The density of flyash blocks varies depending on the manufacturing process and composition.
Flyash blocks can have a density ranging from 600 kg/m3 to 1600 kg/m3.
The density is influenced by factors such as the amount of fly ash, cement, and water used in the mix.
Higher density blocks are typically stronger and more durable.
Density can be measured using a variety of methods, including water displacement and weighing.
It ...
Concrete cubes are cast by filling a cube-shaped mold with freshly mixed concrete and allowing it to cure.
Prepare the mold by cleaning and oiling it to prevent sticking.
Mix the concrete according to the desired strength and consistency.
Fill the mold with the concrete, making sure to compact it well and eliminate any air pockets.
Smooth the surface of the concrete and cover the mold with a plastic sheet to prevent moistu...
I prioritize safety by implementing strict protocols, conducting regular inspections, and providing proper training to workers.
Establish and enforce safety protocols and guidelines
Conduct regular safety inspections and audits
Provide proper training and education to workers on safety procedures
Encourage workers to report any safety concerns or hazards
Investigate and address any safety incidents or accidents promptly
Stay...
The productivity of a carpenter depends on various factors such as experience, skill level, tools used, and complexity of the project.
The productivity of a carpenter can be measured in terms of the amount of work completed in a given time frame.
Factors that affect productivity include the carpenter's experience and skill level, the tools and equipment used, and the complexity of the project.
For example, a highly skille...
Crank in slab is added to prevent cracking due to temperature and shrinkage.
Crank is added to slabs at intervals of 1.5 to 2 meters.
The amount of crank depends on the thickness of the slab and the expected temperature changes.
For a 150mm thick slab, 0.15% of steel is added as crank.
For a 200mm thick slab, 0.12% of steel is added as crank.
Crank bars are usually 6mm to 10mm in diameter.
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
posted on 21 Mar 2023
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 30 Nov 2023
I was interviewed before Nov 2022.
I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
posted on 30 May 2022
I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.
The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.
Ensuring safety measures are in place at the worksite
Conducting safety inspections to identify potential hazards
Providing safety training to workers and management
Maintaining records of safety inspections and incidents
Ensuring compliance with safe...
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
I have worked on INDAS 115 and INDAS 116 in my previous role as a financial analyst.
Implemented INDAS 115 to recognize revenue from contracts with customers
Applied INDAS 116 to account for leases in financial statements
Ensured compliance with INDAS standards in financial reporting
Prepared financial statements following the guidelines of INDAS
I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.
based on 5 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
705
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
503
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
391
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineering Manager
322
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA