Filter interviews by
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Sep 2021. There were 2 interview rounds.
What is super structure and what is substrate
Type of piles
Asked about BBS
Also asked cement grade
What is clear cover provide superstructure and substructure. Etc
posted on 20 Jul 2017
posted on 14 Nov 2017
I was interviewed before Nov 2016.
Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.
Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.
It involves the use of leveling instruments such as a level, theodolite, or laser level.
The process typically includes setting up benchmarks or reference points, taking readings at different...
The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.
The diameter is the distance across the center of a circle, passing through the circumference.
A six mm diameter can be visualized as a circle with a width of six millimeters.
It is a common measurement used in various industries, including engineering and manufacturing.
For example, a six mm diameter steel rod w...
LEP stands for Load Equivalent Factor for Pavement design.
LEP is used in pavement design to determine the load-carrying capacity of the pavement.
The formula for LEP depends on the specific design method being used.
For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))
Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...
posted on 6 Dec 2017
Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.
Optimize processes to eliminate inefficiencies and reduce wasted time
Utilize technology tools to automate repetitive tasks and streamline workflows
Delegate tasks to team members to distribute workload and free up time for higher priority tasks
Set clear priorities and focus on important tasks to avoid wasting
posted on 20 Dec 2020
posted on 29 Jan 2021
posted on 22 Jul 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
The question is incomplete and does not make sense.
The question is missing important information.
It is unclear what the question is asking for.
There is no context provided for the question.
Without more information, it is impossible to answer the question.
The M-5 to M-25 ratio is a measure used in civil engineering to determine the strength of concrete mixtures.
The M-5 to M-25 ratio refers to the ratio of cement, sand, and aggregate in a concrete mixture.
The ratio indicates the compressive strength of the concrete after 28 days of curing.
For example, an M-20 concrete mix has a ratio of 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.
T...
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Aug 2020. There was 1 interview round.
based on 32 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
703
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
504
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
393
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineering Manager
323
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA