Round 1 - Technical 

(2 Questions)

  • Q1. What is Gant chart
  • Ans. 

    A Gantt chart is a visual representation of a project schedule that shows the start and finish dates of various elements of the project.

    • Gantt charts are used to plan, schedule, and track project progress

    • They show tasks, milestones, dependencies, and timelines in a graphical format

    • Commonly used in project management to communicate project status and timelines

    • Example: Task 1 starts on Monday and ends on Friday, Task 2 st

  • Answered by AI
  • Q2. Gant chart is the method for schedule and monitoring project Progress.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is Gant chart
  • Ans. 

    A Gantt chart is a visual representation of a project schedule that shows the start and finish dates of various elements of the project.

    • Gantt charts are used to plan, schedule, and track project progress

    • They show tasks, milestones, dependencies, and timelines in a graphical format

    • Commonly used in project management to communicate project status and timelines

    • Example: Task 1 starts on Monday and ends on Friday, Task 2 st

  • Answered by AI
  • Q2. Gant chart is the method for schedule and monitoring project Progress.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Basic knowledge of civil engineering
  • Ans. 

    Clear cover, steel unit weight, leveling, shuttering , quantity of concrete

  • Answered by Leeladhar Patnaik
  • Q2. What is civil engineering
  • Ans. 

    Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.

    • Involves designing and constructing buildings, bridges, roads, dams, and other structures

    • Focuses on ensuring structures are safe, functional, and sustainable

    • Requires knowledge of materials, construction techniques, and project management

    • Involves collaboration with architects, contractors, an...

  • Answered by AI
  • Q3. RCC design grade of concrete
  • Ans. 

    RCC design grade of concrete refers to the strength of the concrete mix used in reinforced concrete construction.

    • RCC design grade is denoted by a number followed by 'M' (e.g. M20, M30, etc.)

    • Higher grade concrete (e.g. M30) is used for structures requiring higher strength like bridges and high-rise buildings

    • Lower grade concrete (e.g. M20) is used for general construction purposes like residential buildings

  • Answered by AI
  • Q4. Bar bending scheduling
  • Q5. Work planning of job
  • Ans. 

    Work planning of job involves creating a detailed schedule and timeline for completing tasks and projects.

    • Identify project goals and objectives

    • Break down tasks into smaller components

    • Estimate time and resources needed for each task

    • Create a timeline with deadlines for each task

    • Assign responsibilities to team members

    • Regularly review and adjust the plan as needed

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is slump test
  • Ans. 

    Slump test is a method to measure the workability of concrete by determining the consistency and stiffness of the mix.

    • Slump test involves filling a cone-shaped mold with concrete, then removing the mold and measuring how much the concrete slumps or settles.

    • The amount of slump indicates the workability of the concrete mix - higher slump means more workable mix.

    • Slump test helps in ensuring that the concrete mix has the r...

  • Answered by AI
  • Q2. M30 grade concrete ratio
  • Ans. 

    M30 grade concrete ratio is 1:1:2 (cement:sand:aggregate)

    • M30 grade concrete has a ratio of 1:1:2 for cement:sand:aggregate

    • This means for every part of cement, there is an equal part of sand and double the part of aggregate

    • For example, for 1 cubic meter of M30 concrete, you would need 1 part cement, 1 part sand, and 2 parts aggregate

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. What is slum test
  • Ans. 

    Slum test is a method used to assess the quality of concrete by observing the flow of concrete through a standard slump cone.

    • Slump test is performed by filling a slump cone with freshly mixed concrete, then lifting the cone and measuring the amount of slump or settlement of the concrete.

    • The result of the slump test indicates the workability of the concrete mixture, with different slumps corresponding to different level...

  • Answered by AI
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What are you doing In person previous company
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical,hr,present past detail of work
  • Q2. Whatever they ask during pannel demands

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep calm and present yourself whatever you are. Eye to eye contact during communication.

TRL Krosaki Refractories Interview FAQs

How many rounds are there in TRL Krosaki Refractories Project Manager interview?
TRL Krosaki Refractories interview process usually has 1 rounds. The most common rounds in the TRL Krosaki Refractories interview process are One-on-one Round.

Tell us how to improve this page.

Interview Questions from Similar Companies

Saint-Gobain Interview Questions
4.0
 • 170 Interviews
Metso Outotec Interview Questions
4.4
 • 64 Interviews
Hindustan Zinc Interview Questions
3.9
 • 42 Interviews
Mecon Interview Questions
4.0
 • 41 Interviews
View all
TRL Krosaki Refractories Project Manager Salary
based on 9 salaries
₹7 L/yr - ₹20 L/yr
19% less than the average Project Manager Salary in India
View more details

TRL Krosaki Refractories Project Manager Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

1.0

Skill development

1.0

Work-life balance

2.0

Salary

1.0

Job security

1.0

Company culture

1.0

Promotions

1.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
106 salaries
unlock blur

₹4 L/yr - ₹12 L/yr

Senior Officer
81 salaries
unlock blur

₹3.6 L/yr - ₹10.2 L/yr

Deputy Manager
79 salaries
unlock blur

₹4.7 L/yr - ₹14.4 L/yr

Officer
67 salaries
unlock blur

₹3.5 L/yr - ₹7.5 L/yr

Manager
45 salaries
unlock blur

₹6.1 L/yr - ₹17 L/yr

Explore more salaries
Compare TRL Krosaki Refractories with

IFGL Refractories

3.7
Compare

Dalmia-OCL

3.8
Compare

Vesuvius

4.1
Compare

Dalmia Bharat Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview