Upload Button Icon Add office photos

Filter interviews by

KAILASHDEV INFRASTRUCTURE Interview Questions and Answers

Updated 20 Sep 2022

KAILASHDEV INFRASTRUCTURE Interview Experiences

Popular Designations

2 interviews found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Q .1:- How find out the steel weight?
  • Ans. 

    To find out the steel weight, calculate the volume of steel and multiply it by the density of steel.

    • Calculate the volume of steel by multiplying the length, width, and height of the steel member.

    • Determine the density of steel, which is typically around 7850 kg/m^3.

    • Multiply the volume of steel by the density to get the weight of steel.

  • Answered by AI
  • Q2. Q.3:-What is the density of cement?
  • Ans. 

    The density of cement varies depending on the type of cement being used.

    • The density of ordinary Portland cement is around 1440 kg/m³

    • The density of white cement is around 2300 kg/m³

    • The density of rapid hardening cement is around 1250 kg/m³

    • The density of low heat cement is around 1400 kg/m³

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is to know your experience And how good can you be?

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

I applied via Approached by Company and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Calculation of mortar quantity
  • Ans. 

    Calculation of mortar quantity

    • Mortar quantity is calculated based on the volume of bricks or blocks being used.

    • The ratio of cement, sand, and water in the mortar mix is also important.

    • The standard ratio for mortar mix is 1:4 (cement:sand).

    • The water-cement ratio should be around 0.5.

    • The quantity of mortar required can be calculated using the formula: Volume of bricks/blocks x 0.0015.

    • This formula assumes a mortar joint t

  • Answered by AI
  • Q2. Steel quantity calculation
Round 2 - Technical 

(2 Questions)

  • Q1. Performing in software technical skills
  • Q2. Software tests on which are mentioned in resume
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical questions on core subjects

Interview Preparation Tips

Interview preparation tips for other job seekers - Have a full-fledged knowledge on basics about core subjects

Civil Design Engineer Interview Questions asked at other Companies

Q1. Why are use the F1 ,F2 ,F3 in AutoCAD ?
View answer (1)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What about last company working
  • Ans. 

    I worked at a software development company specializing in cloud solutions.

    • Developed and maintained cloud-based applications

    • Collaborated with cross-functional teams to troubleshoot and resolve technical issues

    • Participated in regular code reviews and testing processes

  • Answered by AI
  • Q2. How much experience you have in IT.
  • Ans. 

    I have 5 years of experience in IT, specializing in network infrastructure and system administration.

    • 5 years of experience in IT

    • Specializing in network infrastructure and system administration

    • Certifications in Cisco CCNA and Microsoft MCSA

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why you are looking for job in IRB
  • Ans. 

    I am looking for a job in IRB because of the company's reputation for innovation and growth opportunities.

    • Interested in working for a company known for innovation

    • Seeking growth opportunities within the organization

    • Impressed by IRB's reputation in the industry

  • Answered by AI
  • Q2. How much salary do you want in IRB.
  • Ans. 

    I am looking for a competitive salary that reflects my skills and experience in the industry.

    • Research the average salary range for System Engineers in the industry and location

    • Consider your level of experience, certifications, and skills when determining your salary expectations

    • Be prepared to negotiate based on the benefits package offered by the company

    • Provide a salary range rather than a specific number to allow for

  • Answered by AI

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Details about your self.
Round 3 - Technical 

(1 Question)

  • Q1. Question from subject.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills

KAILASHDEV INFRASTRUCTURE Interview FAQs

How many rounds are there in KAILASHDEV INFRASTRUCTURE interview?
KAILASHDEV INFRASTRUCTURE interview process usually has 2-3 rounds. The most common rounds in the KAILASHDEV INFRASTRUCTURE interview process are One-on-one Round, Technical and Resume Shortlist.
How to prepare for KAILASHDEV INFRASTRUCTURE interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KAILASHDEV INFRASTRUCTURE. The most common topics and skills that interviewers at KAILASHDEV INFRASTRUCTURE expect are Civil Engineering, Software Configuration Management, Supervision, AutoCAD and Construction.
What are the top questions asked in KAILASHDEV INFRASTRUCTURE interview?

Some of the top questions asked at the KAILASHDEV INFRASTRUCTURE interview -

  1. Q .1:- How find out the steel weig...read more
  2. Q.3:-What is the density of ceme...read more
  3. Calculation of mortar quant...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

KAILASHDEV INFRASTRUCTURE Reviews and Ratings

based on 2 reviews

1.0/5

Rating in categories

1.5

Skill development

1.0

Work-life balance

1.0

Salary

1.0

Job security

1.0

Company culture

1.0

Promotions

1.0

Work satisfaction

Explore 2 Reviews and Ratings
Civil Site Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Site Engineer
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare KAILASHDEV INFRASTRUCTURE with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.0
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview