Filter interviews by
I applied via Approached by Company and was interviewed in Nov 2024. There were 2 interview rounds.
General knowledge must be need during position oponinent
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
Led a team in developing a mobile app for tracking fitness goals and progress.
Managed a team of 5 developers and designers
Implemented gamification features to increase user engagement
Integrated with wearable devices for real-time data tracking
Green field projects face challenges such as lack of existing infrastructure, resource allocation, and regulatory hurdles.
Lack of existing infrastructure can lead to delays and increased costs.
Resource allocation may be difficult due to competing priorities within the organization.
Regulatory hurdles, such as obtaining permits and approvals, can slow down the project timeline.
Environmental impact assessments may be requ
Previous CTC includes both fixed and variable components.
Previous CTC consisted of a fixed salary component and a variable component based on performance or targets.
For example, if the fixed salary was $50,000 and the variable component was 10% of the annual sales, the total CTC would be $50,000 + (10% of sales).
Seeking new challenges and opportunities for growth.
Looking for a new challenge to further develop my skills and knowledge.
Interested in exploring different industries and gaining diverse experience.
Seeking opportunities for career advancement and personal growth.
Safety for machines is crucial to prevent accidents and ensure smooth operations.
Regular maintenance and inspections are essential to identify and address any potential safety hazards.
Proper training for operators on safe machine operation and emergency procedures is necessary.
Implementing safety protocols and guidelines, such as lockout/tagout procedures, can help prevent accidents.
Providing personal protective equipm...
SOLAR INDUSTRIES INDIA interview questions for popular designations
Get interview-ready with Top SOLAR INDUSTRIES INDIA Interview Questions
HIRA stands for Hazard Identification and Risk Assessment, while HAZOP stands for Hazard and Operability Study.
HIRA is a systematic process for identifying hazards and assessing risks associated with a particular job or task.
HAZOP is a structured and systematic examination of a planned or existing process or operation to identify and evaluate problems that may represent risks to personnel or equipment.
Both HIRA and HAZ...
I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.
Value stream mapping is a lean management tool used to visualize and analyze the steps involved in delivering a product or service. 5S is a methodology for organizing a workplace for efficiency and effectiveness.
Value stream mapping helps identify waste and opportunities for improvement in a process.
It involves creating a visual representation of the flow of materials and information from supplier to customer.
5S stands...
Total productive maintenance (TPM) is a proactive approach to maintenance that aims to maximize equipment effectiveness and minimize downtime.
TPM focuses on empowering operators to take ownership of equipment maintenance.
It involves regular equipment inspections, cleaning, and minor repairs to prevent breakdowns.
TPM also includes training employees on proper maintenance techniques and creating a culture of continuous i...
I was interviewed in Mar 2024.
Mostly given scenario
Estimate target location by considering altitude, speed, wind direction, and gravity.
Consider the altitude of the fighter plane
Factor in the speed of the fighter plane
Take into account the wind direction and speed
Calculate the effect of gravity on the object being dropped
Use mathematical formulas and simulations to estimate the precise location
Structural failures in moving aircraft due to imperfect design include fatigue cracks, material failure, and aerodynamic instability.
Fatigue cracks can occur in high-stress areas of the aircraft structure, leading to catastrophic failure if not detected and repaired.
Material failure can result from using substandard materials or improper manufacturing processes, compromising the structural integrity of the aircraft.
Aer...
Top trending discussions
Interview experience
based on 373 reviews
Rating in categories
Executive Production
126
salaries
| ₹2.3 L/yr - ₹5.5 L/yr |
Senior Executive
118
salaries
| ₹3.5 L/yr - ₹8 L/yr |
Executive
94
salaries
| ₹2.6 L/yr - ₹5.8 L/yr |
Assistant Manager
85
salaries
| ₹4.2 L/yr - ₹11.5 L/yr |
Production Supervisor
80
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Ordnance Factory
Bharat Explosives
Nalco
Hindustan Zinc