Filter interviews by
Dynamic pressures act on supports by exerting force and causing movement.
Dynamic pressures are caused by fluid flow or wind gusts.
These pressures can cause vibrations and oscillations in the structure.
Supports must be designed to withstand these forces and prevent failure.
Examples of supports include beams, columns, and braces in buildings and bridges.
Proper analysis and testing is necessary to ensure the safety and st
Forward snaking and reverse snaking are techniques used in cable laying.
Forward snaking involves pulling a cable through a conduit from one end to the other.
Reverse snaking involves pushing a cable through a conduit from one end to the other.
Both techniques are used to lay cables in tight spaces or areas with limited access.
Reverse snaking is often used when the cable needs to be protected from damage during installati...
Creep control is the process of preventing or reducing the deformation of a material under a constant load over time.
Creep is a phenomenon where a material deforms over time under a constant load or stress.
Creep can be controlled by reducing the temperature, decreasing the load or stress, or using materials with higher strength.
For example, in the aerospace industry, creep control is important for preventing deformatio...
Production in longwall is calculated by measuring the amount of coal extracted per unit time.
Measure the amount of coal extracted per unit time
Calculate the production rate by dividing the amount of coal extracted by the time taken
Use sensors and monitoring systems to track the production
Adjust the longwall cutting speed and depth to optimize production
Staggering in longwalls refers to the practice of leaving pillars of coal between adjacent panels to provide support.
Staggering is a technique used in longwall mining to prevent the collapse of the roof and walls of the mine.
It involves leaving pillars of coal between adjacent panels to provide support.
The size and shape of the pillars depend on the geology of the mine and the equipment used.
Staggering can help to incr...
Horizon control refers to maintaining the aircraft's pitch and roll angles. Poor maintenance can lead to loss of control and accidents.
Horizon control is the process of maintaining the aircraft's pitch and roll angles using instruments such as the attitude indicator and artificial horizon.
If the horizon is not maintained well, the aircraft can lose control and enter into dangerous attitudes such as a stall or spin.
Poor...
The question is unclear and lacks context. It is not related to any specific field.
The question needs clarification on what is being referred to as 'fall'
It is unclear whether the question is related to a specific field or industry
Without more information, it is difficult to provide a meaningful answer
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
posted on 8 Sep 2024
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
I have extensive experience in overseeing the finishing work of building projects, ensuring high quality and timely completion.
Managed finishing work such as painting, flooring, and fixtures to meet project deadlines
Coordinated with subcontractors and vendors to ensure materials and labor were on schedule
Implemented quality control measures to maintain high standards of workmanship
Resolved any issues or discrepancies d...
DPR stands for Daily Progress Report. DLP period refers to Data Loss Prevention period.
DPR is a report that documents the daily progress of a project, including tasks completed, challenges faced, and plans for the next day.
DLP period is the time frame during which Data Loss Prevention measures are in effect to protect sensitive information from unauthorized access or disclosure.
Seeking new challenges, growth opportunities, and a better work-life balance.
Looking for new challenges and opportunities to grow professionally.
Seeking a better work-life balance.
Interested in working with new technologies or industries.
Want to expand my skill set and knowledge.
Seeking a more supportive or collaborative work environment.
I expect a competitive salary based on my experience, skills, and the market standards.
Expectation of a salary package that reflects my qualifications and experience
Consideration of market standards and industry norms
Open to negotiation based on additional benefits or perks offered
Looking for a fair and transparent compensation structure
posted on 27 Nov 2023
I applied via Referral and was interviewed before Nov 2022. There were 2 interview rounds.
Billing codes are determined by the organization and industry standards.
Billing codes are used to identify specific products or services provided by an organization.
The codes are typically determined by the organization and may also follow industry standards.
Examples of billing codes include CPT codes for medical procedures and UPC codes for retail products.
posted on 30 Nov 2023
I appeared for an interview before Nov 2022.
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
Productivity of machinery and manpower is crucial for efficient operations.
Efficient machinery and skilled manpower can increase productivity.
Regular maintenance of machinery can prevent downtime and increase productivity.
Proper training and motivation of manpower can also improve productivity.
Use of automation and technology can further enhance productivity.
Productivity can be measured using metrics such as output per
Standard thumb rule in estimation
Thumb rule is a rough estimate based on experience
It is not accurate and can vary based on project
Example: 1 hour per page for content writing
Example: 1 month per developer for a software project
I applied via Job Fair and was interviewed before Apr 2022. There were 2 interview rounds.
posted on 13 Aug 2021
I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.
based on 1 interview
Interview experience
Senior Engineer
73
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Highway Engineer
64
salaries
| ₹2.4 L/yr - ₹5.9 L/yr |
Civil Site Engineer
47
salaries
| ₹1.6 L/yr - ₹5.4 L/yr |
Junior Engineer
46
salaries
| ₹1.6 L/yr - ₹3.9 L/yr |
Civil Engineer
46
salaries
| ₹2.5 L/yr - ₹5.4 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon