Filter interviews by
Be the first one to contribute and help others!
I applied via Referral and was interviewed in Aug 2022. There were 3 interview rounds.
Aluminium formwork is a construction technique that uses lightweight aluminium panels to form concrete walls, floors, and columns.
Aluminium formwork is a modern construction technique that is faster and more efficient than traditional formwork methods.
It involves using lightweight aluminium panels that are easy to handle and can be reused multiple times.
The panels are assembled on site to form the desired shape and siz...
Waterproofing procedure involves applying a waterproof barrier to prevent water from penetrating a building structure.
Identify the areas that need waterproofing such as roofs, walls, and foundations.
Choose the appropriate waterproofing material based on the type of structure and the level of water exposure.
Prepare the surface by cleaning and repairing any cracks or damage.
Apply the waterproofing material using the reco...
Steel Fibre Road Concrete is a type of concrete that contains steel fibres to improve its strength and durability.
Steel fibres are added to the concrete mix to enhance its mechanical properties.
The fibres act as reinforcement and help to prevent cracking and improve resistance to wear and tear.
Steel Fibre Road Concrete is commonly used in the construction of roads, bridges, and other infrastructure projects.
It is also ...
I have experience in piling works including design, installation, and testing of piles.
Designed pile foundations for various structures including bridges and buildings
Installed piles using various methods such as driven piles and drilled shafts
Conducted pile load tests to ensure the capacity of the piles
Managed and supervised piling works on construction sites
Ensured compliance with safety regulations and quality stand
Concrete technology is crucial for site activity as it involves the proper mixing, placing, and curing of concrete.
Understanding the properties of concrete and how it reacts to different conditions
Proper mixing of concrete ingredients to achieve the desired strength and consistency
Ensuring proper placement and compaction of concrete to avoid voids and weak spots
Proper curing of concrete to achieve maximum strength and ...
I applied via Campus Placement
Ansoff Matrix is a strategic planning tool that helps businesses decide their growth strategy by analyzing market penetration, market development, product development, and diversification.
Ansoff Matrix was developed by Igor Ansoff in 1957.
It consists of four growth strategies: market penetration, market development, product development, and diversification.
Market penetration involves selling more of the existing produc...
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
A vs b abstract. I was told that I would be evaluated based on communication and articulation skills
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
I appeared for an interview before Jan 2021.
Low tension cables rated for 440V are commonly used for power distribution in residential and commercial buildings.
Low tension cables are typically rated for voltages up to 1000V.
These cables are commonly used for power distribution in buildings.
Examples of low tension cables include PVC insulated cables and XLPE insulated cables.
Shear force and bending moment are key concepts in structural engineering, representing internal forces in a beam.
Shear force is the force perpendicular to the beam's longitudinal axis, causing it to shear or slide.
Bending moment is the internal moment that causes a beam to bend or flex.
Shear force and bending moment diagrams are used to visualize the distribution of these forces along the length of a beam.
Calculating ...
posted on 23 Oct 2024
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Project flow chart outlines the steps from project initiation to completion and handover.
Initiation: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, including timelines, resources, and budget.
Execution: Implement the project plan, monitor progress, and manage any issues.
Monitoring and Controlling: Track project performance, make adjustments as needed.
Closing: Finalize all pr...
I rate my knowledge on MEP as advanced.
I have extensive experience managing MEP projects in various industries.
I am familiar with MEP systems and their integration within construction projects.
I have successfully coordinated with MEP subcontractors to ensure project success.
I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.
Project Engineer
137
salaries
| ₹2.6 L/yr - ₹8.1 L/yr |
Assistant Project Manager
123
salaries
| ₹5.2 L/yr - ₹12.2 L/yr |
Project Manager
102
salaries
| ₹7 L/yr - ₹18.8 L/yr |
Assistant Facility Manager
94
salaries
| ₹2.9 L/yr - ₹7.2 L/yr |
Senior Project Engineer
85
salaries
| ₹4.1 L/yr - ₹9.5 L/yr |
CBRE
M3M India
R.S. Infraprojects
My Home Constructions