Upload Button Icon Add office photos

Hindalco Industries

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Clear (1)

Hindalco Industries Project Engineer Interview Questions and Answers

Updated 17 Nov 2022

Hindalco Industries Project Engineer Interview Experiences

1 interview found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell us about yourself
  • Q2. Siemens plc programming

Interview Preparation Tips

Interview preparation tips for other job seekers - Be well prepared, skill upgrade and agility will help

Interview questions from similar companies

I was interviewed in Jul 2017.

Interview Preparation Tips

Round: Test
Experience: all job related technical question
Duration: 35 minutes
Total Questions: 30

Skills: Interest In The Job, Body Language In Interview

I applied via Campus Placement and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Current affairs and technical both questions will come be ready

Round 2 - Technical 

(2 Questions)

  • Q1. Question about what you studied technical branch that will ask
  • Q2. Round 3 HR Personal information, occupation of father and mother

Interview Preparation Tips

Topics to prepare for JSW Steel Junior Engineer interview:
  • Mechanical Engineering
  • Heat Treatment
  • Hot roller
  • Cold roller
Interview preparation tips for other job seekers - Good work environment, growth is good and I'm Lott of learned in this job

I was interviewed in May 2019.

Interview Questionnaire 

2 Questions

  • Q1. Different types of steel sections
  • Ans. 

    Steel sections are structural shapes made from steel for construction purposes.

    • I-beams

    • H-beams

    • C-channels

    • Angle sections

    • T-sections

    • Z-sections

    • Box sections

    • Circular sections

  • Answered by AI
  • Q2. Different types off load applied on long and short steel column
  • Ans. 

    Different types of loads applied on long and short steel columns

    • Long columns are more susceptible to buckling under compressive loads

    • Short columns are more susceptible to crushing under compressive loads

    • Long columns are more likely to experience bending under lateral loads

    • Short columns are more likely to experience shear under lateral loads

    • Examples of loads include dead load, live load, wind load, seismic load, etc.

  • Answered by AI

I was interviewed in Mar 2021.

Interview Questionnaire 

1 Question

  • Q1. About your previous company experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Strong Be confident be you

Interview Questionnaire 

1 Question

  • Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Knonlage of production equipment and DCS field operations handling and distillation column handling Referigeranats gas and caustic soda flakes
  • Q2. Heat exchanger pump reactor vessel and Evaporation and continuous process plant shutdown and startup
Round 3 - Technical 

(1 Question)

  • Q1. Maintain log book charge book and plant maintenance work

I applied via LinkedIn and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What do means of Evaporation system
  • Ans. 

    Evaporation system is a process of converting liquid into vapor by heating or reducing pressure.

    • Evaporation system is used in various industries like food, chemical, and pharmaceuticals.

    • It is used for concentration of solutions, separation of volatile components, and purification of liquids.

    • Examples of evaporation systems include rotary evaporators, falling film evaporators, and flash evaporators.

  • Answered by AI
  • Q2. Brief Difference between heat transfer & mass transfer with example
  • Ans. 

    Heat transfer is the movement of thermal energy from one object to another, while mass transfer is the movement of mass from one place to another.

    • Heat transfer involves the transfer of thermal energy due to a temperature difference, while mass transfer involves the transfer of mass due to a concentration difference.

    • Heat transfer can occur through conduction, convection, or radiation, while mass transfer can occur throu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always carefully listen Question. Give the same answer and win. next one is speaking to you ....Don't be afraid of interview .Time.Tell me what you know about what is being asked.. only this topic give answer..not otherwise extraordinary knowledge show.

I applied via Walk-in and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Electrical releted questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Select your company after interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Group Discussion 

Why are you Crack GD

Round 2 - HR 

(2 Questions)

  • Q1. HR friendly question is very normal type
  • Q2. Both family and you
Round 3 - Technical 

(3 Questions)

  • Q1. Basic Questions of Your releted Branches
  • Q2. What Is Half Bridge rectifier.
  • Ans. 

    A half bridge rectifier is a type of rectifier circuit that uses two diodes to convert alternating current (AC) to direct current (DC).

    • Consists of two diodes connected in a configuration that allows current to flow in only one direction

    • Used in applications where a full bridge rectifier is not necessary or practical

    • Produces a pulsating DC output

    • Commonly used in low power applications such as battery chargers and small p

  • Answered by AI
  • Q3. Draw the thermal power plant digaram
  • Ans. 

    A thermal power plant diagram shows the process of generating electricity using heat energy.

    • The diagram typically includes components such as boilers, turbines, generators, condensers, and cooling towers.

    • Heat energy from burning fossil fuels or nuclear reactions is used to produce steam, which drives turbines to generate electricity.

    • The steam is then condensed back into water and recycled in the system.

    • Cooling towers a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for JSW Steel Junior Engineer interview:
  • Electrical Machines
  • UEE
  • PLC
  • Threom
  • And basic questions
Interview preparation tips for other job seekers - Preparation of basic questions of your relevant streams
Contribute & help others!
anonymous
You can choose to be anonymous

Hindalco Industries Interview FAQs

How many rounds are there in Hindalco Industries Project Engineer interview?
Hindalco Industries interview process usually has 2 rounds. The most common rounds in the Hindalco Industries interview process are Resume Shortlist and Technical.

Recently Viewed

INTERVIEWS

Deutsche Bank

No Interviews

SALARIES

Bharat Aluminium Company (BALCO)

INTERVIEWS

Standard Chartered

No Interviews

INTERVIEWS

TCS

5.6k top interview questions

REVIEWS

Bharat Aluminium Company (BALCO)

No Reviews

REVIEWS

Bharat Aluminium Company (BALCO)

No Reviews

SALARIES

Bharat Aluminium Company (BALCO)

REVIEWS

Country Holidays Inn & Suites

No Reviews

SALARIES

H.G. Infra Engineering

INTERVIEWS

Salasar Techno Engineering

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 821 Interviews
JSW Steel Interview Questions
3.9
 • 595 Interviews
Rungta Mines Interview Questions
4.1
 • 88 Interviews
Coal India Interview Questions
4.0
 • 48 Interviews
Vedanta Limited Interview Questions
3.8
 • 46 Interviews
View all
Hindalco Industries Project Engineer Salary
based on 10 salaries
₹2.7 L/yr - ₹10 L/yr
13% more than the average Project Engineer Salary in India
View more details

Hindalco Industries Project Engineer Reviews and Ratings

based on 3 reviews

4.2/5

Rating in categories

4.2

Skill development

4.5

Work-life balance

3.8

Salary

4.5

Job security

4.2

Company culture

3.8

Promotions

4.0

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
581 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
541 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
454 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
286 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Hindalco Industries with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Vedanta Limited

3.8
Compare

Hindustan Zinc

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview