Filter interviews by
I applied via Referral and was interviewed in Apr 2022. There were 2 interview rounds.
Top trending discussions
I applied via campus placement at Visvesvaraya National Institute of Technology (VNIT), Nagpur and was interviewed in Oct 2024. There was 1 interview round.
A propped cantilever beam is a type of beam that is supported at one end and has a support (prop) at some point along its length.
Propped cantilever beams have a fixed support at one end and a prop at some point along the beam's length.
The prop helps to reduce the bending moment and deflection at the free end of the beam.
These beams are commonly used in construction to support overhanging structures or balconies.
Example...
The beam with the highest thickness will depend on the specific design and requirements of the structure.
The beam with the highest thickness will typically be a main load-bearing beam in the structure.
Factors such as the span of the beam, the load it needs to support, and the material used will determine the required thickness.
For example, a bridge beam supporting heavy traffic will likely have a higher thickness than
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
posted on 15 Jun 2024
I applied via Company Website and was interviewed in Jan 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Nov 2023. There were 3 interview rounds.
Sanik school G+2 , Quantity survey, estimation and costing
I applied via Approached by Company and was interviewed in Aug 2022. There was 1 interview round.
Design of PSC Girder involves several steps for both pre and post tensioned girders.
Determine the span length and load requirements
Select the cross-sectional shape and dimensions
Calculate the required prestressing force and tendon layout
Design the reinforcement for the non-prestressed section
Analyze the girder for serviceability and ultimate limit states
Check deflection, cracking, and shear capacity
Prepare detailed dra...
Different types of slabs include one-way slab, two-way slab, flat slab, ribbed slab, waffle slab, and hollow core slab.
One-way slab: supported on two opposite sides and bends in only one direction
Two-way slab: supported on all four sides and bends in two directions
Flat slab: without beams and supported directly on columns
Ribbed slab: with ribs on the underside for added strength and reduced weight
Waffle slab: with grid...
Different types of slabs foundation include raft, mat, flat plate, and waffle slab foundations.
Raft foundation: a solid reinforced concrete slab that covers the entire area under a building
Mat foundation: a thick concrete slab used to support heavy structures or buildings
Flat plate foundation: a simple and economical type of foundation with a uniform thickness
Waffle slab foundation: a type of foundation with grid-like
I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.
I am available for the project and can commit to the required time and effort.
I am currently not committed to any other projects
I have the necessary skills and experience to contribute effectively
I am willing to adjust my schedule if needed for the project
I am excited about the opportunity to work on this project
Components of bridges include abutments, piers, deck, superstructure, substructure, and foundation.
Abutments provide support at the ends of a bridge.
Piers support the bridge deck in the middle.
Deck is the surface that vehicles travel on.
Superstructure includes beams, girders, and trusses.
Substructure supports the superstructure and transfers loads to the foundation.
Foundation transfers the bridge loads to the ground.
Ex...
Bearings are structural components used to support and facilitate movement between two structural elements.
Types include roller bearings, ball bearings, plain bearings, and fluid bearings.
Roller bearings use cylindrical rollers to support heavy loads.
Ball bearings use balls to reduce friction between two surfaces.
Plain bearings have a sliding surface with no rolling elements.
Fluid bearings use a thin layer of liquid or
The major bridge I executed had a continuous span arrangement with multiple spans.
The major bridge had a continuous span arrangement with multiple spans
The span arrangement was designed to accommodate the required length and load capacity
The spans were connected seamlessly to ensure structural integrity and stability
posted on 29 May 2024
I applied via Company Website and was interviewed before May 2023. There was 1 interview round.
Initial setting time is the time taken for the cement to harden to a certain degree, while final setting time is the time taken for the cement to completely harden.
Initial setting time is typically around 30 minutes to 1 hour after adding water to the cement.
Final setting time is usually around 2 to 4 hours after adding water to the cement.
Setting time can vary based on the type of cement and environmental conditions.
S
Bleeding is the process of air escaping from fresh concrete mix and rising to the surface.
Bleeding occurs when water in the concrete mix rises to the surface due to settlement of solid particles.
It can lead to surface defects if not properly managed.
Bleeding can be reduced by using proper mix design and techniques like vibration or adding admixtures.
Excessive bleeding can weaken the surface of the concrete.
Examples: Wa...
Design Engineer
220
salaries
| ₹4.6 L/yr - ₹16.5 L/yr |
Senior Design Engineer
141
salaries
| ₹7.5 L/yr - ₹26 L/yr |
Piping Designer
86
salaries
| ₹4 L/yr - ₹13.4 L/yr |
Piping Design Engineer
86
salaries
| ₹4.8 L/yr - ₹15 L/yr |
Senior Engineer
70
salaries
| ₹9 L/yr - ₹21 L/yr |
AECOM
Bechtel
Fluor Corporation
Worley