Filter interviews by
Casting is the process of creating objects by pouring a liquid material into a mold and allowing it to harden.
Casting involves pouring a material such as metal, plastic, or concrete into a mold
The material then hardens and takes the shape of the mold
Common examples of casting include metal casting for manufacturing parts and concrete casting for construction projects
Drilling is the process of creating a hole using a rotating cutting tool, while boring is the process of enlarging an existing hole.
Drilling is typically used to create holes in materials, while boring is used to enlarge existing holes.
Drilling is usually done with a drill bit, while boring is done with a boring tool.
Drilling is often used in construction and manufacturing, while boring is commonly used in machining pr...
posted on 20 Jul 2017
I appeared for an interview before Jul 2016.
I applied via Campus Placement
Apti, quant and general
Impact of pollution over environment
I applied via Job Fair and was interviewed before Oct 2023. There was 1 interview round.
posted on 3 Apr 2024
Clear cover, steel unit weight, leveling, shuttering , quantity of concrete
Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.
Involves designing and constructing buildings, bridges, roads, dams, and other structures
Focuses on ensuring structures are safe, functional, and sustainable
Requires knowledge of materials, construction techniques, and project management
Involves collaboration with architects, contractors, an...
RCC design grade of concrete refers to the strength of the concrete mix used in reinforced concrete construction.
RCC design grade is denoted by a number followed by 'M' (e.g. M20, M30, etc.)
Higher grade concrete (e.g. M30) is used for structures requiring higher strength like bridges and high-rise buildings
Lower grade concrete (e.g. M20) is used for general construction purposes like residential buildings
Work planning of job involves creating a detailed schedule and timeline for completing tasks and projects.
Identify project goals and objectives
Break down tasks into smaller components
Estimate time and resources needed for each task
Create a timeline with deadlines for each task
Assign responsibilities to team members
Regularly review and adjust the plan as needed
posted on 24 Dec 2024
I applied via LinkedIn and was interviewed before Dec 2023. There were 3 interview rounds.
PF can be corrected by updating the details in the PF portal and submitting necessary documents.
Update personal details in the PF portal
Submit required documents for correction
Contact HR or PF department for assistance
Energy saving procedures include optimizing lighting, HVAC systems, and equipment usage.
Implement energy-efficient lighting such as LED bulbs
Regularly maintain and tune HVAC systems for optimal performance
Use programmable thermostats to control heating and cooling
Turn off equipment when not in use to reduce standby power consumption
TPM procedures refer to Total Productive Maintenance practices aimed at maximizing equipment effectiveness and minimizing downtime.
TPM involves proactive maintenance to prevent breakdowns
Focuses on improving overall equipment efficiency
Involves training employees on equipment maintenance
Includes regular inspections and cleaning schedules
Utilizes tools like OEE (Overall Equipment Effectiveness) to measure performance
Criticality of machines can be identified based on their impact on production, safety, and downtime. They can be categorized as critical, essential, or non-essential.
Identify machines critical to production processes, where failure can lead to significant downtime or loss of revenue.
Consider machines critical to safety, where failure can pose a risk to employees or the environment.
Categorize machines as critical, essen...
Seeking new challenges and opportunities for professional growth.
Looking for new challenges and opportunities to learn and grow
Desire for career advancement and development
Seeking a more supportive work environment or better company culture
In about five years, I see myself leading a team of engineers, implementing innovative solutions, and contributing to the growth of the organization.
Leading a team of engineers in executing projects
Implementing innovative solutions to improve efficiency and quality
Contributing to the growth and success of the organization
Continuing professional development and learning new technologies
posted on 18 May 2023
I applied via Approached by Company and was interviewed before May 2022. There were 4 interview rounds.
Technical questions related job titles and experiences and job role
I applied via Campus Placement and was interviewed before Jun 2020. There was 1 interview round.
I appeared for an interview before Mar 2024.
Plant process and maintainance troubleshooting
posted on 8 Mar 2024
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
102
salaries
| ₹3 L/yr - ₹12 L/yr |
Senior Officer
85
salaries
| ₹3.3 L/yr - ₹10 L/yr |
Deputy Manager
81
salaries
| ₹4.7 L/yr - ₹14.3 L/yr |
Officer
71
salaries
| ₹3.5 L/yr - ₹7.5 L/yr |
Manager
45
salaries
| ₹6.1 L/yr - ₹19.8 L/yr |
Hindustan Zinc
Vedanta Resources
Carborundum Universal Limited
Metso