Filter interviews by
I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.
The terms and conditions for the project manager position in the highway industry.
The terms and conditions will outline the responsibilities and expectations of the project manager.
It may include details about the duration of the project, working hours, and compensation.
Terms and conditions may also cover aspects such as leave policies, benefits, and performance evaluation.
Examples of specific terms and conditions coul...
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.
The density of steel is approximately 7.85 grams per cubic centimeter.
The density of steel is commonly measured in grams per cubic centimeter (g/cm³).
The density of steel can vary depending on the specific type and composition of the steel.
For example, the density of carbon steel is typically around 7.85 g/cm³.
Stainless steel, on the other hand, has a slightly lower density of around 7.9 g/cm³.
The density of steel is a...
The density of RCC (Reinforced Cement Concrete) and PCC (Plain Cement Concrete) varies depending on the mix proportions.
The density of RCC typically ranges from 2200 to 2500 kg/m³.
The density of PCC generally ranges from 2200 to 2400 kg/m³.
The density can vary based on the type and size of aggregates used, the water-cement ratio, and the presence of additives.
For example, a mix with a higher proportion of aggregates wi...
BBS stands for Bar Bending Schedule. It is a document that provides details of reinforcement steel bars required for a construction project.
BBS is calculated based on the design drawings and specifications.
It includes details such as bar diameter, length, shape, and number of bars required for each structural element.
BBS helps in estimating the quantity of steel required and also ensures that the reinforcement is place...
I have executed various types of structures including high-rise buildings, bridges, and industrial facilities.
Executed high-rise buildings with complex structural systems
Designed and analyzed bridges with different span lengths and types of materials
Managed the structural design of industrial facilities such as power plants and manufacturing plants
Worked on retrofitting and rehabilitation of existing structures
Collabor...
I applied via Naukri.com and was interviewed in Aug 2020. There were 5 interview rounds.
Gate pass and bill verification process for subcontractor manpower.
Gate pass should be issued to all subcontractor manpower entering the premises.
The gate pass should include details such as name, company, purpose of visit, and duration of stay.
The gate pass should be verified by the concerned department before allowing entry.
The bill verification process should include checking the number of hours worked, rates charge...
I prioritize the safety of employees and follow established protocols for handling emergencies.
Immediately notify emergency services and management
Secure the site and ensure the safety of remaining employees
Provide support and resources for affected employees and their families
Conduct a thorough investigation to determine the cause and prevent future incidents
Gayatri Projects interview questions for popular designations
Get interview-ready with Top Gayatri Projects Interview Questions
I applied via campus placement at Uttar Pradesh Technical University (UPTU) and was interviewed in Oct 2020. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in Sep 2020. There were 4 interview rounds.
I applied via Referral and was interviewed in Oct 2020. There was 1 interview round.
The quantity of work that can be done with 1 bag of cement varies depending on the type of work.
1 bag of cement can be used to lay approximately 70-80 standard bricks
1 bag of cement can be used to plaster approximately 10-12 square meters of wall
1 bag of cement can be used to create approximately 3-4 cubic meters of concrete
1 kg of putty/paint can cover approximately 10-12 square meters of wall
Start tiling from the center of the wall and work your way outwards.
Find the center point of the wall and mark it.
Start tiling from the center point and work your way outwards.
Use a spirit level to ensure the tiles are straight.
Leave space for grouting between tiles.
Cut tiles to fit around fixtures and edges.
Finish with a row of half tiles at the top or bottom.
Before tiling at bath/toilets, it is important to prepare the surface properly to ensure a long-lasting and durable finish.
Ensure the surface is clean and free of any debris or dust.
Check for any cracks or damage and repair them before tiling.
Apply a waterproofing membrane to prevent water damage.
Allow the surface to dry completely before tiling.
Use the appropriate adhesive and grout for the type of tiles being used.
Co...
I applied via Walk-in and was interviewed before Jan 2021. There was 1 interview round.
I applied via Advertisement and was interviewed in Nov 2020. There were 3 interview rounds.
Top trending discussions
Interview experience
based on 509 reviews
Rating in categories
Senior Engineer
73
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Highway Engineer
64
salaries
| ₹2.4 L/yr - ₹5.9 L/yr |
Junior Engineer
49
salaries
| ₹1.6 L/yr - ₹3.9 L/yr |
Civil Site Engineer
47
salaries
| ₹1.6 L/yr - ₹5.4 L/yr |
Civil Engineer
46
salaries
| ₹2.5 L/yr - ₹5.4 L/yr |
Nagarjuna Construction Company
IRB Infrastructure
Ashoka Buildcon
Simplex Infrastructures