KAILASHDEV INFRASTRUCTURE Civil Design Engineer Interview Questions and Answers

Updated 27 Feb 2022

KAILASHDEV INFRASTRUCTURE Civil Design Engineer Interview Experiences

1 interview found

I applied via Approached by Company and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Calculation of mortar quantity
  • Ans. 

    Calculation of mortar quantity

    • Mortar quantity is calculated based on the volume of bricks or blocks being used.

    • The ratio of cement, sand, and water in the mortar mix is also important.

    • The standard ratio for mortar mix is 1:4 (cement:sand).

    • The water-cement ratio should be around 0.5.

    • The quantity of mortar required can be calculated using the formula: Volume of bricks/blocks x 0.0015.

    • This formula assumes a mortar joint t

  • Answered by AI
  • Q2. Steel quantity calculation
Round 2 - Technical 

(2 Questions)

  • Q1. Performing in software technical skills
  • Q2. Software tests on which are mentioned in resume
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical questions on core subjects

Interview Preparation Tips

Interview preparation tips for other job seekers - Have a full-fledged knowledge on basics about core subjects

Interview questions from similar companies

I applied via Walk-in and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Questions based on work experience
Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiation was done

Interview Preparation Tips

Interview preparation tips for other job seekers - Say whatever you know confidently. They ask you from your genre
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What interests you about Civil Lines?
  • Ans. 

    I am fascinated by the impact Civil Lines have on urban development and infrastructure.

    • The opportunity to contribute to the design and construction of roads, bridges, and buildings

    • The challenge of ensuring safety and efficiency in infrastructure projects

    • The chance to work on projects that improve the quality of life for communities

    • The satisfaction of seeing tangible results of your work, such as a new bridge connecting

  • Answered by AI
  • Q2. What factors influenced your decision to choose our company?
  • Ans. 

    I was impressed by your company's reputation for innovative projects and commitment to sustainability.

    • Reputation for innovative projects

    • Commitment to sustainability

    • Positive reviews from current employees

    • Company's values align with my own

    • Opportunities for professional growth and development

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Ratio of m25 concrete
  • Ans. 

    The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)

    • The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • This ratio is commonly used in construction for medium strength concrete.

    • For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.

  • Answered by AI
  • Q2. Per cum brick qty.
Round 2 - Technical 

(2 Questions)

  • Q1. What is your responsibility previous company name
  • Ans. 

    As an Assistant Engineer - Civil at my previous company, my responsibilities included assisting senior engineers in project planning, design, and construction.

    • Assisted senior engineers in project planning and design

    • Participated in site visits and inspections

    • Prepared project reports and documentation

    • Collaborated with team members and contractors

    • Ensured compliance with safety regulations and quality standards

  • Answered by AI
  • Q2. What is your responsibility previous company site Role.
  • Ans. 

    Managed site operations, coordinated with contractors, ensured compliance with safety regulations.

    • Managed day-to-day site operations

    • Coordinated with contractors for timely completion of projects

    • Ensured compliance with safety regulations and quality standards

    • Prepared progress reports and communicated with stakeholders

    • Implemented cost-saving measures without compromising quality

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Name of the client
  • Ans. 

    The name of the client is XYZ Construction Company.

    • XYZ Construction Company is a well-known construction firm in the region.

    • They have completed several projects in the past, including the construction of a new office building in downtown.

    • The client has a reputation for high-quality work and timely project completion.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. About your self
  • Q2. What is the difference between Fixed and Pinned connection in base plate?
  • Ans. 

    Fixed connection does not allow rotation at the base plate, while pinned connection allows rotation.

    • Fixed connection is rigid and does not allow rotation at the base plate.

    • Pinned connection allows rotation at the base plate.

    • Fixed connection provides more stability and resistance to lateral forces.

    • Pinned connection is more flexible and allows for some movement.

    • Examples: Fixed connection is commonly used in high-rise bui...

  • Answered by AI
  • Q3. What is the rise and trade in stair?
  • Ans. 

    The rise is the vertical distance between two consecutive steps, while the tread is the horizontal distance.

    • The rise is typically around 7-8 inches, while the tread is usually around 10-11 inches.

    • The rise and tread dimensions are important for ensuring safe and comfortable stair design.

    • Building codes often dictate the minimum and maximum rise and tread dimensions for safety reasons.

  • Answered by AI
  • Q4. What is the pitch distance in bolt?
  • Ans. 

    Pitch distance in bolt refers to the distance between the centers of adjacent bolts in a bolted connection.

    • Pitch distance is typically measured from the center of one bolt to the center of the next bolt in a row.

    • It is important to maintain consistent pitch distances to ensure proper load distribution and structural integrity.

    • For example, in a bolted connection with a pitch distance of 2 inches, the centers of adjacent

  • Answered by AI
  • Q5. Make pipe rack section on both direction
  • Ans. 

    To create a pipe rack section on both directions.

    • Identify the location and dimensions for the pipe rack section

    • Consider the load requirements and support structures

    • Design the pipe rack section using appropriate materials and connections

    • Ensure proper spacing and alignment for pipes in both directions

  • Answered by AI
  • Q6. Make equipment foundation, Pump Foundation
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

SOLAR ENERGY RELETED CIVIL CONSTRUCTION DISCUSSION

Round 2 - Technical 

(2 Questions)

  • Q1. Work process, work ability, and all releted civil function.
  • Q2. System of solar
  • Ans. 

    Solar system refers to the collection of planets and other objects that orbit around a star, typically referring to our own solar system with the Sun at its center.

    • The solar system consists of the Sun, eight planets, moons, asteroids, comets, and other celestial bodies.

    • The planets in our solar system are Mercury, Venus, Earth, Mars, Jupiter, Saturn, Uranus, and Neptune.

    • The Sun is the central star of our solar system, p...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Construction answer
  • Q2. Correct Answer
  • Q3. Rcc work, shuttering, Excavation
  • Q4. Safety work, Quality work
  • Q5. Labour Mobilizacttion

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good trips
Facilities very nice
Travelling, food facilities very good
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Aptitude Test 

It is very difficult test to pass

Round 2 - Technical 

(1 Question)

  • Q1. Technical interview of concrete

Interview Preparation Tips

Interview preparation tips for other job seekers - Kindly go through the technical subjects before attending interview

I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What is hydration process during casting of concrete?
  • Ans. 

    Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.

    • Hydration process starts as soon as water is added to cement.

    • The reaction produces heat and causes the mixture to harden and gain strength.

    • The process continues for weeks and even months, resulting in a stronger and more durable concrete.

    • The amount of water used in the mixture affects the hydration process and...

  • Answered by AI
  • Q2. Concrete strength depend ?
  • Ans. 

    Concrete strength depends on various factors.

    • Water-cement ratio

    • Type and quality of cement

    • Aggregate size and shape

    • Curing conditions

    • Mix design

    • Age of concrete

    • Temperature and humidity

    • Presence of admixtures

  • Answered by AI
  • Q3. Why used send in concrete mixer
  • Ans. 

    Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.

    • Water is added to hydrate the cement and activate the chemical reaction that causes it to harden

    • The amount of water added affects the strength and durability of the concrete

    • Too much water can weaken the concrete and cause cracking

    • The water should be added gradually and mixed thoroughly to ensure even distribution

    • Ot...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for AECOM Assistant Engineer - Civil interview:
  • Environmental effect on concrete
Interview preparation tips for other job seekers - Please increase knowledge inhance of fresher and experienced

KAILASHDEV INFRASTRUCTURE Interview FAQs

How many rounds are there in KAILASHDEV INFRASTRUCTURE Civil Design Engineer interview?
KAILASHDEV INFRASTRUCTURE interview process usually has 3 rounds. The most common rounds in the KAILASHDEV INFRASTRUCTURE interview process are One-on-one Round and Technical.
What are the top questions asked in KAILASHDEV INFRASTRUCTURE Civil Design Engineer interview?

Some of the top questions asked at the KAILASHDEV INFRASTRUCTURE Civil Design Engineer interview -

  1. Calculation of mortar quant...read more
  2. Software tests on which are mentioned in res...read more
  3. Performing in software technical ski...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 397 Interviews
Tata Technologies Interview Questions
3.7
 • 247 Interviews
TCE Interview Questions
3.8
 • 239 Interviews
Saint-Gobain Interview Questions
4.0
 • 169 Interviews
View all
Civil Site Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹3 L/yr

Site Engineer
4 salaries
unlock blur

₹3 L/yr - ₹3.4 L/yr

Senior Executive
3 salaries
unlock blur

₹4.2 L/yr - ₹5.5 L/yr

Senior Site Engineer
3 salaries
unlock blur

₹3.8 L/yr - ₹4 L/yr

Explore more salaries
Compare KAILASHDEV INFRASTRUCTURE with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare