Filter interviews by
I applied via Approached by Company and was interviewed before Oct 2022. There were 4 interview rounds.
I maintained various types of documentation for my last company.
Maintained safety data sheets (SDS) for hazardous materials used in the workplace.
Created and updated standard operating procedures (SOPs) for safety protocols.
Maintained records of safety inspections and audits conducted.
Documented incident reports and investigations.
Managed training records for employees on safety procedures and policies.
Various types of documents are maintained in HSE, including policies, procedures, risk assessments, incident reports, training records, and permits.
Policies: Documents outlining the organization's HSE policies and objectives.
Procedures: Step-by-step instructions for carrying out specific HSE tasks.
Risk Assessments: Documents assessing potential hazards and risks in the workplace.
Incident Reports: Records of accidents, ...
Yes, I am flexible with multiple locations.
I have experience working in different locations.
I am willing to travel and adapt to new environments.
I have successfully managed teams in various locations.
I am open to new opportunities and challenges in different locations.
Top trending discussions
I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed before Sep 2021. There were 2 interview rounds.
Safety refers to the measures taken to prevent accidents, injuries, and other harmful incidents.
Safety involves identifying and assessing potential hazards and taking steps to eliminate or control them.
It also involves providing training and education to employees to ensure they understand how to work safely.
Regular inspections and audits are necessary to ensure safety standards are being met.
Examples of safety measure...
posted on 2 Dec 2024
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
SOP for basic activities at site includes inspection, testing, documentation, and reporting.
Inspection of materials and equipment
Testing of materials for quality control
Documentation of test results and findings
Reporting any deviations or non-conformities
Ensuring compliance with project specifications and standards
Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.
Calculate the surface area of each individual formwork used for the concrete structure
Add up the surface areas of all formworks to get the total shuttering area
Consider any openings or gaps in the formwork when calculating the area
The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.
The formula for the area of a semi-circle is (1/2) * pi * r^2
The radius (r) is half the diameter of the circle
Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2
I applied via Company Website and was interviewed before Dec 2022. There were 4 interview rounds.
I am an experienced Electrical Engineer with a passion for designing and implementing innovative solutions.
I have a strong background in electrical engineering, with a focus on power systems and control systems.
I have successfully designed and implemented electrical systems for various projects, including commercial buildings and industrial plants.
I am skilled in using CAD software for electrical design and have experi...
I can provide the required documents and discuss salary and joining details.
I can provide all necessary documents such as resume, certifications, and transcripts.
My current base salary is $X per year.
I expect a base salary in the range of $Y to $Z per year.
I am available to join within X weeks/months.
I can discuss further details during the interview.
posted on 13 Sep 2022
posted on 2 Feb 2022
I applied via Approached by company and was interviewed in Jan 2022. There were 4 interview rounds.
Engineering paper of concrete related and other subjects.
posted on 3 Jul 2021
I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
Types of cables include coaxial, twisted pair, fiber optic, and ribbon cables.
Coaxial cables are used for high-frequency transmission and have a central conductor surrounded by insulation and a shield.
Twisted pair cables are commonly used for Ethernet networks and consist of two insulated copper wires twisted together.
Fiber optic cables use light to transmit data and are used for long-distance communication.
Ribbon cabl...
Conductors are materials that allow electric current to flow through them. There are different types of conductors.
Metallic conductors (copper, aluminum, silver, gold, etc.)
Non-metallic conductors (graphite, silicon, etc.)
Superconductors (materials that have zero electrical resistance at very low temperatures)
Semiconductors (materials that have intermediate conductivity)
Ionic conductors (materials that conduct electric
Joints are used to connect two or more electrical conductors together.
Joints are used to extend the length of a conductor.
They are also used to repair a broken conductor.
Joints can be made using various methods such as soldering, crimping, or using connectors.
Proper insulation must be used to prevent short circuits and ensure safety.
Joints should be made with care to ensure good electrical conductivity and avoid resist...
Materials are inspected using various techniques such as visual inspection, testing, and quality control measures.
Visual inspection involves examining materials for any visible defects or abnormalities.
Testing methods include conducting electrical, mechanical, and chemical tests to ensure the materials meet specifications.
Quality control measures involve monitoring and evaluating the materials throughout the production...
BOQ stands for Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
BOQ is used in construction projects to estimate the cost of materials, labor, and equipment.
It lists all the items needed for the project, along with their quantities and prices.
BOQ helps in budgeting and cost control during the project.
It is prepared by a quantity surveyor or an ...
based on 1 review
Rating in categories
Senior Project Engineer
47
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Project Engineer
38
salaries
| ₹3.5 L/yr - ₹7 L/yr |
Assistant Manager
21
salaries
| ₹6 L/yr - ₹9.6 L/yr |
Project Manager
16
salaries
| ₹8 L/yr - ₹14.4 L/yr |
Senior Safety Officer
13
salaries
| ₹4.8 L/yr - ₹7.3 L/yr |
JLL
CBRE
Cushman & Wakefield
Knight Frank