i
G R
Infraprojects
Filter interviews by
AI tools include frameworks, libraries, and platforms that facilitate machine learning, data analysis, and natural language processing.
TensorFlow: An open-source library for machine learning and deep learning applications.
PyTorch: A flexible deep learning framework popular for research and production.
Scikit-learn: A library for classical machine learning algorithms in Python.
Keras: A high-level neural networks API...
The SAP payment process involves invoice verification, payment processing, and reconciliation within the financial module.
1. Invoice Verification: Ensures that the invoice matches the purchase order and goods receipt.
2. Payment Proposal: SAP generates a payment proposal based on due invoices and payment terms.
3. Payment Run: Execute the payment run to process payments to vendors or suppliers.
4. Payment Methods: Va...
A debit note is a document issued by a buyer to a seller, indicating a reduction in the amount owed, while a credit note is the opposite.
A debit note is used when a buyer returns goods or requests a price adjustment.
Example: A company returns defective products and issues a debit note to the supplier.
A credit note is issued by the seller to acknowledge the return and adjust the buyer's account.
Example: A seller is...
Subsequent debit refers to a charge made after an initial transaction, often correcting or adjusting previous entries.
Subsequent debits are often used in accounting to adjust errors from previous transactions.
For example, if a customer was overcharged, a subsequent debit may be issued to correct the amount.
In banking, a subsequent debit could occur if a transaction is reversed after the initial posting.
These debit...
TDS (Tax Deducted at Source) is a tax collection mechanism under Indian tax laws, governed by various sections of the Income Tax Act.
TDS is deducted at the source of income, ensuring tax collection at the time of payment.
Section 192 deals with TDS on salaries, where employers deduct tax before paying employees.
Section 194A pertains to TDS on interest payments, applicable to banks and financial institutions.
Section...
Our organization follows a systematic approach for receiving and storing materials to ensure efficiency and compliance.
1. Receiving Materials: We have a designated receiving area where all incoming materials are checked against purchase orders.
2. Quality Control: Each shipment undergoes quality inspection to ensure compliance with specifications before acceptance.
3. Documentation: All received materials are logged...
Reconciliation of materials ensures accurate inventory management and financial reporting through systematic verification processes.
1. Identify materials: Catalog all materials in inventory, including raw materials, work-in-progress, and finished goods.
2. Data collection: Gather data from various sources such as purchase orders, invoices, and inventory records.
3. Comparison: Compare physical counts of materials ag...
I prioritize safety through proper training, risk assessment, and adherence to protocols in all engineering tasks.
Conduct regular safety training sessions for all team members to ensure everyone is aware of potential hazards.
Implement a risk assessment process before starting any project to identify and mitigate risks.
Use personal protective equipment (PPE) such as helmets, gloves, and goggles when working in haza...
Electrical maintenance involves regular inspections, repairs, and upgrades to ensure safe and efficient electrical systems.
Routine inspections to identify wear and tear, such as checking circuit breakers and wiring.
Testing and replacing faulty components, like light fixtures or outlets.
Upgrading systems to meet current codes, for example, installing GFCI outlets in wet areas.
Performing preventive maintenance to av...
Cyclic loading in soil refers to repeated application of stress on soil over time, leading to changes in soil properties.
Cyclic loading can cause soil to undergo changes in density, strength, and deformation characteristics.
Examples of cyclic loading include traffic loads on roads, wave action on coastal soils, and seismic activity on earthquake-prone regions.
Electrical maintenance involves regular inspections, repairs, and upgrades to ensure safe and efficient electrical systems.
Routine inspections to identify wear and tear, such as checking circuit breakers and wiring.
Testing and replacing faulty components, like light fixtures or outlets.
Upgrading systems to meet current codes, for example, installing GFCI outlets in wet areas.
Performing preventive maintenance to avoid f...
Work related questions
I have a strong background in railway OHE engineering with experience in design, installation, and maintenance.
Experience in designing overhead electrification systems for railways
Knowledge of installation procedures and safety regulations
Experience in maintenance and troubleshooting of OHE systems
Familiarity with relevant software and tools such as AutoCAD and PLS-CADD
Strong understanding of electrical engineering pri...
I appeared for an interview in Jan 2025.
The number of beam lapping zones depends on the specific design and requirements of the project.
Beam lapping zones are typically determined based on structural requirements and load distribution.
The number of beam zones can vary based on factors such as beam size, material, and span length.
Consulting structural engineers and design specifications can help determine the appropriate number of beam lapping zones.
Overlap is the area where two VDF flooring sections meet, while confined zone is the area where the VDF flooring is contained during casting process.
Overlap is the junction between two VDF flooring sections, ensuring seamless connection.
Confined zone is the area where VDF flooring is poured and contained during casting process.
Properly managing overlap and confined zone is crucial for a successful VDF flooring installa...
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
I appeared for an interview in May 2025, where I was asked the following questions.
AI tools include frameworks, libraries, and platforms that facilitate machine learning, data analysis, and natural language processing.
TensorFlow: An open-source library for machine learning and deep learning applications.
PyTorch: A flexible deep learning framework popular for research and production.
Scikit-learn: A library for classical machine learning algorithms in Python.
Keras: A high-level neural networks API that...
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
EOT proposal is a request for an extension of time in a construction project due to delays beyond the contractor's control.
EOT stands for Extension of Time.
It is a formal request made by the contractor to the client or project owner.
The request is usually accompanied by supporting documentation such as delay analysis reports, weather reports, and other relevant evidence.
EOT proposals are typically reviewed by the proje...
To plan 2 lacs Cum concrete in 1 year, calculate daily production target and number of RMC plants needed.
Calculate daily production target by dividing total volume by number of working days in a year
Determine the capacity of each RMC plant and divide the daily production target by it to find out how many plants are needed
Consider factors like downtime, maintenance, and transportation in your planning
I appeared for an interview in Mar 2025, where I was asked the following questions.
I prioritize safety through proper training, risk assessment, and adherence to protocols in all engineering tasks.
Conduct regular safety training sessions for all team members to ensure everyone is aware of potential hazards.
Implement a risk assessment process before starting any project to identify and mitigate risks.
Use personal protective equipment (PPE) such as helmets, gloves, and goggles when working in hazardous...
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
Top trending discussions
Some of the top questions asked at the G R Infraprojects interview -
The duration of G R Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 172 interview experiences
Difficulty level
Duration
based on 1.6k reviews
Rating in categories
Assistant Manager
377
salaries
| ₹4.9 L/yr - ₹11.5 L/yr |
Senior Engineer
228
salaries
| ₹4 L/yr - ₹8.6 L/yr |
Deputy Manager
150
salaries
| ₹9 L/yr - ₹15 L/yr |
Engineer
138
salaries
| ₹2.2 L/yr - ₹5.6 L/yr |
Structural Engineer
114
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures