Filter interviews by
I applied via Naukri.com and was interviewed in Nov 2021. There were 5 interview rounds.
5S is a workplace organization method that aims to improve efficiency and productivity.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
It involves organizing and cleaning the workplace to eliminate waste and improve safety.
Examples of 5S implementation include color-coding tools, labeling storage areas, and creating visual work instructions.
5S is often used in manufacturing and production environments...
The range and approach of chiller, condenser, and cooling tower depend on the specific requirements of the project.
The range and approach of chiller, condenser, and cooling tower will vary based on the size and type of the building or facility.
Factors such as the climate, occupancy, and equipment load will also impact the selection of the appropriate range and approach.
For example, a large commercial building in a hot ...
HVAC cycle involves four processes: compression, condensation, expansion, and evaporation.
The cycle starts with the compressor compressing the refrigerant gas.
The compressed gas then moves to the condenser where it is cooled and condensed into a liquid.
The liquid refrigerant then moves to the expansion valve where it is allowed to expand and evaporate.
The evaporated refrigerant then moves to the evaporator where it abs...
AHU stands for Air Handling Unit. It is a device used to regulate and circulate air as part of a heating, ventilating, and air-conditioning (HVAC) system.
AHUs are used to condition and circulate air in buildings and other enclosed spaces.
They typically consist of a blower, heating and cooling coils, filters, and dampers.
The blower is responsible for moving air through the AHU and into the ductwork.
The heating and cooli...
Kaizen, BLIP, and CIP are continuous improvement methodologies used in various industries.
Kaizen is a Japanese term for continuous improvement, focusing on small incremental changes to improve efficiency and quality.
BLIP stands for Breakthrough, Leap of Faith, Innovation, and Process Improvement, which is a methodology for driving innovation and change.
CIP stands for Continuous Improvement Process, which is a systemati...
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 12 May 2018
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 9 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
posted on 25 Jun 2021
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
posted on 4 May 2019
Associate Manager
290
salaries
| ₹5.1 L/yr - ₹17 L/yr |
Junior Manager
252
salaries
| ₹3 L/yr - ₹12 L/yr |
Manager
124
salaries
| ₹8.1 L/yr - ₹28 L/yr |
Senior Engineer
119
salaries
| ₹3.5 L/yr - ₹8.5 L/yr |
Executive Accountant
58
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Larsen & Toubro Limited
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International