IRR stands for Internal Rate of Return in project management, which is a metric used to evaluate the profitability of a project.
IRR is a financial metric used to calculate the profitability of an investment or project.
It represents the discount rate that makes the net present value (NPV) of all cash flows from a project equal to zero.
A higher IRR indicates a more profitable project, while a lower IRR may signal potenti...
Project safety refers to the measures and protocols put in place to ensure the well-being and security of all individuals involved in a project.
Ensuring compliance with safety regulations and standards
Implementing safety training for all project team members
Conducting regular safety inspections and audits
Providing personal protective equipment (PPE) when necessary
Creating emergency response plans and protocols
Examples:...
Top trending discussions
posted on 8 Mar 2024
Slump test is a method to measure the workability of concrete by determining the consistency and stiffness of the mix.
Slump test involves filling a cone-shaped mold with concrete, then removing the mold and measuring how much the concrete slumps or settles.
The amount of slump indicates the workability of the concrete mix - higher slump means more workable mix.
Slump test helps in ensuring that the concrete mix has the r...
M30 grade concrete ratio is 1:1:2 (cement:sand:aggregate)
M30 grade concrete has a ratio of 1:1:2 for cement:sand:aggregate
This means for every part of cement, there is an equal part of sand and double the part of aggregate
For example, for 1 cubic meter of M30 concrete, you would need 1 part cement, 1 part sand, and 2 parts aggregate
Slum test is a method used to assess the quality of concrete by observing the flow of concrete through a standard slump cone.
Slump test is performed by filling a slump cone with freshly mixed concrete, then lifting the cone and measuring the amount of slump or settlement of the concrete.
The result of the slump test indicates the workability of the concrete mixture, with different slumps corresponding to different level...
I applied via Campus Placement and was interviewed before Jan 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Jan 2023. There were 3 interview rounds.
I applied via Newspaper Ad and was interviewed before May 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Aug 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed before Oct 2021. There were 2 interview rounds.
I was interviewed in Aug 2021.
Assistant Manager
101
salaries
| ₹3 L/yr - ₹11.4 L/yr |
Deputy Manager
79
salaries
| ₹4.7 L/yr - ₹14.4 L/yr |
Senior Officer
79
salaries
| ₹3.6 L/yr - ₹10 L/yr |
Officer
67
salaries
| ₹3.5 L/yr - ₹7.5 L/yr |
Manager
45
salaries
| ₹6.1 L/yr - ₹17 L/yr |
IFGL Refractories
Dalmia-OCL
Vesuvius
Dalmia Bharat Group