Filter interviews by
I applied via Approached by Company and was interviewed before Oct 2022. There were 4 interview rounds.
I maintained various types of documentation for my last company.
Maintained safety data sheets (SDS) for hazardous materials used in the workplace.
Created and updated standard operating procedures (SOPs) for safety protocols.
Maintained records of safety inspections and audits conducted.
Documented incident reports and investigations.
Managed training records for employees on safety procedures and policies.
Various types of documents are maintained in HSE, including policies, procedures, risk assessments, incident reports, training records, and permits.
Policies: Documents outlining the organization's HSE policies and objectives.
Procedures: Step-by-step instructions for carrying out specific HSE tasks.
Risk Assessments: Documents assessing potential hazards and risks in the workplace.
Incident Reports: Records of accidents, ...
Yes, I am flexible with multiple locations.
I have experience working in different locations.
I am willing to travel and adapt to new environments.
I have successfully managed teams in various locations.
I am open to new opportunities and challenges in different locations.
Top trending discussions
I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed before Sep 2021. There were 2 interview rounds.
Safety refers to the measures taken to prevent accidents, injuries, and other harmful incidents.
Safety involves identifying and assessing potential hazards and taking steps to eliminate or control them.
It also involves providing training and education to employees to ensure they understand how to work safely.
Regular inspections and audits are necessary to ensure safety standards are being met.
Examples of safety measure...
posted on 2 Dec 2024
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
SOP for basic activities at site includes inspection, testing, documentation, and reporting.
Inspection of materials and equipment
Testing of materials for quality control
Documentation of test results and findings
Reporting any deviations or non-conformities
Ensuring compliance with project specifications and standards
posted on 19 Oct 2023
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
The amount of square metres of shuttering done in a day by 1 carpenter and 1 helper varies based on factors like experience, efficiency, and complexity of the task.
The square metres of shuttering done per day can range from 10-50 depending on the skill level and speed of the carpenter and helper.
Factors such as the type of material used, complexity of the design, and availability of tools can also impact the amount of ...
Nominal mix is a rough mix with fixed ratios, while design mix is a specific mix designed for a particular strength and durability.
Nominal mix has fixed ratios like 1:2:4, while design mix is calculated based on specific requirements.
Design mix is more precise and tailored to achieve desired strength and durability.
Nominal mix is commonly used for small construction projects, while design mix is preferred for larger pr...
I applied via Approached by Company and was interviewed before Sep 2022. There were 11 interview rounds.
Aptitude Test: This is often one of the initial stages. It assesses a candidate's basic cognitive abilities, problem-solving skills, and logical reasoning.
Coding Test: For technical roles, a coding test is common. Candidates are given programming challenges to assess their coding skills, algorithmic thinking, and problem-solving abilities.
Group Discussion (GD): This stage may be used to evaluate communication skills, teamwork, and the ability to articulate thoughts. It's often used for roles that require collaboration and communication
Assignment: Some companies provide candidates with a specific task or assignment related to the job. This can be a practical demonstration of the candidate's skills and approach to real-world tasks.
Case Study: Similar to an assignment but often focused on problem-solving or decision-making. Case studies assess a candidate's ability to analyze information, make informed choices, and present a logical solution.
I applied via Company Website and was interviewed before Dec 2022. There were 4 interview rounds.
I am an experienced Electrical Engineer with a passion for designing and implementing innovative solutions.
I have a strong background in electrical engineering, with a focus on power systems and control systems.
I have successfully designed and implemented electrical systems for various projects, including commercial buildings and industrial plants.
I am skilled in using CAD software for electrical design and have experi...
I can provide the required documents and discuss salary and joining details.
I can provide all necessary documents such as resume, certifications, and transcripts.
My current base salary is $X per year.
I expect a base salary in the range of $Y to $Z per year.
I am available to join within X weeks/months.
I can discuss further details during the interview.
posted on 8 Dec 2022
I was interviewed before Dec 2021.
The grades of steel refer to different classifications based on their chemical composition and physical properties.
Steel grades are typically designated by a combination of numbers and letters.
Common steel grades include A36, A572, and A514.
Each grade has specific characteristics that make it suitable for different applications.
Grades of steel can vary in terms of strength, hardness, corrosion resistance, and weldabili...
Nominal mix design is a method of proportioning ingredients in concrete using nominal ratios.
Nominal mix design uses approximate ratios of ingredients instead of exact measurements.
It is commonly used for small construction projects where precise measurements are not necessary.
For example, a nominal mix of 1:2:4 would mean one part cement, two parts sand, and four parts coarse aggregate.
Nominal mix design is not recomm...
Types of cables include coaxial, twisted pair, fiber optic, and ribbon cables.
Coaxial cables are used for high-frequency transmission and have a central conductor surrounded by insulation and a shield.
Twisted pair cables are commonly used for Ethernet networks and consist of two insulated copper wires twisted together.
Fiber optic cables use light to transmit data and are used for long-distance communication.
Ribbon cabl...
Conductors are materials that allow electric current to flow through them. There are different types of conductors.
Metallic conductors (copper, aluminum, silver, gold, etc.)
Non-metallic conductors (graphite, silicon, etc.)
Superconductors (materials that have zero electrical resistance at very low temperatures)
Semiconductors (materials that have intermediate conductivity)
Ionic conductors (materials that conduct electric
Joints are used to connect two or more electrical conductors together.
Joints are used to extend the length of a conductor.
They are also used to repair a broken conductor.
Joints can be made using various methods such as soldering, crimping, or using connectors.
Proper insulation must be used to prevent short circuits and ensure safety.
Joints should be made with care to ensure good electrical conductivity and avoid resist...
Materials are inspected using various techniques such as visual inspection, testing, and quality control measures.
Visual inspection involves examining materials for any visible defects or abnormalities.
Testing methods include conducting electrical, mechanical, and chemical tests to ensure the materials meet specifications.
Quality control measures involve monitoring and evaluating the materials throughout the production...
BOQ stands for Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
BOQ is used in construction projects to estimate the cost of materials, labor, and equipment.
It lists all the items needed for the project, along with their quantities and prices.
BOQ helps in budgeting and cost control during the project.
It is prepared by a quantity surveyor or an ...
based on 1 review
Rating in categories
Senior Project Engineer
47
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Project Engineer
38
salaries
| ₹3.5 L/yr - ₹7 L/yr |
Assistant Manager
21
salaries
| ₹6 L/yr - ₹9.6 L/yr |
Project Manager
16
salaries
| ₹8 L/yr - ₹14.4 L/yr |
Senior Safety Officer
13
salaries
| ₹4.8 L/yr - ₹7.3 L/yr |
JLL
CBRE
Cushman & Wakefield
Knight Frank