I applied via Company Website and was interviewed before May 2023. There were 3 interview rounds.
Primary duties of planning engineer include creating project schedules, monitoring progress, identifying delays, and coordinating with stakeholders.
Creating and maintaining project schedules
Monitoring project progress and identifying delays
Coordinating with project team members and stakeholders
Analyzing project data and providing reports
Implementing changes to schedules as needed
Basic things required to create a project plan include defining project scope, setting objectives, creating a work breakdown structure, determining resources, and establishing a timeline.
Define project scope to outline the boundaries and deliverables of the project.
Set clear objectives to ensure the project goals are understood by all stakeholders.
Create a work breakdown structure (WBS) to break down the project into m...
Total float is the amount of time an activity can be delayed without delaying the project, while free float is the amount of time an activity can be delayed without delaying the early start of its successor activity.
Total float is the total amount of time that an activity can be delayed without delaying the project completion date.
Free float is the amount of time that an activity can be delayed without delaying the ear...
Constraints are limitations or restrictions that affect the planning and execution of a project.
Constraints can be related to time, budget, resources, or scope.
They can also include external factors such as regulations, market conditions, or stakeholder requirements.
Examples of constraints include a fixed deadline, a limited budget, a shortage of skilled labor, or a specific technology requirement.
Critical path is the longest sequence of activities in a project that determines the shortest possible duration. Float of critical activities is zero.
Critical path is the sequence of activities that determines the minimum project duration.
It consists of activities that have zero float, meaning any delay in these activities will delay the project.
Float of critical activities is zero, meaning they cannot be delayed witho...
Resource leveling is the process of smoothing out resource allocation to prevent peaks and valleys in resource usage.
Resource leveling involves adjusting the start and finish dates of activities to ensure resources are not overallocated at any point in time.
Resource allocation is the process of assigning resources to specific activities based on availability, skills, and requirements.
Resource leveling helps in optimizi...
A good schedule is one that is realistic, achievable, and well-organized.
A good schedule should be realistic and take into account all necessary tasks and resources.
It should be achievable within the given time frame and budget.
The schedule should be well-organized with clear milestones and deadlines.
Regular monitoring and updates are essential to ensure the schedule stays on track.
Examples: Gantt charts, critical path
I would consider various factors before making a decision, such as career growth opportunities, job satisfaction, work-life balance, and potential for learning and development.
Consider the overall job satisfaction and career growth opportunities in the current company
Evaluate the potential for learning and development in the new company
Assess the work-life balance and job security in both companies
Consider any addition...
I applied via Campus Placement and was interviewed in Aug 2022. There were 3 interview rounds.
Simple aptitude questions
Easy to clear it
Technical... Basics in mechanical (gate syllabus)
C section beam is poor in torsion compared to I section beam.
C section beam has a lower torsional rigidity due to its shape
I section beam has a higher torsional rigidity due to its symmetrical shape
C section beam is more prone to twisting under load
I section beam is commonly used in structures where torsional forces are present
I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed in Aug 2022. There were 3 interview rounds.
Simple aptitude questions and theoretical basic questions in core(mechanical)
GE Vernova interview questions for popular designations
Get interview-ready with Top GE Vernova Interview Questions
I applied via Approached by Company and was interviewed before Feb 2023. There were 2 interview rounds.
To design bearing brackets for a hydro generator, the cross section of arms is determined based on load considerations and materials are selected for their strength and corrosion resistance.
The design of bearing brackets for a hydro generator involves determining the cross section of arms.
The cross section of arms is decided based on load considerations such as the weight of the rotor, hydraulic forces, and any additio...
The stator core is a crucial component in an electric motor, providing support and magnetic flux. Clamping force, number of bolts, material, and cold rolled sheets are determined based on design requirements.
The function of the stator core is to support the windings and provide a path for the magnetic flux in an electric motor.
The clamping force for the stator core is determined based on the mechanical load and the des...
The design of a generator shaft involves considering factors such as material selection, stress analysis, and balancing.
Select appropriate material for the shaft based on factors like strength, corrosion resistance, and cost.
Perform stress analysis to ensure the shaft can withstand the operating loads and torque.
Consider factors like shaft diameter, length, and keyway design.
Balance the shaft to minimize vibrations and...
Rotor dynamics is the study of the behavior and performance of rotating machinery.
Rotor dynamics involves analyzing the vibrations, stability, and performance of rotating components such as rotors, shafts, and bearings.
Inputs required for rotor dynamics analysis include rotor geometry, material properties, operating conditions, and boundary conditions.
The output of rotor dynamics analysis includes critical speeds, mode...
I applied via Campus Placement and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Jun 2022. There were 2 interview rounds.
A firewall is a network security system that monitors and controls incoming and outgoing network traffic based on predetermined security rules.
Firewalls can be hardware or software-based
They act as a barrier between a trusted internal network and untrusted external network
Firewalls can block or allow traffic based on IP addresses, ports, protocols, or applications
Examples of firewalls include Cisco ASA, Palo Alto Netwo
Switches are devices used to connect multiple devices in a network and direct data packets to the appropriate destination.
Switches operate at the data link layer of the OSI model.
They use MAC addresses to forward data to the correct port.
Switches improve network performance by reducing collisions and segmenting traffic.
Examples of switches include Cisco Catalyst switches and Juniper EX switches.
A router is a networking device that forwards data packets between computer networks.
Routers operate at the network layer of the OSI model.
They use routing tables to determine the best path for data packets to reach their destination.
Routing involves selecting paths in a network along which to send network traffic.
Routers can connect different types of networks, such as LANs and WANs.
Examples of routers include Cisco r
Top trending discussions
Some of the top questions asked at the GE Vernova interview -
The duration of GE Vernova interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 70 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Lead Engineer
232
salaries
| â‚ą11 L/yr - â‚ą31 L/yr |
Senior Software Engineer
170
salaries
| â‚ą13.8 L/yr - â‚ą37 L/yr |
Software Engineer
110
salaries
| â‚ą9 L/yr - â‚ą22 L/yr |
Engineer
79
salaries
| â‚ą4.5 L/yr - â‚ą14.9 L/yr |
Mechanical Engineer
70
salaries
| â‚ą4.2 L/yr - â‚ą14.8 L/yr |
Siemens
BHEL
Thermax Limited
Tata Power