Construction interview process usually has 2-3 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction interview?

Some of the top questions asked at the L&T Construction interview -

  1. What will be the cost of painting the wall behind ...read more
  2. What do you mean by M25 concre...read more
  3. What are the steps to be followed after receiving the plan of a constructi...read more
How long is the L&T Construction interview process?

The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

L&T Construction Interview Process

based on 848 interviews

Interview experience

4.2
  
Good
View more

L&T Construction Reviews and Ratings

based on 6k reviews

4.0/5

Rating in categories

4.0

Skill development

3.4

Work-life balance

3.8

Salary

4.0

Job security

3.7

Company culture

3.4

Promotions

3.6

Work satisfaction

Explore 6k Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
391 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview