Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Interview Questions, Process, and Tips

Updated 9 Mar 2025

Top L&T Construction Interview Questions and Answers

View all 575 questions

L&T Construction Interview Experiences

Popular Designations

745 interviews found

Junior Engineer Interview Questions & Answers

user image Shekar Yeriboyina

posted on 22 May 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is rebar ?
  • Ans. 

    Rebar is a steel bar or mesh of steel wires used in reinforced concrete structures to provide strength and stability.

    • Rebar is short for reinforcing bar.

    • It is commonly used in construction to reinforce concrete structures such as buildings, bridges, and roads.

    • Rebar comes in various sizes and shapes, such as round, square, or deformed.

    • Examples of rebar include deformed bars, welded wire fabric, and epoxy-coated rebar.

  • Answered by AI
  • Q2. Providing additional reinforcement

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Aptitude test will be conducted in online mode in english language after your name is shortlisted
Test is based on aptitude (basic maths and reasoning) ,english and technical questions (related to your your branch subject) .

Round 3 - Technical 

(3 Questions)

  • Q1. After passing in assessment test you will receive an mail for your interview It consists both technical and HR round .
  • Q2. In HR round normally your introduction and family background Technical questions from your core subject related basic questions for freshers
  • Q3. In technical basic thermodynamics ,SOM and power plant and subjects questions

Interview Preparation Tips

Topics to prepare for L&T Construction Diploma Trainee Engineer interview:
  • Thermodynamics
  • Strength of material
  • Fluid Mechanics
  • Thermal Engineering
  • Air conditioning and refrigerati
  • Power plant engineering
  • AutoCAD
  • REVIT
  • Solid Works
Interview preparation tips for other job seekers - All the best for all job seekers
Keep your doubt clear from your subject related problems and also develop soft skills

Diploma Trainee Engineer Interview Questions asked at other Companies

Q1. Wich of the following laws states that: in any electrical network the algebraic sum of the current meeting at a poin is zero ?
View answer (9)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me about your self

B Tech Civil Engineer Interview Questions asked at other Companies

Q1. What is the process of earthquake design of a multi storey building?
View answer (2)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. What is the hevey tower
  • Ans. 

    The heavy tower is a structure used in construction projects to support heavy loads and provide stability.

    • Heavy towers are typically made of steel or concrete to withstand the weight of equipment and materials.

    • They are often used in conjunction with cranes to lift and move heavy objects.

    • Heavy towers play a crucial role in ensuring the safety of workers and the success of construction projects.

  • Answered by AI
  • Q2. What is the TPI
  • Ans. 

    TPI stands for Threads Per Inch, a measurement used in manufacturing and engineering to determine the number of threads on a screw or bolt.

    • TPI is calculated by counting the number of threads within a one-inch length on a screw or bolt.

    • Higher TPI values indicate finer threads, while lower TPI values indicate coarser threads.

    • TPI is an important factor in determining the compatibility of nuts and bolts in mechanical assem

  • Answered by AI
  • Q3. What is the work parmit system
  • Ans. 

    A work permit system is a formal written system used to control certain types of work that are potentially hazardous.

    • Work permit systems ensure that proper precautions are taken before high-risk work is carried out.

    • They typically involve a written permit that must be obtained before work begins.

    • Examples of work permit systems include hot work permits, confined space entry permits, and excavation permits.

  • Answered by AI
  • Q4. What is the lifting work system
  • Ans. 

    The lifting work system refers to the process and procedures in place for safely lifting and moving heavy objects in the workplace.

    • Involves assessing the weight and size of the object to be lifted

    • Determining the appropriate lifting equipment to use

    • Ensuring proper lifting techniques are followed to prevent injuries

    • Training employees on safe lifting practices

    • Implementing protocols for team lifts when necessary

  • Answered by AI
  • Q5. What is the welding work hazard s
  • Ans. 

    Welding work hazards include exposure to fumes, gases, radiation, and electrical hazards.

    • Exposure to welding fumes can lead to respiratory issues and metal fume fever.

    • Gases produced during welding, such as carbon monoxide and nitrogen oxides, can be harmful if inhaled.

    • Radiation from welding arcs can cause eye damage and skin burns.

    • Electrical hazards can result from faulty equipment or improper grounding, leading to sho

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Safety Supervisor interview:
  • J2Me
  • Safety
Interview preparation tips for other job seekers - Not fill the any advice sir

Top L&T Construction Safety Supervisor Interview Questions and Answers

Q1. Which device is used to prevent fire in gas cutting set ?
View answer (1)

Safety Supervisor Interview Questions asked at other Companies

Q1. 1> What is Difference between Accident v/s Incident ? 2> What is Hazard ? 3> What is fire and types of Fire ? 4> Tell me about Confined Space ? 5> what is near Miss ? 6> What Is Excavation Safety ? 7> What is work permi... read more
View answer (3)

L&T Construction interview questions for popular designations

 Graduate Engineer Trainee (Get)

 (49)

 Civil Site Engineer

 (33)

 Senior Engineer

 (28)

 Civil Engineer

 (25)

 Site Engineer

 (18)

 Assistant Manager

 (14)

 Electrical GET

 (11)

 Engineer Trainee

 (11)

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Questions on java
  • Q2. Questions on oops

Associate Software Engineer Interview Questions asked at other Companies

Q1. Triplets with Given Sum Problem Given an array or list ARR consisting of N integers, your task is to identify all distinct triplets within the array that sum up to a specified number K. Explanation: A triplet is a set {ARR[i], ARR[j], ARR[k... read more
View answer (2)

Get interview-ready with Top L&T Construction Interview Questions

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

30 mins 20 questions

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare well

Software Developer Interview Questions asked at other Companies

Q1. Maximum Subarray Sum Problem Statement Given an array of integers, determine the maximum possible sum of any contiguous subarray within the array. Example: Input: array = [34, -50, 42, 14, -5, 86] Output: 137 Explanation: The maximum sum is... read more
View answer (42)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was easy and moderate

Round 2 - Technical 

(2 Questions)

  • Q1. It was moderat and easy
  • Q2. About basics of civil engineering and structural engineering

Production Graduate Engineer Trainee Interview Questions asked at other Companies

Q1. PRINCIPLE ON WHICH HEAT TRANSFER WORKS (ALL PHASES)
View answer (1)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Civil engineering basic
  • Q2. 1day letar for interview
  • Q3. Contraction planing and Menegmend
  • Q4. Building Menegmend

Diploma Civil Engineer Interview Questions asked at other Companies

Q1. What is width of pavement in two lines road with out kerb?
View answer (1)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 10 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Billings Site work
Round 2 - HR 

(1 Question)

  • Q1. Billing Sire work

Top L&T Construction Site Engineer Interview Questions and Answers

Q1. 1.) Slump test procedure 2) Tbm 3) how to calculate the wt of steel 4) about site supervision Dpr Dwr And BBS of structure 5) how to calculate concrete quantity of container wall 6) about pipe line
View answer (4)

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

The mode of Aptitude Test is Online. There were several questions analytical, quantitative, Verbal, and Technical questions all topics consisted of 30 questions each and each one of them consisted 1 mark and there were no negative markings which is the best thing. Overall the questions were much more manageable than my expectations.

Round 3 - One-on-one 

(5 Questions)

  • Q1. The interview experience was great for me. The interviewer asked me questions that were easy to understand, whether they were technical or HR-related. They asked me, "Will you pursue further education or w...
  • Q2. Q1. Self Introduction
  • Q3. Q2. Final Year Project
  • Q4. Q3. Technical Questions
  • Q5. Q5. The most common question was, " Will pursue further education or going to focus on a job."

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay sharp at the time of the interview and answer all the questions confidently. And make sure that you are sitting in a quiet area.

Diploma Trainee Engineer Interview Questions asked at other Companies

Q1. Wich of the following laws states that: in any electrical network the algebraic sum of the current meeting at a poin is zero ?
View answer (9)

L&T Construction Interview FAQs

How many rounds are there in L&T Construction interview?
L&T Construction interview process usually has 2-3 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction interview?

Some of the top questions asked at the L&T Construction interview -

  1. What will be the cost of painting the wall behind ...read more
  2. What do you mean by M25 concre...read more
  3. What are the steps to be followed after receiving the plan of a constructi...read more
How long is the L&T Construction interview process?

The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

L&T Construction Interview Process

based on 848 interviews

Interview experience

4.2
  
Good
View more

L&T Construction Reviews and Ratings

based on 6k reviews

4.0/5

Rating in categories

4.0

Skill development

3.4

Work-life balance

3.8

Salary

4.0

Job security

3.7

Company culture

3.4

Promotions

3.6

Work satisfaction

Explore 6k Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
391 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview