  • Q1. What type of safety measures you follow during the construction work
  • Q2. What was the minimum number of days for the Mivan shuttering slab cycle in your previous project?
  • Q3. What is the complete process for documentation and obtaining all original certificates?
View all 10 questions

L&T Construction Assistant Construction Manager Interview Experiences for Experienced

9 interviews found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me how to work your last company.
  • Q2. Pipe laying procedure.
  • Ans. 

    Pipe laying procedure involves planning, excavation, laying the pipe, backfilling, and testing for leaks.

    • Plan the layout of the pipes based on the project requirements and specifications.

    • Excavate the trench to the required depth and width to accommodate the pipe.

    • Lay the pipes carefully in the trench, ensuring proper alignment and slope for efficient flow.

    • Backfill the trench with suitable material to provide support and...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - HR 

(4 Questions)

  • Q1. Educational background
  • Q2. Previous organization with roles & responsibilities over there
  • Ans. 

    I worked at XYZ Construction as a Project Engineer, where I managed subcontractors, created project schedules, and ensured quality control.

    • Managed subcontractors to ensure timely completion of projects

    • Created and maintained project schedules to track progress

    • Ensured quality control measures were implemented throughout the construction process

  • Answered by AI
  • Q3. Pay scale
  • Q4. Expectation
Round 2 - Technical 

(3 Questions)

  • Q1. Present project details with respect of cost, time and specifications
  • Q2. Structural detailes, bridge elements and size & shape
  • Q3. Material specifications and requirement
  • Ans. 

    Material specifications and requirements are essential for ensuring quality and compliance in construction projects.

    • Material specifications outline the quality, type, and quantity of materials required for a project.

    • Requirements may include specific brands, sizes, grades, and certifications for materials.

    • Compliance with building codes and regulations is crucial when determining material specifications.

    • Examples of mater...

  • Answered by AI
Round 3 - Technical 

(3 Questions)

  • Q1. Planning, time cycles for various activities like shattering, reinforcement, inspection and concreting.
  • Q2. Details about steel reinforcement and specifications.
  • Q3. Manpower requirement and productivity.

Interview Preparation Tips

Interview preparation tips for other job seekers - Candidate should well know the project cost, completion timeline, project specifications, structural details, technical knowledge of construction materials and techniques.

Assistant Construction Manager Interview Questions Asked at Other Companies for Experienced

Q1. how much load is taking by adjustable props for shuttering works.
Q2. How many types of shuttering methods & advantages for each.
Q3. What type of safety measures you follow during the construction w ... read more
Q4. What is the complete process for documentation and obtaining all ... read more
Q5. What was the minimum number of days for the Mivan shuttering slab ... read more

Assistant Construction Manager Interview Questions & Answers

user image Mohammad Salman Ansari

posted on 7 Feb 2025

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - HR 

(2 Questions)

  • Q1. Can you provide your name, background, previous experience, and current location?
  • Ans. 

    My name is John Smith, I have a background in civil engineering, 5 years of experience in construction management, and I am currently located in Los Angeles.

    • Name: John Smith

    • Background: Civil engineering

    • Previous experience: 5 years in construction management

    • Current location: Los Angeles

  • Answered by AI
  • Q2. What are your qualifications, and how many projects have you completed?
  • Ans. 

    I have a Bachelor's degree in Construction Management and have completed 10 projects so far.

    • Bachelor's degree in Construction Management

    • 10 completed projects

    • Experience in managing construction projects from start to finish

    • Knowledge of construction methods, materials, and regulations

    • Strong communication and leadership skills

  • Answered by AI
Round 2 - Technical 

(4 Questions)

  • Q1. What is your current company, and what is your designation there?
  • Ans. 

    I am currently working at XYZ Construction Company as a Project Engineer.

    • Current company: XYZ Construction Company

    • Designation: Project Engineer

    • Responsibilities include managing project timelines, budgets, and coordinating with subcontractors

    • Experience in overseeing construction projects from start to finish

  • Answered by AI
  • Q2. How many projects have you completed from start to finish, and what were your responsibilities in those projects?
  • Ans. 

    I have completed 5 projects from start to finish, overseeing scheduling, budgeting, subcontractor management, and quality control.

    • Managed scheduling to ensure timely completion

    • Oversaw budgeting to control costs

    • Managed subcontractors to ensure quality work

    • Implemented quality control measures

    • Communicated with stakeholders regularly

  • Answered by AI
  • Q3. Can you outline the planning and scheduling of work from start to finish?
  • Ans. 

    Planning and scheduling of work involves creating a timeline and assigning tasks to ensure timely completion of a project.

    • Develop a project schedule outlining key milestones and deadlines

    • Allocate resources such as labor, materials, and equipment to tasks

    • Monitor progress and adjust schedule as needed to meet deadlines

    • Coordinate with subcontractors and suppliers to ensure timely delivery of materials

    • Communicate with stak...

  • Answered by AI
  • Q4. What was the minimum number of days for the Mivan shuttering slab cycle in your previous project?
  • Ans. 

    The minimum number of days for the Mivan shuttering slab cycle in my previous project was 7 days.

    • The Mivan shuttering slab cycle typically takes 7-10 days to complete.

    • Efficient planning and coordination can help reduce the cycle time.

    • Using experienced labor and proper equipment can also speed up the process.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What is the complete process for documentation and obtaining all original certificates?
  • Ans. 

    The process involves collecting, organizing, and verifying all necessary documentation and certificates.

    • Collect all required documents such as permits, licenses, and insurance certificates.

    • Organize the documents in a systematic manner for easy access and reference.

    • Verify the authenticity and validity of each certificate by cross-checking with issuing authorities.

    • Ensure all original certificates are obtained and stored ...

  • Answered by AI
  • Q2. What is your current salary, and what are your salary expectations from our company?
  • Ans. 

    I am currently earning $60,000 annually and I am looking for a competitive salary based on my experience and qualifications.

    • Provide your current salary and mention that it is subject to change based on the offer

    • Express your salary expectations as being competitive and based on your experience

    • Avoid giving a specific number, instead focus on the value you bring to the role

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Aug 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Civil execution related questions, like project completion time,productivity, uses of equipment and material, repeatation of materials, SCC concrete,
Round 3 - HR 

(2 Questions)

  • Q1. Salary negotiation
  • Q2. Why u quit your present organisation

L&T Construction interview questions for designations

 Construction Manager Civil

 (3)

 Senior Construction Manager

 (3)

 Construction Manager - Mechanical

 (1)

 Construction Management

 (7)

 Construction Engineer

 (2)

 Senior Engineer Construction

 (1)

 Construction Site Engineer

 (1)

 Construction Engineer - Civil

 (1)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General information related to your profile
Round 3 - Technical 

(2 Questions)

  • Q1. Total technical questions
  • Q2. Basic knowledge questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare your CV, according to your expertise. 95% interviewer asks questions related what you mentioned in your CV. Don't mention any unnecessary knowledge/training. Be honest and shortly express your experience and knowledge.

Get interview-ready with Top L&T Construction Interview Questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About work experience only
  • Q2. Work related target achievement

Interview Preparation Tips

Interview preparation tips for other job seekers - Concentrate on work experience & some codes of work..
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Genral aptitude, technical electrical questions, mathematics

Round 2 - One-on-one 

(2 Questions)

  • Q1. How power plant work
  • Ans. 

    Power plants generate electricity by converting mechanical energy into electrical energy through various processes.

    • Power plants use fuel (such as coal, natural gas, or nuclear material) to heat water and produce steam.

    • The steam drives a turbine connected to a generator, which produces electricity.

    • There are different types of power plants including coal-fired, natural gas, nuclear, hydroelectric, and renewable energy pl...

  • Answered by AI
  • Q2. Ohm s law, transformer parts and function

Interview Questionnaire 

4 Questions

  • Q1. What is your current role in present company
  • Q2. What you are looking at site.
  • Q3. Tell me briefly about pipeline work
  • Ans. 

    Pipeline work involves the construction, maintenance, and repair of pipelines used for transporting fluids or gases.

    • Pipeline work includes excavation, welding, coating, and testing of pipelines.

    • Construction of pipelines involves laying pipes, installing valves, and building pump stations.

    • Maintenance work includes inspecting pipelines for leaks, corrosion, and other damage.

    • Repair work involves fixing leaks, replacing da...

  • Answered by AI
  • Q4. How the pipes are welded
  • Ans. 

    Pipes are welded using various techniques such as arc welding, gas welding, and electric resistance welding.

    • Arc welding involves using an electric arc to melt the edges of the pipes and then joining them together.

    • Gas welding uses a flame produced by burning a mixture of fuel gas and oxygen to heat the pipes and create a molten pool for joining.

    • Electric resistance welding passes an electric current through the pipes, ge...

  • Answered by AI

I applied via Naukri.com and was interviewed in Oct 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Tell me about yourself including your experience
  • Q2. Types of structures constructed
  • Ans. 

    Various types of structures are constructed in construction industry.

    • Residential buildings such as apartments, villas, and houses

    • Commercial buildings such as offices, shopping malls, and hotels

    • Industrial buildings such as factories and warehouses

    • Infrastructure projects such as roads, bridges, and tunnels

    • Specialized structures such as sports stadiums, hospitals, and airports

  • Answered by AI
  • Q3. Regarding qty surveying
  • Q4. What type of safety measures you follow during the construction work
  • Ans. 

    We follow strict safety protocols to ensure the well-being of workers and prevent accidents.

    • We conduct regular safety meetings to discuss potential hazards and how to avoid them.

    • We provide personal protective equipment (PPE) such as hard hats, safety glasses, and gloves.

    • We implement fall protection measures such as guardrails, safety nets, and harnesses.

    • We ensure that all equipment and machinery are properly maintained...

  • Answered by AI
  • Q5. Capacity of WTP in which you have experience
  • Ans. 

    I have experience working with WTPs with capacities ranging from 5 MGD to 50 MGD.

    • Worked on a 5 MGD WTP project in my previous role

    • Managed construction of a 20 MGD WTP in my current role

    • Assisted in the design of a 50 MGD WTP during my internship

  • Answered by AI
  • Q6. Are you willing to work in PAN India

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive everything will be fine

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Computer aptitude test

Round 2 - HR 

(1 Question)

  • Q1. Tell about yourself and your interests what are your hobbies etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and be thorough in subject gained in graduation

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Assistant Construction Manager interview for experienced candidates?
L&T Construction interview process for experienced candidates usually has 2-3 rounds. The most common rounds in the L&T Construction interview process for experienced candidates are Technical, HR and Resume Shortlist.
What are the top questions asked in L&T Construction Assistant Construction Manager interview for experienced candidates?

Some of the top questions asked at the L&T Construction Assistant Construction Manager interview for experienced candidates -

  1. What type of safety measures you follow during the construction w...read more
  2. What was the minimum number of days for the Mivan shuttering slab cycle in your...read more
  3. What is the complete process for documentation and obtaining all original certi...read more

Tell us how to improve this page.

L&T Construction Assistant Construction Manager Interview Process for Experienced

based on 7 interviews

2 Interview rounds

  • Resume Shortlist Round
  • Technical Round
View more

Interview Questions from Similar Companies

Dilip Buildcon Interview Questions
4.0
 • 148 Interviews
G R Infraprojects Interview Questions
4.1
 • 137 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 66 Interviews
View all
L&T Construction Assistant Construction Manager Salary
based on 491 salaries
₹5.4 L/yr - ₹17 L/yr
At par with the average Assistant Construction Manager Salary in India
View more details

L&T Construction Assistant Construction Manager Reviews and Ratings

based on 179 reviews

3.9/5

Rating in categories

3.9

Skill development

2.8

Work-life balance

3.8

Salary

4.3

Job security

3.3

Company culture

3.1

Promotions

3.3

Work satisfaction

Explore 179 Reviews and Ratings
Assistant Manager
1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
703 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
491 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Civil Site Engineer
469 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
327 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Larsen & Toubro Limited

3.9
Compare

Dilip Buildcon

4.0
Compare

Simplex Infrastructures

3.4
Compare

Power Mech Projects

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview