Filter interviews by
I would rate myself a 9 for Microsoft Project, 8 for Jira, and 7 for Trello.
Microsoft Project - 9
Jira - 8
Trello - 7
The procedure for welding different materials involves selecting the appropriate welding method, preparing the materials, and ensuring proper joint design and welding parameters.
Identify the materials to be welded and determine the compatibility of their properties.
Select the appropriate welding method based on the materials and desired joint strength.
Prepare the materials by cleaning, removing any contaminants, and en...
posted on 9 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 27 Aug 2021
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
Cost control in construction activities through effective management of major items
Develop a detailed cost estimate for the project
Monitor and track actual costs against the estimate
Identify major cost drivers and implement cost-saving measures
Regularly review and update the project budget
Ensure effective communication and collaboration between all stakeholders
Use technology and software to streamline cost control proc...
posted on 27 Dec 2020
I applied via Naukri.com and was interviewed before Dec 2019. There was 1 interview round.
posted on 8 Sep 2022
Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.
Flexible pavement is made of multiple layers of materials that can flex under traffic loads.
Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.
New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...
The question describes the application of prime coat and tack coat on a WMM surface.
Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.
Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.
The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.
The tack coat helps in providing a strong b...
Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.
Use M15 grade concrete with maximum aggregate cement ratio of 12:1
Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%
Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...
Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.
Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%
Flexure strength of cement concrete after 28 days curing is 4.5 MPA
Compressive strength of cement concrete after 28 days curing is 40 MPA
Dowel bar provided for expansion joint vehicle load transfer between slabs
Tie...
I applied via Naukri.com and was interviewed before Nov 2022. There were 4 interview rounds.
I applied via Company Website and was interviewed in Nov 2023. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Associate Manager
290
salaries
| ₹5.1 L/yr - ₹17 L/yr |
Junior Manager
250
salaries
| ₹3 L/yr - ₹12 L/yr |
Senior Engineer
119
salaries
| ₹3.5 L/yr - ₹8.5 L/yr |
Manager
111
salaries
| ₹9.5 L/yr - ₹28.6 L/yr |
Executive Accountant
59
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Larsen & Toubro Limited
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International