Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Toyo Engineering Team. If you also belong to the team, you can get access from here

Toyo Engineering Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Toyo Engineering Piping Engineer Interview Questions and Answers

Updated 17 Oct 2023

Toyo Engineering Piping Engineer Interview Experiences

3 interviews found

Piping Engineer Interview Questions & Answers

user image SAGAR J RANE

posted on 16 Jun 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Normally questions on Pipe Rack Pump Piping Exchanger Piping Column Piping Please go thru your CV thoroughly & ensure you can answer all related questions
  • Q2. Answers are not only oral but you may be asked to sketch.
Round 3 - HR 

(1 Question)

  • Q1. HR round is generally background verification (Acadmics)
Round 4 - HR 

(1 Question)

  • Q1. Salary negotiation is done in this

Piping Engineer Interview Questions & Answers

user image kiran ingawale

posted on 17 Oct 2023

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
No response

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell me about your self
  • Q2. Basic info and tell about background

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Piping Engineer Interview Questions Asked at Other Companies

Q1. What is the basic difference between Pipe specification A106 Gr.A ... read more
Q2. From which size onwards NB of pipe is equal to OD of Pipe?
Q3. What is the most commonly used material for Gasket?
Q4. How can flanges be classified based on face finish?
asked in Worley
Q5. what precaution should be taken before starting any confined spac ... read more
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Pipe rack Pump Column Compressor
  • Q2. Pipe Materials, Basic Table Valve Trims Valve seats
  • Q3. Pipe support spans Compressor supports Loops on the Pipe rack
  • Ans. 

    Pipe support spans are crucial for the safe and efficient operation of piping systems.

    • Pipe support spans must be designed to prevent excessive deflection and stress on the piping system.

    • Compressor supports must be designed to handle the weight and vibration of the compressor.

    • Loops on the pipe rack are used to accommodate thermal expansion and contraction of the piping system.

    • Proper pipe support design can prevent leaks

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare questions as above
Answer confidently
Apply through contractor for 3D modeling in case of Job urgency

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Recruitment Consultant and was interviewed in Feb 2020. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. 1) About my work experience and the points updated in my cv.
  • Q2. 2) Asked me to draw pump suction and discharge and how would you extract MTO from that drawing
  • Q3. Few other questions related to the tool sp3d and pdms

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident while answering sometimes your confidence shows more then the correct answers

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Errection and maintenance related
  • Q2. Installation of b/plant, tower crain etc
  • Q3. Aggregate processing plant, screen house, primary crusher, secondary crusher, conveyor belt errection,fluit coupling repairing work

Interview Preparation Tips

Interview preparation tips for other job seekers - All over India telephonic or walk-in interview please call my no for interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Why leave the previous company?
  • Q2. Tell us something about yourself
Round 3 - Assignment 

Total 3 rounds of interview were conducted

Round 4 - HR 

(1 Question)

  • Q1. Salary is getting higher

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept

Toyo Engineering Interview FAQs

How many rounds are there in Toyo Engineering Piping Engineer interview?
Toyo Engineering interview process usually has 2-3 rounds. The most common rounds in the Toyo Engineering interview process are Resume Shortlist, Technical and HR.
How to prepare for Toyo Engineering Piping Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Toyo Engineering. The most common topics and skills that interviewers at Toyo Engineering expect are ANSI, Engineering Consultancy, Fabrication, Heat Exchangers and ISO.
What are the top questions asked in Toyo Engineering Piping Engineer interview?

Some of the top questions asked at the Toyo Engineering Piping Engineer interview -

  1. Pipe support spans Compressor supports Loops on the Pipe r...read more
  2. Normally questions on Pipe Rack Pump Piping Exchanger Piping Column Piping Ple...read more
  3. Answers are not only oral but you may be asked to sket...read more

Tell us how to improve this page.

Toyo Engineering Piping Engineer Interview Process

based on 3 interviews

1 Interview rounds

  • Resume Shortlist Round
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 116 Interviews
Apco Infratech Interview Questions
3.7
 • 114 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 60 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
Toyo Engineering Piping Engineer Salary
based on 113 salaries
₹4.2 L/yr - ₹14.1 L/yr
13% more than the average Piping Engineer Salary in India
View more details

Toyo Engineering Piping Engineer Reviews and Ratings

based on 21 reviews

4.0/5

Rating in categories

4.1

Skill development

3.1

Work-life balance

4.0

Salary

4.1

Job security

3.5

Company culture

3.5

Promotions

3.7

Work satisfaction

Explore 21 Reviews and Ratings
Senior Engineer
120 salaries
unlock blur

₹9.6 L/yr - ₹34 L/yr

Piping Engineer
113 salaries
unlock blur

₹4.2 L/yr - ₹14.1 L/yr

Senior Assistant Engineer
97 salaries
unlock blur

₹5 L/yr - ₹15.2 L/yr

Project Engineer
90 salaries
unlock blur

₹4.5 L/yr - ₹18.6 L/yr

Engineer
69 salaries
unlock blur

₹8 L/yr - ₹25.5 L/yr

Explore more salaries
Compare Toyo Engineering with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.9
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview