Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Assistant Civil Engineering Manager Interview Questions, Process, and Tips

Updated 30 Sep 2022

L&T Construction Assistant Civil Engineering Manager Interview Experiences

1 interview found

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is the denisty of flyash blocks
  • Ans. 

    The density of flyash blocks varies depending on the manufacturing process and composition.

    • Flyash blocks can have a density ranging from 600 kg/m3 to 1600 kg/m3.

    • The density is influenced by factors such as the amount of fly ash, cement, and water used in the mix.

    • Higher density blocks are typically stronger and more durable.

    • Density can be measured using a variety of methods, including water displacement and weighing.

    • It ...

  • Answered by AI
  • Q2. How do you cast concrete cubes
  • Ans. 

    Concrete cubes are cast by filling a cube-shaped mold with freshly mixed concrete and allowing it to cure.

    • Prepare the mold by cleaning and oiling it to prevent sticking.

    • Mix the concrete according to the desired strength and consistency.

    • Fill the mold with the concrete, making sure to compact it well and eliminate any air pockets.

    • Smooth the surface of the concrete and cover the mold with a plastic sheet to prevent moistu...

  • Answered by AI
  • Q3. How do deal with safety issues at site
  • Ans. 

    I prioritize safety by implementing strict protocols, conducting regular inspections, and providing proper training to workers.

    • Establish and enforce safety protocols and guidelines

    • Conduct regular safety inspections and audits

    • Provide proper training and education to workers on safety procedures

    • Encourage workers to report any safety concerns or hazards

    • Investigate and address any safety incidents or accidents promptly

    • Stay...

  • Answered by AI
  • Q4. What is the productivity of a Carpenter
  • Ans. 

    The productivity of a carpenter depends on various factors such as experience, skill level, tools used, and complexity of the project.

    • The productivity of a carpenter can be measured in terms of the amount of work completed in a given time frame.

    • Factors that affect productivity include the carpenter's experience and skill level, the tools and equipment used, and the complexity of the project.

    • For example, a highly skille...

  • Answered by AI
  • Q5. How much do you add for crank in slab
  • Ans. 

    Crank in slab is added to prevent cracking due to temperature and shrinkage.

    • Crank is added to slabs at intervals of 1.5 to 2 meters.

    • The amount of crank depends on the thickness of the slab and the expected temperature changes.

    • For a 150mm thick slab, 0.15% of steel is added as crank.

    • For a 200mm thick slab, 0.12% of steel is added as crank.

    • Crank bars are usually 6mm to 10mm in diameter.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please do not loose your confidence while negotiating the terms, you have to be in your comfort zone about salary.Once you accept the offer there is no complaining about less pay and more work, so negotiate the terms you are comfortable with.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Based on experience and problem faced in project site
  • Q2. Previous site experience and the benifits
  • Q3. Roles and responsibilities of self and the factors affecting company growth

Interview Preparation Tips

Interview preparation tips for other job seekers - don't join in this black hole it is just like company there are no projects for this company the culture is so worst.

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Details about your self.
Round 3 - Technical 

(1 Question)

  • Q1. Question from subject.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills

I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the roles and responsibilities of safety person as per the BOCW act
  • Ans. 

    The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.

    • Ensuring safety measures are in place at the worksite

    • Conducting safety inspections to identify potential hazards

    • Providing safety training to workers and management

    • Maintaining records of safety inspections and incidents

    • Ensuring compliance with safe...

  • Answered by AI
  • Q2. What are the roles and responsibilities of you in your current organization
Round 2 - HR 

(1 Question)

  • Q1. Salary expectation and other facilities required.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good organization feeling positive toward the company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. What are the INDAS, you have worked on??
  • Ans. 

    I have worked on INDAS 115 and INDAS 116 in my previous role as a financial analyst.

    • Implemented INDAS 115 to recognize revenue from contracts with customers

    • Applied INDAS 116 to account for leases in financial statements

    • Ensured compliance with INDAS standards in financial reporting

    • Prepared financial statements following the guidelines of INDAS

  • Answered by AI
  • Q2. Indas -101,109 112
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question about your current work and technical question of what they want in me
Round 2 - Technical 

(1 Question)

  • Q1. Case study like what action you take in this particular problem
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and document sharing

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Assistant Civil Engineering Manager interview?
L&T Construction interview process usually has 2 rounds. The most common rounds in the L&T Construction interview process are Resume Shortlist and Technical.
What are the top questions asked in L&T Construction Assistant Civil Engineering Manager interview?

Some of the top questions asked at the L&T Construction Assistant Civil Engineering Manager interview -

  1. How do deal with safety issues at s...read more
  2. what is the productivity of a Carpen...read more
  3. How much do you add for crank in s...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 431 Interviews
Dilip Buildcon Interview Questions
4.0
 • 141 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
L&T Construction Assistant Civil Engineering Manager Salary
based on 5 salaries
₹6 L/yr - ₹10 L/yr
6% more than the average Assistant Civil Engineering Manager Salary in India
View more details

L&T Construction Assistant Civil Engineering Manager Reviews and Ratings

based on 5 reviews

4.3/5

Rating in categories

4.1

Skill development

4.1

Work-life balance

4.3

Salary

4.5

Job security

4.1

Company culture

4.1

Promotions

4.1

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
391 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview