Filter interviews by
I applied via Approached by Company and was interviewed before Feb 2021. There were 3 interview rounds.
Calculation of mortar quantity
Mortar quantity is calculated based on the volume of bricks or blocks being used.
The ratio of cement, sand, and water in the mortar mix is also important.
The standard ratio for mortar mix is 1:4 (cement:sand).
The water-cement ratio should be around 0.5.
The quantity of mortar required can be calculated using the formula: Volume of bricks/blocks x 0.0015.
This formula assumes a mortar joint t
To find out the steel weight, calculate the volume of steel and multiply it by the density of steel.
Calculate the volume of steel by multiplying the length, width, and height of the steel member.
Determine the density of steel, which is typically around 7850 kg/m^3.
Multiply the volume of steel by the density to get the weight of steel.
The density of cement varies depending on the type of cement being used.
The density of ordinary Portland cement is around 1440 kg/m³
The density of white cement is around 2300 kg/m³
The density of rapid hardening cement is around 1250 kg/m³
The density of low heat cement is around 1400 kg/m³
Top trending discussions
posted on 5 Feb 2021
ETS (Educational Testing Service) is a non-profit organization that develops and administers standardized tests.
ETS develops and administers tests like the GRE, TOEFL, and Praxis exams.
The organization also offers research and assessment services for educational institutions.
ETS uses computer-based testing and scoring for many of its exams.
The organization has faced criticism for its role in the standardized testing in
Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.
Allows users to create and edit spreadsheets online
Offers collaboration features for real-time editing and commenting
Can import and export various file formats, including Microsoft Excel
Offers add-ons and scripts for automation and customization
Accessible from any device with internet connection
MDD & OMC are important parameters for soil compaction and moisture content.
MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.
OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.
These parameters are important for determining the appropriate moisture content and compaction effort for...
The velocity of steel varies depending on the type and conditions.
The velocity of steel can range from 5000 to 6000 meters per second
The velocity of steel can be affected by factors such as temperature and pressure
The velocity of steel is important in industries such as construction and manufacturing
The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.
The cube test can refer to various tests in different fields such as construction, engineering, and materials science.
For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.
The result of the cube test can vary depending on factors such as the ty...
posted on 20 Dec 2020
I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.
The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.
DBM stands for Dense Bituminous Macadam, which is a type of road construction material.
The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.
The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.
Higher percentages of bitumen a...
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
It was just a aptitude test
Managed a team to implement a new customer relationship management system
Led a team of 5 employees to successfully implement a new CRM system
Coordinated with IT department to ensure smooth integration of the system
Provided training to staff on how to use the new system effectively
I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.
Strong reputation in the industry
Opportunities for career growth and development
Alignment with my career goals and values
I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.
I received a video call link and in that link will get the accounting basic questions for that we have to answer after a beep.
posted on 16 Nov 2021
I applied via Campus Placement and was interviewed before Nov 2020. There were 3 interview rounds.
based on 2 reviews
Rating in categories
Civil Site Engineer
6
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Site Engineer
4
salaries
| ₹3 L/yr - ₹3.4 L/yr |
Senior Executive
3
salaries
| ₹4.2 L/yr - ₹5.5 L/yr |
Senior Site Engineer
3
salaries
| ₹3.8 L/yr - ₹4 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies