  • Q1. How u fixed bolt?
  • Ans. 

    Bolts are fixed by inserting them into pre-drilled holes and tightening them with a wrench.

    • Insert bolt into pre-drilled hole

    • Tighten bolt with a wrench

    • Ensure proper torque is applied

    • Use lock washers or thread-locking compound if necessary

  • Answered by AI
  • Q2. How you cheack column shuttering?
  • Ans. 

    To check column shuttering, inspect the alignment, verticality, and stability of the formwork.

    • Inspect the alignment of the column formwork with respect to the reference lines or grids.

    • Check the verticality of the formwork using a plumb bob or spirit level.

    • Ensure the stability of the shuttering by checking for any loose or damaged components.

    • Verify that the formwork is adequately braced to resist the concrete pressure.

    • I...

  • Answered by AI
  • Q3. What is your roal in side?
  • Ans. 

    My role as a Civil Supervisor is to oversee construction projects and ensure they are completed on time, within budget, and meet quality standards.

    • Supervising and coordinating construction activities

    • Ensuring compliance with safety regulations and building codes

    • Managing project timelines and budgets

    • Communicating with contractors, engineers, and other stakeholders

    • Inspecting work sites and resolving any issues that arise

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Possetvly Go for interview

Interview Questionnaire 

4 Questions

  • Q1. Construction work
  • Q2. Building work
  • Q3. Road wprk
  • Q4. Industrial

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview

Civil Supervisor Interview Questions Asked at Other Companies

Q1. 1=Derivation of D²/162. 2=nominal mix 3=design mix 4=per tonne bi ... read more
Q2. How to find out bbs , rebar weight find out & scrap %
Q3. What are the most important aspects of quality and safety through ... read more
asked in Tata Group
Q4. do all your measurements will be correct ?
Q5. How can manege workplace culture and abeying the lows of that are ... read more

Interview questions from similar companies

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Basic introduction and work related questions
  • Q2. Working company and experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Company is good salary on time work life is balanced and not unnecessary problem.

I applied via AmbitionBox and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Tell me about yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Site pr achee se ka krna or control vestige

I applied via Company Website and was interviewed before Sep 2019. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Civil work the transmission line of foundation
  • Ans. 

    The foundation of transmission line is an important civil work.

    • The foundation of transmission line should be strong enough to support the weight of the tower and the conductors.

    • The foundation should be designed based on the soil type and load-bearing capacity.

    • The foundation should be constructed with high-quality materials and proper reinforcement.

    • Regular inspection and maintenance of the foundation is necessary to ens

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil work and Genaral knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself?
Round 2 - Technical 

(1 Question)

  • Q1. Current job responsibilities?
Round 3 - Final decision for acceptance 

(1 Question)

  • Q1. Is the job is suitable for you or not?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and passionate
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. How much qty. of water in pipeline Sizes ...?
  • Q2. Density of soil
Round 2 - One-on-one 

(2 Questions)

  • Q1. Risk management
  • Q2. Learning skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Join with Good salary Only
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about your experience
  • Q2. What is initial setting time of concrete?
  • Ans. 

    Initial setting time of concrete is the time taken for the concrete to change from a plastic to a solid state.

    • Initial setting time is typically around 30 minutes to 1.5 hours, depending on the mix design and environmental conditions.

    • It is important to monitor the initial setting time to ensure proper placement and finishing of the concrete.

    • Factors affecting initial setting time include temperature, water-cement ratio, ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be confident
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Metro project Bumbai
  • Q2. Metro project Bumbai j.kumar
  • Q3. J.kumar metro project
  • Ans. 

    J.kumar metro project is a major infrastructure project involving construction of metro rail system.

    • J.kumar metro project is a large-scale infrastructure project focused on building a metro rail system.

    • The project involves various stages such as planning, design, construction, and implementation.

    • It may include tasks like excavation, tunneling, track laying, station construction, etc.

    • The project requires coordination wi...

  • Answered by AI
  • Q4. Site Engineer , metro project
  • Q5. Very good company

Interview Preparation Tips

Topics to prepare for J. Kumar Infraprojects Civil Site Engineer interview:
  • Civil Engineering
  • Site Engineering
  • Site Supervision
Interview preparation tips for other job seekers - Site Engineer
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 7 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Any questions in Lab engineering
  • Q2. Bitumen, Aggregate, penetretion test viscosity tests
Round 3 - Aptitude Test 

Compressive strength of cube

Round 4 - Coding Test 

All test all tests quality control

Round 5 - Case Study 

Bitumen, Aggregate test, cement test,????

Round 6 - Coding Test 

Coding test all questions

Round 7 - Coding Test 

All tests quality control in Lab engineering

Interview Preparation Tips

Topics to prepare for PNC Infratech Junior Engineer Civil interview:
  • Bitumen
  • Aggregate test
  • RMC ,wmm HM PLANT calibration
  • Cement test all tests
Interview preparation tips for other job seekers - Concrete in internet

Kalpataru Projects International Interview FAQs

What are the top questions asked in Kalpataru Projects International Civil Supervisor interview?

Some of the top questions asked at the Kalpataru Projects International Civil Supervisor interview -

  1. How you cheack column shutterin...read more
  2. What is your roal in sid...read more
  3. How u fixed bol...read more

Tell us how to improve this page.

Kalpataru Projects International Civil Supervisor Salary
based on 82 salaries
₹2 L/yr - ₹5.6 L/yr
5% less than the average Civil Supervisor Salary in India
View more details

Kalpataru Projects International Civil Supervisor Reviews and Ratings

based on 31 reviews

4.4/5

Rating in categories

4.2

Skill development

4.1

Work-life balance

4.5

Salary

3.9

Job security

4.3

Company culture

4.2

Promotions

4.2

Work satisfaction

Explore 31 Reviews and Ratings
Assistant Manager
657 salaries
unlock blur

₹3.8 L/yr - ₹14.8 L/yr

Senior Engineer
605 salaries
unlock blur

₹3.4 L/yr - ₹10.6 L/yr

Deputy Manager
602 salaries
unlock blur

₹5.2 L/yr - ₹19.5 L/yr

Manager
284 salaries
unlock blur

₹6.2 L/yr - ₹24 L/yr

Civil Engineer
245 salaries
unlock blur

₹2 L/yr - ₹7.7 L/yr

Explore more salaries
Compare Kalpataru Projects International with

Sterlite Power

4.0
Compare

Adani Transmission

3.8
Compare

Power Grid Corporation of India

4.4
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview