Filter interviews by
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Activities in toilet area include personal hygiene, using the toilet, and cleaning.
Personal hygiene activities such as washing hands, brushing teeth, and showering
Using the toilet for urination and defecation
Cleaning activities such as wiping surfaces, changing toilet paper, and emptying trash
Maintenance tasks like unclogging drains or fixing leaks
Percentage of completion of a project can be calculated using the cost-to-cost method or milestone method.
Calculate %age of completion by comparing actual costs incurred to date with total estimated costs for the project.
Alternatively, %age of completion can be determined by tracking completion of specific project milestones.
Formula for cost-to-cost method: %age of completion = (Actual costs incurred / Total estimated ...
The sequence of tasks involves plumbing work, wall plastering, wall tiling, and flooring.
Start by completing the plumbing work in the walls and floors
Next, apply wall plaster to smoothen the surface
Then, install wall tiles for a decorative finish
Finally, proceed with the flooring installation
I applied via Approached by Company and was interviewed in May 2023. There were 4 interview rounds.
We managed utilities by closely monitoring usage, implementing energy-saving measures, and negotiating contracts with suppliers.
Closely monitored utility usage to identify areas of high consumption
Implemented energy-saving measures such as installing LED lighting and programmable thermostats
Negotiated contracts with utility suppliers to secure favorable rates and terms
Concession management involves negotiating and managing agreements with vendors for services or products within a commercial space.
Concession management involves negotiating contracts with vendors for space within a commercial property.
It includes setting terms for revenue sharing, rent, and other financial arrangements.
Managers oversee vendor performance, compliance with agreements, and resolving any disputes.
Examples...
A concessionaire is a person or company that holds a concession or lease to operate a business within a specific area or facility.
Concessionaires are often found in industries such as food and beverage, retail, and entertainment.
They typically pay a fee or percentage of their revenue to the entity granting the concession.
Examples of concessionaires include food vendors at sports stadiums, retail shops in airports, and
What people are saying about GMR Group
I would rate myself a 9 for Microsoft Project, 8 for Jira, and 7 for Trello.
Microsoft Project - 9
Jira - 8
Trello - 7
GMR Group interview questions for popular designations
Get interview-ready with Top GMR Group Interview Questions
I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
I applied via Internshala and was interviewed in Apr 2023. There were 4 interview rounds.
Aptitude test I like it very much
Area benefits refer to the advantages or perks that come with living in a specific location.
Access to amenities such as parks, schools, and shopping centers
Proximity to public transportation or major highways
Quality of schools and healthcare facilities in the area
Low crime rates and overall safety
Availability of job opportunities and economic growth
Cultural attractions and community events
Affordable housing options and
Coding test I like it
I appeared for an interview before Jan 2024.
The limit of pile settlement for vertiload testing is typically determined by the project specifications and design requirements.
The limit of pile settlement can vary depending on the type of structure being supported and the soil conditions
Common limits for pile settlement range from 10mm to 25mm
Settlement limits may also be specified in terms of a percentage of the pile diameter
Exceeding the allowable settlement limi...
IRC code for flexible pavement design
IRC: Indian Roads Congress
Flexible pavement design is covered in IRC:37-2012
IRC:37-2012 provides guidelines for design, construction, and maintenance of flexible pavements
Pile shifting limit refers to the maximum allowable movement of piles during construction.
Pile shifting limit is typically specified in the project specifications or design drawings.
Exceeding the pile shifting limit can lead to structural instability and potential failure.
Monitoring equipment such as inclinometers or settlement gauges may be used to track pile movement.
Adjustments to construction methods or pile design...
I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.
posted on 16 Sep 2023
I applied via Job Portal and was interviewed in Aug 2023. There were 3 interview rounds.
Some of the top questions asked at the GMR Group interview for experienced candidates -
The duration of GMR Group interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 33 interviews
Interview experience
based on 1.2k reviews
Rating in categories
Associate Manager
290
salaries
| ₹5.1 L/yr - ₹17 L/yr |
Junior Manager
250
salaries
| ₹3 L/yr - ₹12 L/yr |
Senior Engineer
119
salaries
| ₹3.5 L/yr - ₹8.5 L/yr |
Manager
111
salaries
| ₹9.5 L/yr - ₹28.6 L/yr |
Executive Accountant
59
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Larsen & Toubro Limited
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International