I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Jan 2022. There were 3 interview rounds.
Project control requirement documents include plans, procedures, and guidelines for managing and monitoring project activities.
Project management plan
Quality management plan
Risk management plan
Change management plan
Configuration management plan
Project procedures and guidelines
Top trending discussions
I applied via Naukri.com and was interviewed before Jan 2021. There were 2 interview rounds.
The question is about requirements for WPS PQR, piping, and tank RT.
WPS (Welding Procedure Specification) and PQR (Procedure Qualification Record) are required for welding processes.
Piping requirements include material selection, design, fabrication, installation, and testing.
Tank RT (Radiographic Testing) requirements involve inspecting welds and joints for defects using X-rays or gamma rays.
All of these requirements ...
I applied via Naukri.com
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Naukri.com
based on 2 interviews
Interview experience
based on 6 reviews
Rating in categories
Senior Engineer
119
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Engineer
112
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Assistant Engineer
97
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
75
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Energy Hydrocarbon
Tata Projects
Thermax Limited
BGR Energy Systems