I would rate myself a 9 for Microsoft Project, 8 for Jira, and 7 for Trello.
Microsoft Project - 9
Jira - 8
Trello - 7
posted on 27 Dec 2020
I applied via Naukri.com and was interviewed before Dec 2019. There was 1 interview round.
posted on 11 Apr 2020
Execution and profit can be managed by setting clear goals, monitoring progress, optimizing processes, and making data-driven decisions.
Set clear and measurable goals for the company
Monitor progress regularly and make adjustments as needed
Optimize processes to increase efficiency and reduce costs
Make data-driven decisions based on financial and operational data
Invest in employee training and development to improve perf...
I will implement strict safety protocols and provide proper training to ensure both man and machine are controlled at site.
Implement safety protocols to ensure compliance
Provide proper training to all personnel
Regularly inspect and maintain equipment
Enforce strict adherence to safety guidelines
Monitor and evaluate performance regularly
I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 5 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
The El Signalling system is a railway signalling system used in Europe.
The system uses a combination of track circuits and signals to control train movements.
It was first introduced in the early 20th century and has since been updated and modernized.
The system is used in countries such as France, Spain, and Italy.
It allows for efficient and safe train operations on busy railway lines.
The system has faced some criticism
Indian Railways has a modern telecom system for efficient communication and safety.
Telecom system includes GSM-R, Wi-Fi, and CCTV surveillance.
GSM-R enables communication between train drivers and control centers.
Wi-Fi is available for passengers in select trains and stations.
CCTV surveillance ensures safety and security of passengers and railway property.
Indian Railways is also implementing a Train Collision Avoidance
I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.
Load calculation of Transformer
Load calculation involves determining the amount of power required by the load
Transformer rating should be higher than the calculated load
Load calculation takes into account factors such as power factor, efficiency, and voltage regulation
Formula for load calculation: Load (kVA) = Voltage (V) x Current (A) x Power Factor
Example: If the load is 100 kW with a power factor of 0.8 and a voltag...
I applied via Recruitment Consultant and was interviewed in Dec 2021. There were 3 interview rounds.
The procedure for welding different materials involves selecting the appropriate welding method, preparing the materials, and ensuring proper joint design and welding parameters.
Identify the materials to be welded and determine the compatibility of their properties.
Select the appropriate welding method based on the materials and desired joint strength.
Prepare the materials by cleaning, removing any contaminants, and en...
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
Productivity of equipment and planning work with special conditions is crucial for project success.
Efficient use of equipment can save time and money
Planning should consider any unique project requirements or constraints
Examples of special conditions include limited space, environmental regulations, or safety concerns
As per your ability you must ask your CTC.
I applied via Referral and was interviewed before Feb 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Associate Manager
289
salaries
| ₹5.1 L/yr - ₹17 L/yr |
Junior Manager
251
salaries
| ₹3 L/yr - ₹12 L/yr |
Manager
124
salaries
| ₹8.1 L/yr - ₹28 L/yr |
Senior Engineer
119
salaries
| ₹3.5 L/yr - ₹8.5 L/yr |
Executive Accountant
56
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Larsen & Toubro Limited
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International