Filter interviews by
Clear (1)
Slump test is a method to measure the workability of concrete by determining the consistency and stiffness of the mix.
Slump test involves filling a cone-shaped mold with concrete, then removing the mold and measuring how much the concrete slumps or settles.
The amount of slump indicates the workability of the concrete mix - higher slump means more workable mix.
Slump test helps in ensuring that the concrete mix has the r...
M30 grade concrete ratio is 1:1:2 (cement:sand:aggregate)
M30 grade concrete has a ratio of 1:1:2 for cement:sand:aggregate
This means for every part of cement, there is an equal part of sand and double the part of aggregate
For example, for 1 cubic meter of M30 concrete, you would need 1 part cement, 1 part sand, and 2 parts aggregate
Slum test is a method used to assess the quality of concrete by observing the flow of concrete through a standard slump cone.
Slump test is performed by filling a slump cone with freshly mixed concrete, then lifting the cone and measuring the amount of slump or settlement of the concrete.
The result of the slump test indicates the workability of the concrete mixture, with different slumps corresponding to different level...
Top trending discussions
posted on 4 Jul 2023
I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.
Project review in exting project .
Roles and reaponsibiloties
posted on 27 Apr 2024
I was interviewed before Apr 2023.
Debate on multiple topics
Come out with a conclusion and solutions to a problem
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
Mining is the process of extracting valuable minerals or other geological materials from the earth's surface or underground.
Mining is done to obtain various resources such as coal, gold, diamonds, and metals like iron, copper, and aluminum.
It involves the removal of soil, rocks, and other materials to access the desired minerals.
Mining can be categorized into surface mining and underground mining, depending on the loca...
I applied via Campus Placement and was interviewed before Aug 2022. There were 3 interview rounds.
Prepare the core subjects som Thermo fluids and asked some of the manufacturing process
How we can reduce the use of non renewable resources
Basic exam with some technical questions
Group of 6 were given a topic and we discussed.
Structural bridges can be made of various materials while concrete bridges specifically use concrete as the primary material.
Structural bridges can be made of steel, wood, or other materials, while concrete bridges are primarily made of concrete.
Concrete bridges are known for their durability and strength, making them a popular choice for infrastructure projects.
Structural bridges may require more maintenance and upkee...
The Howrah Bridge is a cantilever bridge that spans the Hooghly River in West Bengal, India.
Built in 1943, it is one of the busiest bridges in the world, carrying over 100,000 vehicles and countless pedestrians daily.
The bridge does not have any nuts or bolts and is held together by rivets.
It is a famous landmark in Kolkata and is often referred to as the 'Gateway of Kolkata'.
I applied via Recruitment Consulltant and was interviewed before Jun 2023. There was 1 interview round.
posted on 3 Feb 2025
I was interviewed before Feb 2024.
This is a basic 10th-grade level aptitude test; if you have prepared for the CAT or XAT exams, it should be quite easy for you.
Current topics related to your field of study or the job for which you have applied; I was campus placed, and therefore, this round was part of the selection process. For lateral entries, a direct interview occurs after your resume has been shortlisted.
Material topics under the umbrella for Hindalco and proposed solutions
Material topics for Hindalco may include sustainability, environmental impact, and supply chain management
Proposed solutions could involve implementing renewable energy sources, reducing waste generation, and optimizing logistics for efficiency
Engaging with stakeholders, conducting regular audits, and investing in technology for sustainable practices
posted on 14 Sep 2024
I applied via Company Website and was interviewed in Aug 2024. There were 2 interview rounds.
Gear box replacement work
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
198
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
139
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
60
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
44
salaries
| ₹0 L/yr - ₹0 L/yr |
Shift Incharge
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Hindalco Industries
Vedanta Limited
Nalco
Jindal Steel and Power