Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Senior Devops Engineer Interview Questions and Answers

Updated 29 Oct 2024

L&T Construction Senior Devops Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I appeared for an interview before Oct 2023.

Round 1 - HR 

(2 Questions)

  • Q1. How much salary your expecting
  • Ans. 

    I expect a competitive salary that reflects my experience and the value I bring to the team, typically in the range of $120,000 to $150,000.

    • Based on industry standards, my expectation aligns with the average salary for Senior DevOps Engineers in this region.

    • I have over 7 years of experience in DevOps, which includes expertise in CI/CD pipelines, cloud infrastructure, and automation.

    • I am also considering the total compe...

  • Answered by AI
  • Q2. Current package

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Productivity of Machinery & Manpower
  • Ans. 

    Productivity of machinery and manpower is crucial for efficient operations.

    • Efficient machinery and skilled manpower can increase productivity.

    • Regular maintenance of machinery can prevent downtime and increase productivity.

    • Proper training and motivation of manpower can also improve productivity.

    • Use of automation and technology can further enhance productivity.

    • Productivity can be measured using metrics such as output per...

  • Answered by AI
  • Q2. Standard thumb rule in estimation
  • Ans. 

    Standard thumb rule in estimation

    • Thumb rule is a rough estimate based on experience

    • It is not accurate and can vary based on project

    • Example: 1 hour per page for content writing

    • Example: 1 month per developer for a software project

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be precise and accurate. Information of planning software.

Senior Devops Engineer Interview Questions Asked at Other Companies

Q1. What are Terraform life cycles ? and how do we use them ?
Q2. How do you trigger a pipeline from a specific version of applicat ... read more
Q3. What is ingress in Kubernetes, and how does it help us when deplo ... read more
Q4. what are stages involved in release pipeline ? Explain the code
Q5. What are TF provisioners? Describe their use cases.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Not Selected

I applied via Job Fair and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Naaa g g g g
  • Q2. Dddd fvv fffh hhhb
  • Q3. Fggg gghh ggghbhbbbbb hhhhh
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. Have you experience if planning tools like MSP & Primavera?
  • Ans. 

    Yes, I have extensive experience with planning tools like MSP and Primavera for project management and scheduling.

    • Proficient in Microsoft Project (MSP) for creating Gantt charts and tracking project progress.

    • Utilized Primavera P6 for managing large-scale construction projects, ensuring resource allocation and timeline adherence.

    • Experience in integrating MSP with other tools for enhanced reporting and collaboration.

    • Impl...

  • Answered by AI
  • Q2. What's project life cycle
  • Ans. 

    The project life cycle outlines the stages a project goes through from initiation to closure.

    • 1. Initiation: Define the project scope and objectives. Example: A project charter is created.

    • 2. Planning: Develop a detailed project plan, including timelines and resources. Example: Gantt charts are often used.

    • 3. Execution: Implement the project plan and monitor progress. Example: Team members complete assigned tasks.

    • 4. Monit...

  • Answered by AI

What people are saying about L&T Construction

View All
an environmental health and safety officer
2w
Job Switch Referral/Lead help!!! Designation: safety officer Current Company: ACCURATE LOGIST Pvt. Ltd Previous Company: MARKOUT SOURCING
Experience in Years: 4 years in construction safety Current CTC: 3.5LPA Expected CTC: 4.2LPA Im looking for job switch in UP/GJ/MH/MP/DL location. Any referrals or lead please contact. Email: viveksing1391999@gmail.com
Got a question about L&T Construction?
Ask anonymously on communities.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Self introduction, current project status,and what you have done in project.
Round 3 - Technical 

(1 Question)

  • Q1. Tells Status of round -1, and are you allocated for what they wanted location,if you are agree then continue the final of HR
Round 4 - Technical 

(1 Question)

  • Q1. Asks current CTC and expected CTC

Interview Preparation Tips

Interview preparation tips for other job seekers - Dont fear of interview, tell us what you capable of the position.
Are these interview questions helpful?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I appeared for an interview in Mar 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Basic engineering
  • Q2. Skew length, reconcile subcon bill
  • Q3. BOQ preparation
  • Q4. Client bill,RFI
  • Q5. Software related

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before May 2024, where I was asked the following questions.

  • Q1. Why curing is necessary for concreting.
  • Q2. What is heat of hydration
  • Q3. Why cover block is required in a structure
  • Q4. What is udl
  • Q5. What is bending moment
  • Q6. What is shear force

Interview Preparation Tips

Interview preparation tips for other job seekers - If there is a relationship in this company then it is ok to do job here. Otherwise very much politics is here.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Pile related and stressing related and what type of work is working on
  • Q2. Density of bentonite Prestressing formula
  • Ans. 

    Density of bentonite and prestressing formula are two separate topics in civil engineering.

    • Density of bentonite is typically around 2.0-2.5 g/cm^3.

    • Prestressing formula involves calculating the stress in a structure due to applied loads and prestressing forces.

    • Example of prestressing formula: Stress = Load / Area + Prestressing Force / Area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep interview frelly and discussion

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Senior Devops Engineer interview?
L&T Construction interview process usually has 1 rounds. The most common rounds in the L&T Construction interview process are HR.

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Interview Questions from Similar Companies

Dilip Buildcon Interview Questions
4.0
 • 158 Interviews
G R Infraprojects Interview Questions
4.1
 • 145 Interviews
AtkinsRealis Interview Questions
3.9
 • 92 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 72 Interviews
View all
Assistant Manager
1.1k salaries
unlock blur

₹8.6 L/yr - ₹15 L/yr

Senior Engineer
731 salaries
unlock blur

₹5.1 L/yr - ₹10.9 L/yr

Assistant Construction Manager
493 salaries
unlock blur

₹9 L/yr - ₹16 L/yr

Civil Site Engineer
383 salaries
unlock blur

₹1.6 L/yr - ₹8.4 L/yr

Construction Management
346 salaries
unlock blur

₹10 L/yr - ₹35 L/yr

Explore more salaries
Compare L&T Construction with

Larsen & Toubro Limited

3.9
Compare

Dilip Buildcon

4.0
Compare

Simplex Infrastructures

3.3
Compare

Power Mech Projects

3.8
Compare
write
Share an Interview