I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.
The terms and conditions for the project manager position in the highway industry.
The terms and conditions will outline the responsibilities and expectations of the project manager.
It may include details about the duration of the project, working hours, and compensation.
Terms and conditions may also cover aspects such as leave policies, benefits, and performance evaluation.
Examples of specific terms and conditions coul...
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Recruitment Consulltant and was interviewed before Jan 2022. There were 2 interview rounds.
posted on 8 Apr 2024
I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.
posted on 20 May 2024
posted on 16 May 2023
I applied via Campus Placement
Communication Colleagues
posted on 10 Jan 2025
I applied via Naukri.com and was interviewed before Jan 2024. There was 1 interview round.
Developing an erection plan involves creating a detailed strategy for the construction process.
Identify project requirements and objectives
Create a timeline for completion
Allocate resources and manpower
Coordinate with subcontractors and suppliers
Ensure compliance with building codes and regulations
I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 3 interview rounds.
The amount of sqm plastering done by a Mason per day depends on various factors such as the size of concrete blocks, workability, painting, and gypsum work.
The size of concrete blocks can affect the amount of plastering done per day.
Workability of the plastering material can also affect the speed of work.
Painting and gypsum work can add to the time required for plastering.
It is difficult to give an exact number for the...
I appeared for an interview in Dec 2024.
Lattice tower sub bracing design involves the structural support system for the tower.
Sub bracing design is crucial for maintaining the stability and strength of lattice towers.
The design should consider factors such as wind load, weight distribution, and material strength.
Examples of sub bracing design elements include diagonal bracing, horizontal bracing, and cross bracing.
Computer-aided design software is often used...
posted on 22 Apr 2022
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
Senior Engineer
73
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Highway Engineer
64
salaries
| ₹2.4 L/yr - ₹5.9 L/yr |
Civil Site Engineer
47
salaries
| ₹1.6 L/yr - ₹5.4 L/yr |
Junior Engineer
46
salaries
| ₹1.6 L/yr - ₹3.9 L/yr |
Civil Engineer
46
salaries
| ₹2.5 L/yr - ₹5.4 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon