K Raheja Constructions Senior Project Engineer Civil Interview Questions and Answers

Updated 18 Aug 2024

K Raheja Constructions Senior Project Engineer Civil Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. About the relevent experience
  • Q2. Why you are leaving the current company
  • Ans. 

    Seeking new challenges and opportunities for growth

    • Desire for career advancement

    • Looking for new challenges and projects

    • Opportunity for professional development

    • Seeking better work-life balance

    • Company restructuring or changes in management

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Execution,Qt Estimation,Standard Procedures of different work,Qs
Round 3 - HR 

(1 Question)

  • Q1. Selection and documentation

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are attending the interview be prepared for which post you are attending the interview, understand properly the JD for which you are attending the interview. Be confident on experience you have. Study the SOP's. Be polite with your interviewer. No negative comments on your previous employer.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. How to grow up to other company
  • Ans. 

    To grow your career and transition to another company, focus on networking, gaining new skills, updating your resume, and preparing for interviews.

    • Network with professionals in your industry to learn about job opportunities

    • Attend industry events, conferences, and workshops to expand your knowledge and skills

    • Update your resume with your latest projects, achievements, and certifications

    • Practice for interviews by research...

  • Answered by AI
  • Q2. How will do interview with another company
  • Q3. I want to know everything is new company
  • Q4. I want to know new company wor management and had office staff
  • Q5. I want know my new company work location

Interview Preparation Tips

Interview preparation tips for other job seekers - Time management it very important with manpower and machine
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Minium diameter of bar used in column
  • Ans. 

    Minimum diameter of bar used in column is determined by structural requirements and load calculations.

    • Minimum diameter is typically specified in the structural design drawings or calculations

    • Factors such as column height, load capacity, and seismic considerations influence the minimum bar diameter

    • Common minimum diameters for column bars range from 12mm to 25mm depending on the structural requirements

  • Answered by AI
  • Q2. Minium grade of concrete used in column
  • Ans. 

    Minimum grade of concrete used in column is typically M20.

    • Minimum grade of concrete used in column is usually M20

    • Higher grades like M25, M30, M35, etc. can also be used for columns based on structural requirements

    • The grade of concrete is determined based on the strength required for the structure

  • Answered by AI
  • Q3. Minium thickness of slab
  • Ans. 

    Minimum thickness of slab is determined based on factors like load, span, and material used.

    • Minimum thickness of slab is typically determined by structural engineers based on the expected loads and span of the slab.

    • Factors such as the material used for the slab and any additional reinforcement also play a role in determining the minimum thickness.

    • For example, a residential slab may have a minimum thickness of 4 inches,...

  • Answered by AI
  • Q4. What is water cement ratio
  • Ans. 

    Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • Water cement ratio is a crucial factor in determining the strength and durability of concrete.

    • A lower water cement ratio results in stronger and more durable concrete.

    • The ideal water cement ratio varies depending on the type of concrete mix and its intended use.

    • For example, a typical water cement ratio for general purp

  • Answered by AI
  • Q5. Density of steel
  • Ans. 

    The density of steel is approximately 7.85 g/cm^3.

    • The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).

    • The density of steel can vary slightly depending on the specific alloy and composition.

    • For example, the density of stainless steel is around 7.9 g/cm^3, while carbon steel is around 7.85 g/cm^3.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hr techanical question asked
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Role of engineer to control disaster management

Round 2 - HR 

(1 Question)

  • Q1. Normal qurstions
Round 3 - Technical 

(1 Question)

  • Q1. About technical skills
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What's the relation concrete grade with development lenth
  • Ans. 

    Concrete grade directly affects the development length of reinforcement bars in a structure.

    • Higher concrete grades typically require longer development lengths for reinforcement bars to achieve the desired bond strength.

    • Lower concrete grades may allow for shorter development lengths, but may compromise the overall strength and durability of the structure.

    • Development length is influenced by factors such as bar diameter,...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Slump cone top diameter ?
  • Ans. 

    The top diameter of a slump cone is typically 4 inches.

    • The top diameter of a slump cone is usually 4 inches.

    • The slump cone is used to measure the consistency of fresh concrete.

    • The top diameter of the slump cone affects the flow of the concrete mix.

    • A larger top diameter will result in a higher slump value.

  • Answered by AI
  • Q2. Full from of TMT ?
  • Ans. 

    Thermo-Mechanically Treated

    • TMT stands for Thermo-Mechanically Treated

    • TMT bars are commonly used in construction for reinforcement

    • The process involves heating the steel bars and then rapidly cooling them to increase their strength

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Site planning , binding work ,
  • Q2. Drawing work auto CAD
  • Q3. Billing engineer, work s
  • Q4. Salary Client al

Interview Preparation Tips

Topics to prepare for L & W Constructions Civil Site Engineer interview:
  • Civil Engineering
Interview preparation tips for other job seekers - Site engineer
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. I am fresher and 3 month job in Maharashtra civil site engineer engineer on duty and I am a final year student
Round 2 - Material related 

(4 Questions)

  • Q1. Concrete material
  • Q2. Type of material
  • Ans. 

    Civil engineers work with a variety of materials including concrete, steel, asphalt, and wood.

    • Common materials used in civil engineering include concrete, steel, asphalt, wood, and aggregates.

    • Concrete is used for foundations, roads, and structures.

    • Steel is used for beams, columns, and reinforcement.

    • Asphalt is used for roads and pavements.

    • Wood is used for formwork, bridges, and buildings.

    • Aggregates are used in concrete

  • Answered by AI
  • Q3. Material distribution
  • Q4. Normal material

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Surveying and concrete technology
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Procedure of laying tile and granite
  • Ans. 

    The procedure of laying tile and granite involves preparing the surface, applying adhesive, laying the tiles/granite, grouting, and sealing.

    • Prepare the surface by ensuring it is clean, level, and dry.

    • Apply adhesive to the surface using a trowel, ensuring even coverage.

    • Lay the tiles/granite starting from the center and working outwards in a pattern.

    • Grout the tiles/granite by filling the gaps between them with grout and ...

  • Answered by AI

K Raheja Constructions Interview FAQs

How many rounds are there in K Raheja Constructions Senior Project Engineer Civil interview?
K Raheja Constructions interview process usually has 3 rounds. The most common rounds in the K Raheja Constructions interview process are HR and Technical.
What are the top questions asked in K Raheja Constructions Senior Project Engineer Civil interview?

Some of the top questions asked at the K Raheja Constructions Senior Project Engineer Civil interview -

  1. Execution,Qt Estimation,Standard Procedures of different work...read more
  2. Selection and documentat...read more

Tell us how to improve this page.

K Raheja Constructions Senior Project Engineer Civil Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 124 Interviews
DLF Interview Questions
4.0
 • 73 Interviews
Tractebel Interview Questions
4.0
 • 41 Interviews
View all
Horticulturist
7 salaries
unlock blur

₹7 L/yr - ₹10 L/yr

Security Supervisor
7 salaries
unlock blur

₹3.6 L/yr - ₹4.8 L/yr

Security Officer
7 salaries
unlock blur

₹3.5 L/yr - ₹5 L/yr

Executive Assistant
5 salaries
unlock blur

₹10 L/yr - ₹12 L/yr

Senior MIS Manager
4 salaries
unlock blur

₹10.4 L/yr - ₹16 L/yr

Explore more salaries
Compare K Raheja Constructions with

Godrej Properties

3.7
Compare

DLF

4.0
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview