Upload Button Icon Add office photos

Filter interviews by

Janapriya Nirmaan Conglomerate Interview Questions and Answers

Updated 1 Jun 2024

Janapriya Nirmaan Conglomerate Interview Experiences

Popular Designations

2 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. 3 times interview
  • Q2. Material management for construction field.
  • Ans. 

    Material management in construction involves planning, procurement, storage, and distribution of materials for construction projects.

    • Effective planning is essential to ensure materials are available when needed

    • Procurement involves sourcing materials from suppliers at competitive prices

    • Storage should be organized to prevent damage and theft

    • Distribution involves timely delivery to the construction site

    • Examples: Just-in-t

  • Answered by AI
  • Q3. Technical building materials
Round 2 - Group Discussion 

Material rate analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary discussion

Purchase Manager Interview Questions asked at other Companies

Q1. Again if you are coming with reference then high probability of getting selected irrespective of what you have done in Interview. Some basic technical questions related to Job description. Not much technical as they dont have strong technic... read more
View answer (3)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Related is codes and communication skills
  • Q2. Asked is codes and communication skills related
  • Q3. Estimation sample explain
  • Ans. 

    Estimation sample is a subset of a population used to estimate characteristics of the entire population.

    • Estimation sample is selected randomly to ensure it is representative of the population.

    • The larger the estimation sample size, the more accurate the estimation.

    • Estimation sample should be chosen carefully to avoid bias and ensure reliability.

    • Examples: conducting a survey with a sample of 1000 people to estimate the p

  • Answered by AI

Project Coordinator Interview Questions asked at other Companies

Q1. What kind of water proofing application are used on terrace roof slab of the commercial, residential buildings
View answer (6)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is Your Current Sallary.
  • Ans. 

    I am currently earning $60,000 per year.

    • My current salary is $60,000 per year.

    • I am satisfied with my current salary.

    • I believe my salary reflects my experience and qualifications.

  • Answered by AI
  • Q2. Expected salary
  • Q3. Negotiable sallary how much you negotiate.
  • Q4. Yourself Introduction.
  • Q5. About Your projects, experience and some technical question . I.e. procedure of work , productivity of workman and how to start your activities etc.

Interview Preparation Tips

You should be confident don't be nervous and Give your best.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before May 2017.

Interview Questionnaire 

4 Questions

  • Q1. Good discussion with accounts team
  • Q2. Having good discussion with team
  • Q3. Good discussion for salary and others
  • Q4. Good company for working
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Questionnaire 

2 Questions

  • Q1. Type of pile , why we provide pile,pile dia , lvup vup svup type questions
  • Ans. 

    Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.

    • Types of piles include driven piles, bored piles, and screw piles.

    • Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.

    • The diameter of a pile is determined based on the load it needs to support and the soil conditions.

    • LVUP (Large...

  • Answered by AI
  • Q2. Mostly we use two types of pile (1) friction pile (2)end bearing pile

Interview Preparation Tips

Interview preparation tips for other job seekers - Please read MORTH AN

Senior Designer Bim Interview Questions & Answers

AECOM user image Anonymous

posted on 10 Feb 2021

Interview Questionnaire 

2 Questions

  • Q1. Why do you want to join Aecom.
  • Q2. What kind of projects have you done? And what is the probem face of them. And how to resolve.

Interview Preparation Tips

Interview preparation tips for other job seekers - Aecom is a big name in the engineering field, here we will get a lot to learn so that our future will grow well. Tell the truth about what you know or else you will face problems. Because next you have to do all the work yourself. Because of the high work load, no one can help you much. I worked at Aecom for seven years. I have learned a lot there. Salary always comes on time. Due to pendamic we had to leave the job due to lack of work. But the Aecom company had done our full and final settelement within a month. Aecom is a very good company. If I get a chance to work in the company again, I would definitely like to join. Workload is very high. Deadline is very less, which affects its quality of work.

Interview Questionnaire 

6 Questions

  • Q1. Percentage of steel in pile
  • Ans. 

    The percentage of steel in a pile varies depending on the type and design of the pile.

    • The percentage of steel in a pile can range from 0% to over 90%.

    • The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.

    • Steel piles typically have a higher percentage of steel than other types of piles.

    • The percentage of steel in a pile can also affect its

  • Answered by AI
  • Q2. Pile built-up above cut off level as per IS code
  • Ans. 

    Pile built-up above cut off level as per IS code

    • IS code specifies the maximum allowable pile length above cut off level

    • Pile length above cut off level should not exceed 3 times the pile diameter

    • Built-up pile above cut off level can cause structural instability and failure

  • Answered by AI
  • Q3. Pile vertical tolerance as per IS code
  • Ans. 

    Vertical tolerance for piles as per IS code

    • As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm

    • This tolerance is applicable for both driven and cast-in-situ piles

    • The tolerance is measured at the top of the pile and at intervals of 3m along the length

    • If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken

  • Answered by AI
  • Q4. Pile concrete consumption +- tolerance
  • Ans. 

    Pile concrete consumption tolerance depends on various factors.

    • Pile diameter and length

    • Concrete mix design

    • Placement method

    • Quality control measures

    • Environmental conditions

    • Tolerance typically ranges from 5-10% of estimated consumption

    • Regular monitoring and adjustment of concrete consumption is necessary

  • Answered by AI
  • Q5. Unit weight of steel
  • Ans. 

    Unit weight of steel is 7850 kg/m³

    • The unit weight of steel is the weight of a specific volume of steel

    • It is measured in kilograms per cubic meter (kg/m³)

    • The unit weight of steel is 7850 kg/m³

    • This value may vary slightly depending on the composition and manufacturing process of the steel

  • Answered by AI
  • Q6. Contractor MB related

I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How much cement used for making 1m³ concrete
  • Ans. 

    The amount of cement used for making 1m³ of concrete varies depending on the desired strength and type of concrete.

    • The cement content typically ranges from 300 to 400 kg/m³ for general-purpose concrete.

    • For high-strength concrete, the cement content can be as high as 500 kg/m³ or more.

    • The water-cement ratio also affects the amount of cement required.

    • Admixtures and additives may be used to modify the properties of the co...

  • Answered by AI
  • Q2. 360 kg
  • Q3. How much steel used for 1m³ concreting
  • Ans. 

    The amount of steel used for 1m³ concreting varies depending on the type of concrete and the structural requirements.

    • The steel used in concrete is typically in the form of reinforcing bars (rebar) or welded wire mesh.

    • The amount of steel required for 1m³ of concrete depends on the structural requirements and the type of concrete being used.

    • For example, a standard reinforced concrete slab may require 70-100 kg of steel p...

  • Answered by AI
  • Q4. This answer given by a formula & some thumbrules of this answer

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic knowledge is the best knowledge.....interviewer asked so much questions to ask but I'm ready to give his answers .It lasted for about 30 minutes.Luckily I was able to answer most of the questions correctly. I tried to give my best. My advice is to stay calm & should apply presence of mind.

Interview Questionnaire 

11 Questions

  • Q1. Structural welding codes, Bridge welding codes
  • Q2. Process piping works
  • Ans. 

    Process piping works involve the installation, inspection, and maintenance of pipes used in industrial processes.

    • Process piping works include the design, fabrication, and installation of pipes for conveying fluids or gases in industrial settings.

    • QA QC engineers ensure that the piping systems meet the required standards and specifications.

    • Inspection and testing of process piping is done to check for leaks, pressure, and...

  • Answered by AI
  • Q3. Bolts tightening procedure
  • Ans. 

    Bolts tightening procedure involves following a specific torque value and sequence to ensure proper fastening of bolts.

    • Check the torque value specified in the design or manual

    • Use a torque wrench to tighten the bolts to the specified value

    • Tighten the bolts in a specific sequence to ensure even distribution of load

    • Recheck the torque value after tightening all bolts

    • Record the torque value and sequence for future reference

  • Answered by AI
  • Q4. Bolts testing and torqueing sequences.
  • Q5. Hydrotest and pneumatic test for piping
  • Ans. 

    Hydrotest and pneumatic test are methods used to test the integrity of piping systems.

    • Hydrotest involves filling the piping system with water and pressurizing it to a specified level for a set duration.

    • Pneumatic test involves filling the piping system with compressed air or nitrogen and pressurizing it to a specified level for a set duration.

    • Both tests are used to ensure that the piping system can withstand the expecte...

  • Answered by AI
  • Q6. Able to refer codes and procedures.
  • Q7. Painting knowledge
  • Q8. Able to repair painted surface area.
  • Q9. Clients and inspection agency
  • Q10. Clients faced interviews.
  • Q11. Job training

I applied via Recruitment Consultant and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Regarding Welding process, Painting, Coating System, NDT Inspection, Piping and Structural codes and acceptance.

Interview Preparation Tips

Interview preparation tips for other job seekers - Must have knowledge about different type of materials, welding process and Advanced Technology for Inspection.

Janapriya Nirmaan Conglomerate Interview FAQs

How many rounds are there in Janapriya Nirmaan Conglomerate interview?
Janapriya Nirmaan Conglomerate interview process usually has 1-2 rounds. The most common rounds in the Janapriya Nirmaan Conglomerate interview process are Technical and Group Discussion.
What are the top questions asked in Janapriya Nirmaan Conglomerate interview?

Some of the top questions asked at the Janapriya Nirmaan Conglomerate interview -

  1. Material management for construction fie...read more
  2. Estimation sample expl...read more
  3. Related is codes and communication ski...read more

Tell us how to improve this page.

Janapriya Nirmaan Conglomerate Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 737 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
KEC International Interview Questions
4.0
 • 295 Interviews
Tata Technologies Interview Questions
3.6
 • 257 Interviews
TCE Interview Questions
3.8
 • 246 Interviews
View all

Janapriya Nirmaan Conglomerate Reviews and Ratings

based on 9 reviews

3.1/5

Rating in categories

2.7

Skill development

3.1

Work-life balance

2.6

Salary

2.2

Job security

2.7

Company culture

2.6

Promotions

2.7

Work satisfaction

Explore 9 Reviews and Ratings
Assistant Manager
3 salaries
unlock blur

₹8.5 L/yr - ₹9.5 L/yr

Design Coordinator
3 salaries
unlock blur

₹6 L/yr - ₹6.6 L/yr

Explore more salaries
Compare Janapriya Nirmaan Conglomerate with

TCS

3.7
Compare

Accenture

3.8
Compare

Wipro

3.7
Compare

Cognizant

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview