Upload Button Icon Add office photos

Filter interviews by

Gayatri Projects Civil Site Engineer Interview Questions, Process, and Tips

Updated 4 Jul 2024

Top Gayatri Projects Civil Site Engineer Interview Questions and Answers

View all 6 questions

Gayatri Projects Civil Site Engineer Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Slop of stairs case
  • Ans. 

    The slope of stairs refers to the angle at which the stairs are inclined, affecting safety and accessibility.

    • The slope of stairs is typically between 30-35 degrees for comfortable and safe use.

    • Building codes may dictate specific slope requirements for stairs to ensure safety and accessibility.

    • The slope of stairs can be calculated using trigonometry, with the rise and run of the stairs determining the angle.

    • A steep slop...

  • Answered by AI
  • Q2. Why covering provided in steel reinforcement?
  • Ans. 

    Covering is provided in steel reinforcement to protect it from corrosion and to ensure proper bond with concrete.

    • Covering protects steel reinforcement from corrosion caused by exposure to moisture and chemicals in the environment.

    • It helps in maintaining the bond between steel reinforcement and concrete, ensuring structural integrity.

    • Proper covering thickness is important to prevent rusting of steel bars and maintain du...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is the leaping zone of steel rainforcement ?
  • Ans. 

    The leaping zone of steel reinforcement refers to the area where the steel bars are not provided in a concrete member.

    • The leaping zone is typically found in beams and slabs where the steel reinforcement is not required to be continuous.

    • It is important to ensure that the leaping zone does not compromise the structural integrity of the member.

    • Proper detailing and design considerations are necessary to determine the exten...

  • Answered by AI
  • Q2. How can identify the site uses materials?
  • Ans. 

    Site uses materials can be identified through visual inspection, testing, and documentation.

    • Conduct visual inspection of materials on site to identify their type and quality

    • Perform tests on materials such as soil, concrete, and asphalt to determine their properties

    • Review documentation such as material specifications, delivery receipts, and quality control reports

    • Consult with suppliers and manufacturers to verify the au

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Draw the section of stairs case with reinforcement.
  • Ans. 

    A section of stairs case with reinforcement is a structural drawing showing the details of the stairs and the reinforcement bars used for strength.

    • Include dimensions and materials used for the stairs and reinforcement bars

    • Show the arrangement of reinforcement bars in the section view

    • Label the different components of the stairs case for clarity

  • Answered by AI
  • Q2. What is the component of maivan technology
  • Ans. 

    Maivan technology consists of various components including sensors, software, and data analytics for monitoring and managing civil infrastructure.

    • Sensors are used to collect data on various parameters such as temperature, humidity, and structural integrity.

    • Software is utilized to process the data collected by sensors and provide real-time monitoring and analysis.

    • Data analytics tools are employed to identify patterns, t...

  • Answered by AI

I applied via Company Website and was interviewed before Oct 2020. There were 2 interview rounds.

Interview Questionnaire 

3 Questions

Related with civil engineer questions and answers

  • Q1. Heighway related building related ,cements related etc.
  • Q2. Heighway related building construction
  • Q3. Cement testing , concrete etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer for a civil engineer .i am working for any related of work in civil engineer

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. M-30 grade concrete
Round 3 - HR 

(1 Question)

  • Q1. Tell me about you

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Face to face interview

Round 2 - Technical 

(5 Questions)

  • Q1. What is the BBS and Survey
  • Ans. 

    BBS stands for Bar Bending Schedule and Survey refers to the process of measuring and mapping an area.

    • BBS is a document that provides details of reinforcement cutting length, type, and bending shape for construction.

    • Survey involves measuring and mapping land to determine boundaries, elevations, and other important information.

    • Both BBS and Survey are crucial in the construction industry to ensure accurate and efficient

  • Answered by AI
  • Q2. What is the estimation
  • Ans. 

    Estimation is the process of calculating the quantities and costs of materials, labor, and equipment required for a construction project.

    • Estimation involves determining the quantities of materials needed for a project.

    • It also includes calculating the labor hours required for the project.

    • Estimation considers the costs of equipment and other resources needed for the project.

    • Estimation helps in creating a budget and timel

  • Answered by AI
  • Q3. What is the soil test
  • Ans. 

    Soil test is a process of analyzing the properties of soil to determine its suitability for construction purposes.

    • Soil tests help in determining the strength, permeability, compaction, and other important properties of soil.

    • Different types of soil tests include sieve analysis, moisture content test, proctor compaction test, etc.

    • Results of soil tests help in designing foundations, pavements, retaining walls, and other s...

  • Answered by AI
  • Q4. What is the RCC
  • Ans. 

    RCC stands for Reinforced Cement Concrete, a composite material made of concrete and steel reinforcement.

    • RCC is a versatile construction material used in buildings, bridges, dams, etc.

    • It combines the compressive strength of concrete with the tensile strength of steel reinforcement.

    • RCC elements include beams, columns, slabs, and foundations.

    • Example: RCC beams are used to support the load of the structure and transfer it...

  • Answered by AI
  • Q5. What is the DPR
  • Ans. 

    DPR stands for Detailed Project Report, which is a comprehensive document that outlines the details of a construction project.

    • DPR includes information on project scope, objectives, cost estimates, timelines, resources, and potential risks.

    • It serves as a roadmap for the project, guiding the engineers and stakeholders throughout the construction process.

    • DPR is crucial for obtaining approvals, funding, and ensuring the su...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. Working time in site work
  • Q2. Working time period
  • Q3. Som soil survey steel
  • Q4. Highway engineering
  • Q5. Irrigation Fluid machinces
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Project and salary discussion
  • Q2. Expected date of joining
Round 2 - Technical 

(2 Questions)

  • Q1. Parts of building
  • Q2. Plaster thickness, steel calculation
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical side question
  • Q2. Civil engineering jobs in
Round 3 - Technical 

(2 Questions)

  • Q1. Civil structure
  • Q2. Civil engineering construction

Interview Preparation Tips

Topics to prepare for H.G. Infra Engineering Civil Site Engineer interview:
  • Civil Construction
  • Steel Structures
  • Sarvey
  • Building Construction
Interview preparation tips for other job seekers - Please company in job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Group Discussion 

It was very good , they give certain time to prepare yourself

Round 2 - Aptitude Test 

It's basically arithmetic and reasoning test

Round 3 - Technical 

(2 Questions)

  • Q1. What is the nominal size of brick
  • Ans. 

    The nominal size of a brick is the size specified by the manufacturer for identification and classification purposes.

    • The nominal size of a brick is typically larger than its actual size to account for mortar joints.

    • Common nominal sizes for bricks include 4 inches by 8 inches by 2 1/4 inches and 3 5/8 inches by 2 1/4 inches by 8 inches.

    • It is important to consider the nominal size when planning and designing brickwork pr

  • Answered by AI
  • Q2. What are the admixture of concrete
  • Ans. 

    Admixtures are added to concrete to alter its properties or enhance its performance.

    • Admixtures can improve workability, durability, strength, and set time of concrete

    • Types of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers

    • Example: Adding a water reducer admixture can increase the workability of concrete without compromising strength

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Get your knowledge about construction
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Cut length of spiral stirrup for pile..
  • Ans. 

    The cut length of spiral stirrup for a pile is determined based on the diameter of the pile and the spacing required for the stirrups.

    • Calculate the circumference of the pile using the formula C = π * d, where d is the diameter of the pile.

    • Determine the spacing required for the spiral stirrups based on design specifications.

    • Multiply the circumference of the pile by the number of required spiral stirrups to get the total...

  • Answered by AI
  • Q2. Axial load on column
  • Ans. 

    Axial load on column refers to the vertical force acting on the column, typically due to the weight of the structure it supports.

    • Axial load is the force that acts along the longitudinal axis of the column.

    • It is important to consider axial load in column design to ensure structural stability.

    • Examples of factors affecting axial load include dead loads, live loads, and wind loads on the structure.

  • Answered by AI

I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About tunneling pramery and secondary structure

Interview Preparation Tips

Topics to prepare for Patel Engineering Civil Site Engineer interview:
  • About tunneling
Interview preparation tips for other job seekers - My name is bashir Ahmad koka I am from Jammu and Kashmir and I have completed my education specialisation in civil engineering please find enclosed here with my curriculum vitae for a post at your project still I am working at NATM tunnel Jammu and Kashmir

Gayatri Projects Interview FAQs

How many rounds are there in Gayatri Projects Civil Site Engineer interview?
Gayatri Projects interview process usually has 3 rounds. The most common rounds in the Gayatri Projects interview process are Technical, One-on-one Round and Resume Shortlist.
What are the top questions asked in Gayatri Projects Civil Site Engineer interview?

Some of the top questions asked at the Gayatri Projects Civil Site Engineer interview -

  1. Why covering provided in steel reinforceme...read more
  2. What is the leaping zone of steel rainforcemen...read more
  3. How can identify the site uses materia...read more

Tell us how to improve this page.

People are getting interviews through

based on 2 Gayatri Projects interviews
Company Website
Job Portal
50%
50%
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates
Gayatri Projects Civil Site Engineer Salary
based on 52 salaries
₹1.5 L/yr - ₹5.4 L/yr
14% less than the average Civil Site Engineer Salary in India
View more details

Gayatri Projects Civil Site Engineer Reviews and Ratings

based on 11 reviews

4.7/5

Rating in categories

4.4

Skill development

4.3

Work-Life balance

4.3

Salary & Benefits

3.8

Job Security

4.6

Company culture

4.5

Promotions/Appraisal

4.4

Work Satisfaction

Explore 11 Reviews and Ratings
Senior Engineer
73 salaries
unlock blur

₹3.6 L/yr - ₹8.4 L/yr

Highway Engineer
64 salaries
unlock blur

₹2.4 L/yr - ₹5.9 L/yr

Civil Site Engineer
52 salaries
unlock blur

₹1.5 L/yr - ₹5.4 L/yr

Junior Engineer
49 salaries
unlock blur

₹1.6 L/yr - ₹3.9 L/yr

Civil Engineer
46 salaries
unlock blur

₹2.5 L/yr - ₹5.4 L/yr

Explore more salaries
Compare Gayatri Projects with

Nagarjuna Construction Company

4.1
Compare

IRB Infrastructure

4.0
Compare

Ashoka Buildcon

4.1
Compare

Simplex Infrastructures

3.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview