Upload Button Icon Add office photos

Filter interviews by

Facilities And Building Solutions Head - Projects Interview Questions and Answers

Updated 26 Feb 2022

Facilities And Building Solutions Head - Projects Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Long interview 2 hr over fone
  • Q2. All technical related start till end
  • Q3. Construction of start till end with contractual contd.

Interview Preparation Tips

Interview preparation tips for other job seekers - No action after took 3 times each time 2 hr but they could not finalized..

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in Oct 2018. There were 7 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Asked my back ground including achievement

Interview Preparation Tips

Round: Resume Shortlist
Experience: Based on my vast Telecom experience in various reputed organisation in Managing, Planning and the Implementation of Telecom Network of all variants including NLD and Broadband Network at par with International standard and quality

Round: Case Study Interview
Experience: The implementation of a green field project based on PODSCORB

Round: Manangement Interview
Experience: Company's CEO & MD has seen my attitude & asking ROI

General Tips: The candidate is having self believer & present himself with confident with positive attitude .
Never guess any answer & if you do not, simply say I do not know.
Try to take yourself towards your strong area.
Never criticised your past employer & boss.
Always be calm, cool & be positive
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. What is the Steel margin
  • Ans. 

    Steel margin refers to the difference between the cost of producing steel and the selling price.

    • Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.

    • It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.

    • Factors that can impact the steel margin include fluctuations in ...

  • Answered by AI
  • Q2. What is the persentage of Aggregate in Gradiation test
  • Ans. 

    The percentage of aggregate in gradation test varies depending on the specific requirements of the project.

    • The percentage of aggregate in gradation test is typically determined by the specifications provided for the project

    • It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix

    • For example, in a concrete mix design, the percentage of coarse aggregate ma...

  • Answered by AI
  • Q3. Project manager role at site
  • Ans. 

    The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.

    • Responsible for planning, organizing, and directing project activities

    • Ensuring project goals are met within budget and timeline

    • Managing resources and stakeholders effectively

    • Problem-solving and decision-making skills are essential

    • Strong communication and leadership skills are necessary

  • Answered by AI
  • Q4. What is the overall cost in project in role of RCC
  • Ans. 

    The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.

    • Calculate the cost of materials such as cement, aggregates, and reinforcement bars.

    • Consider the cost of labor for construction and installation of RCC components.

    • Include any additional costs such as equipment rental, transportation, and overhead expenses.

    • Factor in the cost of quality control me...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Mot Satisfaction job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Process of W. T. P
  • Ans. 

    The process of Water Treatment Plant (W.T.P) involves various stages to purify water for consumption.

    • 1. Coagulation: Adding chemicals to water to make particles clump together.

    • 2. Sedimentation: Allowing the clumped particles to settle at the bottom.

    • 3. Filtration: Passing water through filters to remove remaining particles.

    • 4. Disinfection: Adding chlorine or other chemicals to kill bacteria and viruses.

    • 5. Distribution: ...

  • Answered by AI
  • Q2. About safety precautions
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is SFRA test on power transformer?
  • Ans. 

    SFRA test is a diagnostic test performed on power transformers to assess their mechanical and electrical integrity.

    • SFRA stands for Sweep Frequency Response Analysis.

    • It is a non-intrusive test that measures the frequency response of a transformer to a swept sinusoidal input signal.

    • The test helps in identifying mechanical and electrical faults in the transformer windings.

    • SFRA test results can be compared with baseline me...

  • Answered by AI
Round 1 - Technical 

(2 Questions)

  • Q1. Which grade of concrete normal use for rcc
  • Ans. 

    The grade of concrete normally used for RCC is M20.

    • The grade of concrete for RCC (Reinforced Cement Concrete) is determined based on the design requirements and structural considerations.

    • The most commonly used grade of concrete for RCC is M20, which means the concrete mix has a compressive strength of 20 megapascals (MPa) after 28 days of curing.

    • Other grades of concrete like M25, M30, M35, etc., can also be used depend...

  • Answered by AI
  • Q2. What are the pre initiative action for start pilling
  • Ans. 

    Pre-initiative actions for start piling

    • Conduct a geotechnical investigation to assess soil conditions

    • Obtain necessary permits and approvals from local authorities

    • Develop a detailed piling plan and schedule

    • Procure required piling equipment and materials

    • Ensure safety measures are in place for workers and surrounding areas

    • Prepare the site by clearing any obstacles or debris

    • Establish proper communication channels with stak...

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. What is the duration for deshuttering a beam of span 4 mtr
  • Ans. 

    The duration for deshuttering a beam of span 4 mtr depends on various factors.

    • The type of formwork used for shuttering the beam

    • The strength of the concrete used

    • The ambient temperature and humidity

    • The curing process followed

    • The complexity of the beam design

    • The availability of manpower and equipment

    • Typically, deshuttering can take anywhere from 7 to 21 days for a beam of span 4 mtr

  • Answered by AI
  • Q2. What is the procedure to define one way and two way slab.How you will fix the reinforcement for two way slab
  • Ans. 

    To define one way and two way slab, we follow different procedures. For two way slab, reinforcement is fixed in both directions.

    • One way slab is defined as the slab in which the ratio of longer span to shorter span is greater than or equal to 2.

    • Two way slab is defined as the slab in which the ratio of longer span to shorter span is less than 2.

    • For two way slab, reinforcement is fixed in both directions to distribute the...

  • Answered by AI
  • Q3. Longer span/ shorter span less than or equal to 2 is called one way slab,more than 2 is called two way slab.In one way slab main bar placeing should be shorter detection & two way slab main bar should be...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident.listen all the question carefully before you give the answer.If you don't know the exact answer say sorry.

I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Sewerage System - Design Standards
  • Ans. 

    Design standards for sewerage system

    • Design standards vary based on location and regulations

    • Consideration should be given to factors such as population density, topography, and soil type

    • Standards may include minimum pipe diameter, slope, and depth

    • Examples of design standards include ASCE 15 and EPA guidelines

  • Answered by AI
  • Q2. Load distribution method

Interview Preparation Tips

Interview preparation tips for other job seekers - Hydraulic Design of sewerage & drainage system.
Longitudinal section of Hydraulic line

I applied via Company Website

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Hi this sudhir here a diploma holder in civil high rise building construction .I know the grade of concrete for building construction and finishing work knowledge also I have.

Round 3 - Technical 

(2 Questions)

  • Q1. Why we mix addmixture in concrete
  • Ans. 

    Admixtures are added to concrete to improve its properties and performance.

    • Admixtures enhance the workability and durability of concrete.

    • They can reduce the water content required for a given slump, making the concrete more cohesive.

    • Admixtures can accelerate or retard the setting time of concrete.

    • They improve the strength, durability, and resistance to chemical attack of concrete.

    • Examples of admixtures include water re...

  • Answered by AI
  • Q2. What is M25 cube strangth
  • Ans. 

    M25 cube strength refers to the compressive strength of concrete with a mix ratio of 1:1:2.

    • M25 cube strength is a measure of the ability of concrete to withstand compression.

    • It is denoted by the characteristic strength of a concrete cube tested at 28 days.

    • M25 grade concrete has a mix ratio of 1:1:2 (cement:sand:aggregate).

    • The cube strength of M25 concrete is typically around 25 MPa or 3625 psi.

    • It is important for struc...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work hard.complete. the projects as per company requirements and also give the positive input to the company .minimum loss for company complete the projects

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

11 Questions

  • Q1. How many years of experience?
  • Q2. Total experience about Water Supply Project out of 13years
  • Q3. Do you work in Consultancy firm & ask about of company ?
  • Ans. Yes, like Wapcos Ltd, LN Malviya infra & and described my roll
  • Answered Anonymously
  • Q4. Asked about inspection that how to check quality of work ?
  • Ans. During inspection of work check quality of material like cement, sand, aggregate, bricks, tmt steel bar, etc. as per IS codes/spec. Quality in Struct
  • Answered Anonymously
  • Q5. If contractors not compliance spec. Then what do you want or take action against.
  • Ans. 

    Take appropriate action against contractors not complying with specifications.

    • Identify the specific non-compliance issues

    • Communicate the non-compliance to the contractors

    • Request corrective actions or modifications to meet the specifications

    • Monitor and document the progress of corrective actions

    • Consider penalties or contract termination if non-compliance persists

  • Answered by AI
  • Q6. Asked about NCR full form
  • Ans. Non conformance Report or Non conformity reports
  • Answered Anonymously
  • Q7. Asked describe about NCR
  • Ans. A non-conformance report, non-conformity report or NCR, is a design and construction-related document that addresses issues where there has been a deviation from the project specification or where work fails to meet agreed quality standards
  • Answered Anonymously
  • Q8. Asked about preparation of financial & physical progress
  • Ans. Financial progress is certified amount which is taken from certified RA Bills . Physical progress is in ongoing progress of the project work which is taken from certified RA Bills qty. & running or ongoing qty.
  • Answered Anonymously
  • Q9. What is your CURRENT CTC & expected? Asked by HR.
  • Ans. Replied my ctc & want 30%hike
  • Answered Anonymously
  • Q10. Asked about working location
  • Q11. Asked about corrent CTC & expected
  • Ans. CTC +30%hike.then finally I have selected.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain about really experience which you have got & study about relevant IS codes & technical specifications.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Say about your any great achievement during your previous constitution professional experience & what was affort made by you?
  • Q2. Why you think that you are suitable for this position?
  • Q3. Your further most carrier goals?
  • Ans. 

    My further most career goal is to become a director of project management.

    • To gain experience in managing large-scale projects

    • To develop leadership and communication skills

    • To build a strong network of industry professionals

    • To continuously learn and stay updated with industry trends

    • To achieve PMP certification

    • To work towards becoming a subject matter expert in project management

    • To mentor and train junior project managers

    • ...

  • Answered by AI

Facilities And Building Solutions Interview FAQs

How many rounds are there in Facilities And Building Solutions Head - Projects interview?
Facilities And Building Solutions interview process usually has 1 rounds. The most common rounds in the Facilities And Building Solutions interview process are Technical.
What are the top questions asked in Facilities And Building Solutions Head - Projects interview?

Some of the top questions asked at the Facilities And Building Solutions Head - Projects interview -

  1. Construction of start till end with contractual con...read more
  2. All technical related start till ...read more
  3. Long interview 2 hr over f...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 341 Interviews
CBRE Interview Questions
4.2
 • 254 Interviews
Sodexo Interview Questions
4.1
 • 159 Interviews
AECOM Interview Questions
4.2
 • 111 Interviews
Apco Infratech Interview Questions
3.7
 • 111 Interviews
Bechtel Interview Questions
4.0
 • 65 Interviews
Samsung E&A Interview Questions
4.1
 • 59 Interviews
View all
Senior Project Engineer
47 salaries
unlock blur

₹4.2 L/yr - ₹9 L/yr

Project Engineer
37 salaries
unlock blur

₹3.5 L/yr - ₹7 L/yr

Assistant Manager
21 salaries
unlock blur

₹6 L/yr - ₹9.6 L/yr

Project Manager
16 salaries
unlock blur

₹8 L/yr - ₹14.4 L/yr

Senior Safety Officer
13 salaries
unlock blur

₹4.8 L/yr - ₹7.3 L/yr

Explore more salaries
Compare Facilities And Building Solutions with

JLL

4.1
Compare

CBRE

4.2
Compare

Cushman & Wakefield

4.2
Compare

Knight Frank

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview