i
GE Vernova
Filter interviews by
I applied via Walk-in and was interviewed in Jun 2022. There were 3 interview rounds.
To understand the reason for breakdown, one needs to analyze the symptoms and perform diagnostic tests.
Analyze the symptoms of the breakdown
Perform diagnostic tests to identify the root cause
Check for any error codes or warning messages
Inspect the affected components or systems
Review maintenance records and history
Consult with other technicians or experts for advice
I will diagnose the root cause of the breakdown and implement the appropriate solution.
Conduct a thorough inspection of the equipment to identify the problem
Refer to technical manuals and schematics to troubleshoot the issue
Utilize diagnostic tools and equipment to pinpoint the cause of the breakdown
Implement the appropriate solution, whether it be repairing or replacing faulty components
Test the equipment to ensure it...
I would try to find alternative spare parts or order the required spare part from a supplier.
Check if there are any alternative spare parts available in the store
Search for the required spare part from other stores or suppliers
Order the required spare part from a supplier
Try to repair the machine using other available resources
Consult with colleagues or experts for alternative solutions
I have attended major breakdowns related to electrical systems and machinery.
Attended breakdown of a transformer resulting in power outage for an entire factory.
Resolved breakdown of a CNC machine resulting in production delay of 2 days.
Fixed breakdown of a conveyor belt system resulting in halt of material transportation.
Repaired breakdown of a generator resulting in loss of backup power supply.
Handled breakdown of a ...
Communicate problems to managers by being clear, concise, and providing solutions.
Identify the problem and its impact on the project or team
Provide possible solutions or recommendations
Communicate in a clear and concise manner
Use data or evidence to support your claims
Be respectful and professional
Follow up to ensure the problem is addressed
I maintain records of my works through a digital database and physical documentation.
I use a digital database to store all relevant information such as project details, timelines, and progress reports.
I also maintain physical documentation such as drawings, schematics, and maintenance logs.
I ensure that all records are up-to-date and easily accessible for future reference.
I follow company policies and procedures for re...
Top trending discussions
I applied via Job Portal and was interviewed before Sep 2021. There were 3 interview rounds.
I have 8 years of experience in wind energy industry.
I have worked in the wind energy industry for 8 years
Experience includes designing, installing, and maintaining wind turbines
Familiar with industry standards and regulations
Completed projects in various locations with different wind conditions
Tower claimb test of 800w wtg
Discuss work related questions
Distribution voltage refers to the voltage level at which electricity is distributed from substations to consumers.
Distribution voltage typically ranges from 4 kV to 33 kV for residential and commercial areas.
Higher distribution voltages, such as 66 kV or 132 kV, are used for industrial areas or large consumers.
The choice of distribution voltage depends on factors like distance, load requirements, and cost.
Transformers...
I applied via Referral and was interviewed before Nov 2023. There were 2 interview rounds.
posted on 25 Dec 2024
I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
Experienced Senior Engineer with a strong background in software development and project management.
Over 10 years of experience in designing and implementing complex software solutions
Proficient in multiple programming languages such as Java, Python, and C++
Led cross-functional teams to successfully deliver projects on time and within budget
Strong problem-solving skills and ability to adapt to new technologies quickly
I have over 10 years of experience in designing and implementing complex engineering solutions.
Designed and implemented various engineering solutions for different projects
Led a team of engineers to successfully complete a major project ahead of schedule
Collaborated with cross-functional teams to ensure project success
Utilized advanced engineering tools and techniques to optimize project outcomes
Doubly Fed Induction Generators (DFIGs) are commonly used in wind turbines to allow variable speed operation and improve efficiency.
DFIGs have two sets of windings - one on the stator and one on the rotor
The rotor windings are fed with variable frequency AC power through slip rings and brushes
DFIGs allow for control of both active and reactive power output
They are more efficient than fixed speed induction generators
DFI...
Circuit diagrams are essential in electrical engineering for visualizing and understanding complex circuits.
Circuit diagrams provide a visual representation of the connections and components in a circuit.
They help engineers analyze and troubleshoot circuits more efficiently.
Circuit diagrams aid in the design and construction of electrical systems.
They are crucial for documenting and communicating circuit designs to oth...
Reading a wiring diagram involves understanding symbols, following the flow of current, and identifying components.
Start by familiarizing yourself with the symbols used in the diagram.
Follow the flow of current from the power source to the components.
Identify the different components and their connections based on the diagram.
Pay attention to the color codes and labels for wires and components.
Refer to the legend or ke...
IGBT stands for Insulated Gate Bipolar Transistor, a semiconductor device used for switching applications in power electronics.
IGBT is a type of power semiconductor device that combines the high efficiency of a MOSFET with the high current and low saturation voltage capability of a bipolar transistor.
It consists of three terminals: gate, collector, and emitter.
IGBT works by controlling the flow of current between the c...
Yes, I have experience providing training to my team.
I have conducted training sessions on new technologies and tools for my team.
I have created training materials such as presentations, manuals, and hands-on exercises.
I have mentored junior team members to help them improve their skills.
I have received positive feedback from team members on the effectiveness of my training sessions.
Proficient in various programming languages and software tools, with experience in database management and system administration.
Proficient in programming languages such as Java, Python, and C++
Experience with database management systems like MySQL and MongoDB
Skilled in system administration tasks including network configuration and troubleshooting
Familiar with software tools such as Git, Jenkins, and Docker
I climb towers as part of my job requirements on a regular basis.
I climb towers for routine maintenance checks
I climb towers to install or repair equipment
I climb towers to conduct inspections or surveys
On average, I climb towers at least once a month
BOP refers to the systems and equipment outside of the main power generating unit in a power plant.
BOP includes components like transformers, switchgear, cooling systems, and fuel systems.
It is essential for the overall functioning of the power plant.
BOP is responsible for supporting the main power generation unit and ensuring its efficient operation.
Examples of BOP components are water treatment systems, piping, and c
SCADA systems are used to monitor and control industrial processes, while PLCs are programmable devices used to automate machinery and processes.
SCADA systems gather and analyze real-time data from sensors and equipment in industrial settings.
SCADA systems allow operators to remotely monitor and control processes, alarms, and events.
PLCs are programmable devices used to automate machinery and processes based on input f...
Yes, I can create a controlling circuit diagram based on your specifications.
I will need detailed specifications including input/output requirements, components to be used, and any specific constraints.
I will create a schematic diagram using software like Eagle, Altium, or KiCad.
I will ensure the circuit meets safety standards and is optimized for performance.
I will provide documentation including a bill of materials a
Synchronous generators produce electricity at a constant frequency, while asynchronous generators do not require synchronization with the grid frequency.
Synchronous generators are connected to the grid and produce electricity at a fixed frequency, typically 50 or 60 Hz.
Asynchronous generators do not need to be synchronized with the grid frequency and can operate at variable speeds.
Synchronous generators are commonly us...
SOP is a set of step-by-step instructions compiled by an organization to help workers carry out routine operations.
SOP is a detailed document that outlines the procedures and processes to be followed in specific situations.
It ensures consistency and quality in the performance of tasks.
SOPs are used in various industries such as healthcare, manufacturing, and IT.
Examples include a SOP for handling customer complaints in...
DGR, MGR, and YGR are commonly used acronyms in the engineering field.
DGR stands for Design Gross Rating, which is the maximum allowable weight for a designed structure.
MGR stands for Maximum Gross Rating, which is the maximum weight a vehicle can carry including its own weight.
YGR could refer to Yield Gross Rating, but context is needed to determine its specific meaning.
Yes, I am knowledgeable about MTBF and MTTR in the context of engineering.
MTBF refers to the average time between failures of a system or component.
MTTR is the average time it takes to repair a failed system or component.
Both metrics are important in assessing the reliability and maintenance needs of engineering systems.
For example, a server may have an MTBF of 10,000 hours and an MTTR of 2 hours.
MTTR is more important for system reliability as it directly impacts downtime and overall system availability.
MTTR directly impacts downtime and system availability
MTBF is important for predicting failures but does not address how quickly the system can be restored
Focusing on reducing MTTR can lead to improved system reliability and performance
DFIG controls the active and reactive power independently, improving efficiency and stability in wind turbines.
DFIG allows for variable speed operation, improving efficiency in wind turbines.
It controls the active and reactive power independently, enhancing stability.
DFIG can provide grid support by injecting or absorbing reactive power as needed.
It is commonly used in wind turbines to improve power quality and grid in...
Slip in a generator refers to the difference between synchronous speed and actual rotor speed.
Slip is necessary for the generation of electrical power in a generator.
It is calculated as (Synchronous speed - Actual speed) / Synchronous speed.
Slip is typically expressed as a percentage.
Higher slip values indicate lower efficiency in the generator.
For example, in an induction generator, slip is essential for inducing curr
Sub-synchronous, synchronous, and super-synchronous speeds refer to different speeds at which a rotating machine can operate in relation to the system frequency.
Sub-synchronous speed: When the machine speed is less than the synchronous speed, typically caused by a mechanical fault or system resonance.
Synchronous speed: When the machine speed matches the system frequency, commonly seen in normal operating conditions.
Sup...
Hub system and Nacelle system are crucial components in a wind turbine for efficient energy generation.
The hub system connects the blades to the main shaft of the turbine, allowing for rotation and energy generation.
The Nacelle system houses the gearbox, generator, and other key components necessary for converting wind energy into electricity.
Proper maintenance and monitoring of these systems are essential for optimal ...
I applied via Naukri.com and was interviewed in Nov 2022. There were 3 interview rounds.
The market salary for a civil engineer with 12 years of experience varies depending on location, company size, and specific skills.
Market salary can range from $80,000 to $150,000 per year
Factors such as location (urban vs rural), company size, and industry specialization can impact salary
Additional certifications or advanced degrees can also increase salary potential
One question paper of 10 questions.
Lead Engineer
248
salaries
| ₹10 L/yr - ₹36 L/yr |
Senior Software Engineer
164
salaries
| ₹13.8 L/yr - ₹37 L/yr |
Software Engineer
135
salaries
| ₹7.9 L/yr - ₹22 L/yr |
Mechanical Engineer
80
salaries
| ₹2.6 L/yr - ₹12.2 L/yr |
Engineer
79
salaries
| ₹4.5 L/yr - ₹14.9 L/yr |
Suzlon Group
Adani Group
NTPC
Torrent Power